CN202791082U CN201220453284.6U CN201220453284U CN202791082U CN 202791082 U CN202791082 U CN 202791082U CN 201220453284 U CN201220453284 U CN 201220453284U CN 202791082 U CN202791082 U CN 202791082U
Authority
CN
China
Prior art keywords
manhole
prefabricated
draining
pipeline
exhaust
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201220453284.6U
Other languages
Chinese (zh)
Inventor
张显忠
蒋玖璐
徐平
王家华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Design Research Institute Co ltd
Original Assignee
Shanghai Urban Construction Design Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Design Research Institute Co ltd filed Critical Shanghai Urban Construction Design Research Institute Co ltd
Priority to CN201220453284.6U priority Critical patent/CN202791082U/en
Application granted granted Critical
Publication of CN202791082U publication Critical patent/CN202791082U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a draining, exhausting and manhole combined tee joint prefabricated pipe section for a water conveying main pipe. The tee joint prefabricated pipe section comprises a prefabricated pipeline, as well as an exhausting hole, a draining hole and the manhole, which are formed on the peripheral surface of the prefabricated pipeline in a communication manner; the exhausting hole is formed at the upper part of the peripheral surface of the prefabricated pipeline in a communication manner, the draining hole is formed at the lower part of the peripheral surface of the prefabricated pipeline in a communication manner, and the manhole is formed on the middle lower side of the peripheral surface of the prefabricated pipeline in a communication manner. According to the pipe section, the exhausting hole, the draining hole and the manhole are formed in the same prefabricated pipeline in advance, the site construction difficulty is reduced greatly, multiple functions of maintenance, evacuation, exhausting and the like are achieved at the same time, the quantity of working wells can be reduced greatly through the application of the water conveying main pipe of the prefabricated pipe section, and further, the construction cost is reduced, construction maintenance of a plurality of parts can be conducted in the same working well at the same time, and the unified management and maintenance of the water conveying pipe are more convenient.

