CN202786455U - Delay control mode for crust breaking partial pressure air supply - Google Patents

Delay control mode for crust breaking partial pressure air supply Download PDF

Info

Publication number
CN202786455U
CN202786455U CN 201220165774 CN201220165774U CN202786455U CN 202786455 U CN202786455 U CN 202786455U CN 201220165774 CN201220165774 CN 201220165774 CN 201220165774 U CN201220165774 U CN 201220165774U CN 202786455 U CN202786455 U CN 202786455U
Authority
CN
China
Prior art keywords
crust breaking
air
breaking cylinder
delay
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220165774
Other languages
Chinese (zh)
Inventor
李晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Aisuo Energy Polytron Technologies Inc
Original Assignee
BEIJING ECOSO TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING ECOSO TECHNOLOGY DEVELOPMENT Co Ltd filed Critical BEIJING ECOSO TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN 201220165774 priority Critical patent/CN202786455U/en
Application granted granted Critical
Publication of CN202786455U publication Critical patent/CN202786455U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Fluid-Pressure Circuits (AREA)

Abstract

The utility model relates to a novel energy-saving technology which belongs to the field of pneumatic system energy conservation. A delay control mode mainly aims at the air loop control of a crust breaking cylinder of the electrolytic aluminium industry, the air leakage rate of the crust breaking cylinder can be greatly reduced, and the utilization rate of compressed air is increased. The delay control mode is used on the air loop control of the crust breaking cylinder of the electrolytic aluminium industry, and air supply pressure is reasonably switched according to the requirements of working conditions through air supply pressure remote control. When a crust breaking signal exists, a directional control valve of a partial pressure air supply loop is reversed to supply air source pressure, so that the crust breaking cylinder extends out; when the crust breaking signal disappears, the directional control valve is maintained unchanged through a time delay device, the air source pressure is also supplied, so that the crust breaking cylinder retracts; and when the time delay is reached, the directional control valve is reversed, the air supply pressure is reduced to be supplied for the crust breaking cylinder, the crust breaking cylinder enters a maintaining state at low pressure, the air leakage rate of the crust breaking cylinder is reduced, the air consumption is reduced, and an energy-saving purpose is realized.