Description

The draining, exhaust, the prefabricated tube coupling of manhole combination threeway that are used for delivery main
Technical field
The utility model relates to the drainage pipe facility technology field in the engineering of paddling, and relates in particular to a kind of draining for delivery main, exhaust, the prefabricated tube coupling of manhole combination threeway.
Background technique
Along with China's economic development, increasing city begins to build the large-scale water delivery engineering of long distance.In long distance water transfer project, need to be on different tube couplings on the delivery main parts such as installation of relief valve, outlet valve, manhole.In present water delivery engineering, the setting position of all parts of delivery main disperses, parts on the corresponding diverse location all need to arrange separately an active well, great in constructing amount, and be unfavorable for unified management, the maintenance of delivery main, simultaneously also take more space, improved engineering cost.
Therefore, those skilled in the art is devoted to develop a kind of draining for delivery main, exhaust, the prefabricated tube coupling of manhole combination threeway to address the above problem.
The model utility content
Because the defects of prior art, technical problem to be solved in the utility model provide a kind of for long apart from can realize simultaneously on the Large Diameter Pipeline delivery main overhauling, the prefabricated tube coupling of combination threeway of the multiple functions such as emptying, exhaust.
For achieving the above object, the utility model provides a kind of draining for delivery main, exhaust, the prefabricated tube coupling of manhole combination threeway, comprises prefabricated pipeline, and connects exhaust port, weep hole and the manhole that is arranged on the side of described prefabricated pipeline week.Described exhaust port connects the top that is arranged on side of described prefabricated pipeline week, described weep hole connects the bottom that is arranged on side of described prefabricated pipeline week, described manhole connects a centre side on the lower that is arranged on side of described prefabricated pipeline week, setting position is more reasonable, realize to a greater extent the performance of prefabricated pipeline, improve applicability of the present utility model.
The utility model sets in advance exhaust port, weep hole and manhole on same prefabricated pipeline, reduced greatly the difficulty of site operation, realize simultaneously the multiple functions such as maintenance, emptying, exhaust, because with being arranged on the same tube coupling of exhaust port, weep hole and manhole compactness, the delivery main of using the prefabricated tube coupling of the utility model will greatly reduce the magnitude setting of active well, then realize the decline of engineering cost, and can in same active well, carry out Construction and Maintenance to a plurality of parts simultaneously, more be convenient to unified management, the maintenance of delivery main.
Better, be provided with outward extending exhaust fitting on the described exhaust port, make things convenient for externally connected exhaust pipe, further reduce the difficulty of site operation.
Better, be provided with outward extending emptying pipe joint on the described weep hole, length and the angle of extension can be set as required, improve drainage performance.
Better, be provided with outward extending current pipeline on the described manhole, length and the angle of extension can be set as required, further facilitate operator and pass in and out and carry out maintenance and inspection in the delivery main.
Better, the end portion of described prefabricated pipeline is provided with recessed head or the plush copper of being convenient to adjacent described prefabricated pipeline splicing, by recessed head or plush copper are set as connecting head in the termination, can recessed head or plush copper all be set in two ends, arrange to realize being connected of plush copper and recessed head by the interval, also at one end head arranges recessed head, another termination arranges plush copper, directly recessed head, the plush copper with adjacent tube coupling connects, and realizes the flexible connection of prefabricated tube coupling of the present utility model on delivery main.
In sum, the utility model be a kind ofly can realize simultaneously overhauling, the prefabricated tube coupling of combination threeway of the multiple function such as emptying, exhaust, be applied in the workload that not only can reduce the engineering site construction on the delivery main, and the volume that can effectively reduce active well takes up room and reduces the magnitude setting of active well, greatly reduces engineering cost; In addition, the utility model connects flexibly, and it is convenient to install, overhaul, and can move more safely and effectively under the operating modes such as installation, debugging, cleaning and maintenance.
Be described further below with reference to the technique effect of accompanying drawing to design of the present utility model, concrete structure and generation, to understand fully the purpose of this utility model, feature and effect.
Description of drawings
Fig. 1 is the plan view of the utility model specific embodiment.
Fig. 2 is the plan view of the utility model specific embodiment.
Fig. 3 is the A-A schematic cross-section of Fig. 2.
Fig. 4 is the B-B schematic cross-section of Fig. 2.
Fig. 5 is the C-C schematic cross-section of Fig. 2.
Embodiment
As depicted in figs. 1 and 2, a kind of draining for delivery main of a specific embodiment of the present utility model, exhaust, the prefabricated tube coupling of manhole combination threeway, comprise prefabricated pipeline 1, and connect exhaust port 2, weep hole 3 and the manhole 4 that is arranged on prefabricated pipeline 1 all sides.
Concrete, shown in accompanying drawing 1 and accompanying drawing 3, exhaust port 2 connects the top that is arranged on prefabricated pipeline 1 all sides, and is provided with outward extending exhaust fitting 5 at exhaust port 2, makes things convenient for externally connected exhaust pipe.
Shown in accompanying drawing 1 and accompanying drawing 4, weep hole 3 connects the bottom that is arranged on prefabricated pipeline 1 all sides, and is provided with outward extending emptying pipe joint 6 at weep hole 3, makes things convenient for the external connection row blank pipe.
Shown in accompanying drawing 1 and accompanying drawing 5, manhole 4 connects a centre side on the lower that is arranged on prefabricated pipeline 1 all sides, and is provided with outward extending current pipeline 7 at manhole 4, further facilitates operator and passes in and out and carry out maintenance and inspection in the delivery main.
One termination of the prefabricated pipeline 1 in the present embodiment is provided with the recessed head of being convenient to the adjacent channel splicing, another termination is provided with is convenient to the plush copper that adjacent channel splices and recessed adaptive, certainly, can also recessed head or plush copper all be set in two ends, arrange to realize being connected of plush copper and recessed head by the interval.
More than describe preferred embodiment of the present utility model in detail.Should be appreciated that those of ordinary skill in the art need not creative work and just can make many modifications and variations according to design of the present utility model.Therefore, all in the art technician comply with design of the present utility model on the basis of existing technology by the available technological scheme of logical analysis, reasoning, or a limited experiment, all should be in the determined protection domain by claims.