Description

The time-delay control mode that is used for crust breaking dividing potential drop air feed
Technical field:
The invention belongs to energy-saving field of pneumatic, relate to the pneumatic control system of aluminum electrolysis industry.
Background technology:
The air consumption of aluminum electrolysis industry crust breaking cylinder accounts for more than 40% of whole plant compressed air usage quantity, impact on whole plant energy consumption is most important, and effectively reducing the compressed-air actuated consumption of crust breaking cylinder, raising cylinder pressurized air service efficiency is to solve the energy-conservation effective way of aluminum electrolysis industry pneupress system.
Crust breaking cylinder is energy-conservation to be the key component of energy-saving field of pneumatic in the aluminum electrolysis industry, pneumatic system is because the adjusting of low, pollution-free, the easy care of cost, power output and working speed such as is very easy at the advantage plays an important role in industrial automation, but the energy consumption of crust breaking cylinder accounts for pneumatic system total energy consumption significant proportion and capacity usage ratio is not high.In today that energy problem becomes increasingly conspicuous, the energy-conservation of crust breaking cylinder has great significance to the energy-saving and cost-reducing of aluminum electrolysis industry.
The air feed of domestic and international existing crust breaking cylinder is to adopt single forced air supply, i.e. stretching out, retracting and all adopt identical bleed pressure air feed during maintenance at crust breaking cylinder.Because electrolyzer temperature is high, the easy impaired inefficacy of sealing in the cylinder end piece of the piston rod side of crust breaking cylinder is leaked serious when cylinder keeps.Be head it off, this patent changes the air feed of cylinder into high pressure and two kinds of forced air supplies of low pressure by single pressure.Cylinder stretch out or when retracting because high pressure gas are supplied with in the requirement of technique, and the air feed that reduces pressure when cylinder keeps is realized energy control for need like this, can reduce the leakage under the cylinder maintaining condition, the reduction compressed air consumption.
Summary of the invention:
Purpose of the present invention:
For aluminum electrolysis industry provides a kind of novel energy-conserving crust breaking Decompression Controlling winding machine solar term more than 30%.
Description of drawings:
Fig. 1 is the crust breaking cylinder work circuit theory figure of this patent: 1. crust breaking cylinder, 2. direction reversing valve, 3. reducing valve
Fig. 2 is the gas-control timing device: 4. gas inlet, 5. pneumatic outlet, 6. air-capacitor, 7. check valve, 8. restriction.
Technical scheme of the present invention:
1 but crust breaking signal when adopting electrical control signal:
The crust breaking electric signal sometimes, dividing potential drop is supplied with bleed pressure for the commutation of the direction control valve (2) of air circuit, crust breaking cylinder (1) stretches out; When the crust breaking electric signal disappeared, by the electrical delay device, direction control valve (2) remained unchanged, and still supplies with bleed pressure, and crust breaking cylinder (1) is retracted; When delay time reaches, direction control valve (2) commutation, bleed pressure is supplied with crust breaking cylinder (1) after through decompression, and crust breaking cylinder (1) enters maintaining condition under low pressure.
The electrical delay device is comprised of time-delay cut-off switch and timing register, and its delay time is set by timing register.
2 but crust breaking signal when adopting pneumatic control signal:
When the crust breaking pneumatic singal sometimes, dividing potential drop is supplied with bleed pressure for the commutation of the direction control valve (2) of air circuit, crust breaking cylinder (1) stretches out; When the crust breaking pneumatic singal disappeared, by Pneumatic time delay device, direction control valve (2) remained unchanged, and still supplies with bleed pressure, and crust breaking cylinder (1) is retracted; When delay time reaches, direction control valve (2) commutation, bleed pressure is supplied with crust breaking cylinder (1) after through decompression, and crust breaking cylinder (1) enters maintaining condition under low pressure.
Pneumatic time delay device is composed in parallel by air-capacitor (6) and check valve (7).When the crust breaking pneumatic singal was opened, (4) flowed into the signal air-flow from the gas inlet, are full of air-capacitor (6) in the time of to pneumatic outlet (5) output gas flow; During the crust breaking signal at stop, the signal air-flow stops inflow gas entrance (4), is stored in the gas of air-capacitor (6) to pneumatic outlet (5) or restriction (8) output gas flow, and pressure descends gradually.Its delay time is set by the opening degree of adjusting joint head piece (8).

Claims (4)

1. electrical delay control device that is used for crust breaking dividing potential drop air feed, it is characterized in that: the electrical delay device is comprised of time-delay cut-off switch and timing register, and its delay time is set by timing register.
2. Pneumatic time-delay control device that is used for crust breaking dividing potential drop air feed, it is characterized in that: supply with bleed pressure, crust breaking cylinder (1) stretches out.
3. realize electrical delay device claimed in claim 1, it is characterized in that: the electrical delay device is comprised of time-delay cut-off switch and timing register, and its delay time is set by timing register.
4. realize Pneumatic time delay device claimed in claim 2, it is characterized in that: Pneumatic time delay device is composed in parallel by air-capacitor (6) and check valve (7), and air-capacitor (6) is to throttling valve (8) output gas flow.
CN 201220165774 2012-04-19 2012-04-19 Delay control mode for crust breaking partial pressure air supply Expired - Lifetime CN202786455U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220165774 CN202786455U (en) 2012-04-19 2012-04-19 Delay control mode for crust breaking partial pressure air supply

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220165774 CN202786455U (en) 2012-04-19 2012-04-19 Delay control mode for crust breaking partial pressure air supply

Publications (1)

Publication Number Publication Date
CN202786455U true CN202786455U (en) 2013-03-13

Family

ID=47813752

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220165774 Expired - Lifetime CN202786455U (en) 2012-04-19 2012-04-19 Delay control mode for crust breaking partial pressure air supply