Claims (5)

1. draining, exhaust, the prefabricated tube coupling of manhole combination threeway that is used for delivery main is characterized in that: comprise prefabricated pipeline, and connect exhaust port, weep hole and the manhole that is arranged on the side of described prefabricated pipeline week; Described exhaust port connects the top that is arranged on side of described prefabricated pipeline week, and described weep hole connects the bottom that is arranged on side of described prefabricated pipeline week, and described manhole connects a centre side on the lower that is arranged on side of described prefabricated pipeline week.
2. the draining for delivery main as claimed in claim 1, exhaust, the prefabricated tube coupling of manhole combination threeway is characterized in that: be provided with outward extending exhaust fitting on the described exhaust port.
3. the draining for delivery main as claimed in claim 1, exhaust, the prefabricated tube coupling of manhole combination threeway is characterized in that: be provided with outward extending emptying pipe joint on the described weep hole.
4. the draining for delivery main as claimed in claim 1, exhaust, the prefabricated tube coupling of manhole combination threeway is characterized in that: be provided with outward extending current pipeline on the described manhole.
5. the draining for delivery main as claimed in claim 1, exhaust, the prefabricated tube coupling of manhole combination threeway is characterized in that: the end portion of described prefabricated pipeline is provided with recessed head or the plush copper of being convenient to adjacent described prefabricated pipeline splicing.
CN201220453284.6U 2012-09-06 2012-09-06 Draining, exhausting and manhole combined tee joint prefabricated pipe section for water conveying main pipe Expired - Lifetime CN202791082U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201220453284.6U CN202791082U (en) 2012-09-06 2012-09-06 Draining, exhausting and manhole combined tee joint prefabricated pipe section for water conveying main pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201220453284.6U CN202791082U (en) 2012-09-06 2012-09-06 Draining, exhausting and manhole combined tee joint prefabricated pipe section for water conveying main pipe

Publications (1)

Publication Number Publication Date
CN202791082U true CN202791082U (en) 2013-03-13

Family

ID=47818345

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201220453284.6U Expired - Lifetime CN202791082U (en) 2012-09-06 2012-09-06 Draining, exhausting and manhole combined tee joint prefabricated pipe section for water conveying main pipe

Country Status (1)

Country Link
CN (1) CN202791082U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103644425A (en) * 2013-11-27 2014-03-19 中国瑞林工程技术有限公司 Manhole cover plate with rectification cover and vent valve of combined water supply pipeline

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103644425A (en) * 2013-11-27 2014-03-19 中国瑞林工程技术有限公司 Manhole cover plate with rectification cover and vent valve of combined water supply pipeline

Similar Documents

Publication Publication Date Title
CN105298510B (en) Pipe replacing and slurry discharging device for slurry shield and slurry discharging mode
CN202755380U (en) Tee joint working well for long-distance large-pipe-diameter underground water delivery main pipe system
CN202791082U (en) Draining, exhausting and manhole combined tee joint prefabricated pipe section for water conveying main pipe
CN202316434U (en) Pipeline cleaning device
CN202298873U (en) Novel GRP (glass-reinforced plastic) drainage inspection well
CN206917270U (en) A kind of adjustable mould that hangs blocks up hole mould
CN207017424U (en) A kind of pipe-dredging machine people
CN202247998U (en) Underground continuous wall joint cleaner
CN214144450U (en) Building balcony waste water rainwater reposition of redundant personnel structure
CN203198057U (en) Combined type dust-prevention and noise-reduction concrete mixer
CN206957243U (en) A kind of intelligent curtain wall installation mechanical structure
CN205688450U (en) One is drawn water pipeline multithread charge for remittance device
CN208762821U (en) A kind of town road water supply and sewerage pipeline
CN202755379U (en) Communication section working well for long-distance large-pipe-diameter underground water delivery main pipe system
CN202755401U (en) Long-distance large-pipe-diameter underground water delivery main pipe system
CN204199482U (en) The body of wall of strong and weak electronic box, penetration pipe concrete hollow block
CN204704491U (en) Integratedly build water string
CN205530136U (en) Modular water conservancy ditch rapid prototyping device
CN205918395U (en) Solid controlling system suction line arrangement structure
CN205189420U (en) Novel construction is with defeated material device
CN204849828U (en) Bearing type checking well concrete block
CN204728313U (en) The simple and easy rigidity piecing devices of a kind of diaphragm wall
CN202325681U (en) Maintainable drainage system in tunnel
CN203559446U (en) Oil tube protection structure of dozer blade and excavator
CN102817397A (en) Long-distance large-pipe diameter underground water conveying main pipe system