Country Status (1)

Country Link
CN (1) CN202786455U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104595272A (en) * 2015-01-30 2015-05-06 杭州俊球科技有限公司 Air saving system of cylinder
CN106321566A (en) * 2016-11-14 2017-01-11 河南锦源环保科技有限公司 Super-long pneumatic time-delaying device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104595272A (en) * 2015-01-30 2015-05-06 杭州俊球科技有限公司 Air saving system of cylinder
CN104595272B (en) * 2015-01-30 2017-02-22 诸江 Air saving system of cylinder
CN106321566A (en) * 2016-11-14 2017-01-11 河南锦源环保科技有限公司 Super-long pneumatic time-delaying device
CN106321566B (en) * 2016-11-14 2018-03-06 河南锦源环保科技有限公司 A kind of overlength Pneumatic time delay device

Similar Documents

Publication Publication Date Title
CN102828202B (en) Novel intelligent crust breaking cylinder
CN202595294U (en) Delay control circuit for crust breaking partial pressure gas supply
CN202595292U (en) Energy-saving oriented crust breaking partial pressure gas supply circuit
CN202786455U (en) Delay control mode for crust breaking partial pressure air supply
CN202830192U (en) Novel intelligent crust breaking cylinder
CN203594974U (en) Pressure stabilizing and reclaiming device for high-pressure nitrogen
CN101498323A (en) Long life energy-saving mute type booster valve
CN103410717B (en) Hydraulic drill carriage air compressor system unloading control device and method
CN203049052U (en) Electronic control type shell breaking and pressure dividing air supply control circuit
CN201963643U (en) Cylinder exhaust recovery energy-saving control device
CN203284480U (en) Multifunctional control system for electrolytic aluminium crust breaking
CN102878145B (en) Energy-saving crust cylinder for electrolytic aluminium industry
CN204476912U (en) Cylinder gas saving system
CN203717298U (en) Energy-saving device for air compressor
CN202595293U (en) Energy-saving-oriented crust breaking decompression control mechanism
CN102534681B (en) Novel energy-saving air throttle for controlling air in crust breaking cylinders
CN202971436U (en) Pneumatic control circuit and aluminum electrolysis cell including the same
CN107131118B (en) A kind of pressure fan group linkage mixed control method
CN102619799B (en) Efficient energy-saving adjustable electronic control electrolytic aluminum crust breaking valve terminal system
CN103451677B (en) Crust breaking cylinder choking system and air supply method
CN203159730U (en) Throttle valve of crust breaking cylinder
CN204572606U (en) Solar term low noise type valve snap switch pneumatic system
CN203159729U (en) Air control throttle valve of crust breaking cylinder
CN204024961U (en) The passive Pneumatic booster device of a kind of underground coal mine
CN102400969B (en) Throttling pneumatic valve for crust breaking cylinder for aluminum electrolytic tank

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 100191 A506 computer building, No. 38, Xueyuan Road, Beijing, Haidian District,

Patentee after: Beijing Aisuo energy Polytron Technologies Inc

Address before: 100191 A506 computer building, No. 38, Xueyuan Road, Beijing, Haidian District,

Patentee before: Beijing ECOSO Technology Development Co., Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Delay control mode for crust breaking partial pressure air supply

Effective date of registration: 20200428

Granted publication date: 20130313

Pledgee: Beijing technology intellectual property financing Company limited by guarantee

Pledgor: BEIJING ECOSO ENERGY TECHNOLOGY Co.,Ltd.

Registration number: Y2020990000406

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220324

Granted publication date: 20130313

Pledgee: Beijing technology intellectual property financing Company limited by guarantee

Pledgor: BEIJING ECOSO ENERGY TECHNOLOGY CO.,LTD.

Registration number: Y2020990000406

PC01 Cancellation of the registration of the contract for pledge of patent right
CX01 Expiry of patent term

Granted publication date: 20130313