CN202777675U - Novel badminton net adjustment device - Google Patents
Novel badminton net adjustment device Download PDFInfo
- Publication number
- CN202777675U CN202777675U CN 201220142019 CN201220142019U CN202777675U CN 202777675 U CN202777675 U CN 202777675U CN 201220142019 CN201220142019 CN 201220142019 CN 201220142019 U CN201220142019 U CN 201220142019U CN 202777675 U CN202777675 U CN 202777675U
- Authority
- CN
- China
- Prior art keywords
- bar
- net
- clamp
- metal hanger
- suspension strop
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000002184 metal Substances 0.000 claims abstract description 45
- 239000000725 suspension Substances 0.000 claims description 34
- 230000001105 regulatory effect Effects 0.000 claims description 4
- 229910000831 Steel Inorganic materials 0.000 abstract description 4
- 239000010959 steel Substances 0.000 abstract description 4
- 238000000034 method Methods 0.000 description 5
- 230000002146 bilateral effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
Images
Landscapes
- Supports Or Holders For Household Use (AREA)
Abstract
The utility model discloses a novel badminton net adjustment device. An existing net frame structure is inconvenient to move, the opposite pulling mode enables a steel rope to bear large stress, and the weight of a base need increasing to guarantee balance of stand columns. According to the novel badminton net adjustment device, a first metal hanging object is connected with one end of a first hanging rope through a first pothook, the other end of the first handing rope is connected with the left section of a rod, a second metal hanging object is connected with one end of a second hanging rope through a second pothook, and the other end of the second hanging rope is connected with the right section of the rod. The whole rod penetrates through a net sleeve located on the upper end of a net belt, the left end and the right end of the middle section of the rod are respectively clamped into a first U-shaped clamping groove and a second U-shaped clamping groove, wherein the first U-shaped clamping groove is formed in the top end of a first badminton net support, and the second U-shaped clamping groove is formed in the top end of a second badminton net support. The inner sides of the first badminton net support and the second badminton net support are respectively provided with three metal pothooks, and the metal pothooks are respectively connected with the left and right sides of the net belt through tying ropes. The novel badminton net adjustment device is convenient to operate, and high in adjustment accuracy, the net support is simplified, and weight of the net frame is lightened.
Description
Technical field
The utility model belongs to ball sport technique with the apparatus field, relates in particular to a kind of Novel badminton net adjusting device.
Background technology
Along with popularizing of these sports of shuttlecock, people are also more and more higher to the requirement in shuttlecock place.Badminton net and relevant rack are badminton game, training and the indispensable equipment of at ordinary times amusement.What adopt in present most of stadiums is that heavy base adds the bilateral to drawing mode or column being fixed in ground of column.Such grid structure moves inconvenience, and to the form of drawing so that the force rate on the steel wire rope is larger, increase the weight of the balance that base guarantees column.Bilateral to the mode of drawing under, the net level of tightness, the height in the middle of the height in net centre position namely, General Requirements badminton net is almost consistent with both sides, official standard regulation both sides height is 1.55 meters, intermediate altitude is 1.524 meters.Reach such effect, the power on the steel wire rope will reach several hectonewtons, and is very inconvenient in regulating the process of net height, and be difficult to the standard that reaches required.
Summary of the invention
The utility model purpose is for the deficiencies in the prior art, and a kind of Novel badminton net adjusting device is provided, can the tensioning guipure, can adjust again net centre position height.
The utility model comprises the first metal hanger, the first suspension strop, metal hanger, tether, guipure, the first U-shaped draw-in groove, bar, the first hook, the first clamp, the second metal hanger, the second suspension strop, the second hook, the second U-shaped draw-in groove, the second clamp.The first metal hanger is connected with an end of the first suspension strop by the first hook; The other end of the first suspension strop is connected with the left bar of bar; The second metal hanger is connected with an end of the second suspension strop by the second hook; The other end of the second suspension strop is connected with the right bar of bar;
Whole bar runs through the net of guipure upper end, and the two ends, the left and right sides of king-rod snap in respectively the first U-shaped draw-in groove on the first clamp top and the second U-shaped draw-in groove on the second clamp top; The first clamp, the second clamp inboard are provided with three metal hangers, and metal hanger is connected with the guipure left and right sides by tether;
The structure of described the first metal hanger, the first suspension strop, the first U-shaped draw-in groove, the first hook, the first clamp is linked up with the second metal hanger, the second suspension strop, the second U-shaped draw-in groove, second respectively, the second clamp is identical;
Described bar is comprised of integrally formed, identical left bar, king-rod, the right bar of size; Its left bar, right pole length are identical;
The tie point of described the first suspension strop and bar can be in left bar free adjustment; The tie point of the second suspension strop and bar can be in right bar free adjustment;
The weight of described the first metal hanger, the second metal hanger can be regulated as required.
The utility model beneficial effect is as follows:
The utility model has changed the net tensioning pattern of drawing by the steel wire rope biconjugate, adopts rigid rod to support, and has hardly side draw on the support, need not to increase the weight of base, has reduced simultaneously manufacturing cost; Make things convenient for the centre position Height Adjustment of badminton net, improved the adjustment precision, can carry out light-weight design to support, be convenient to mobile; More convenient operation, degree of regulation is higher, and has simplified rack, has alleviated the rack quality.
Description of drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the utility model support schematic diagram.
Among the figure, the first metal hanger 1, the first suspension strop 2, metal hanger 3, tether 4, guipure 5, the first U-shaped draw-in groove 6, bar 7, the first hook the 8, first clamp 9, the second metal hanger 10, the second suspension strop 11, the second hook the 12, second U-shaped draw-in groove 13, the second clamp 14.
The specific embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
A kind of Novel badminton net adjusting device comprises the first metal hanger 1, the first suspension strop 2, metal hanger 3, tether 4, guipure 5, the first U-shaped draw-in groove 6, bar 7, the first hook the 8, first clamp 9, the second metal hanger 10, the second suspension strop 11, the second hook the 12, second U-shaped draw-in groove 13, the second clamp 14.The first metal hanger 1 is connected with an end of the first suspension strop 2 by the first hook 8; The other end of the first suspension strop 2 is connected with the left bar of bar 7; The second metal hanger 10 is connected with an end of the second suspension strop 11 by the second hook 12; The other end of the second suspension strop 11 is connected with the right bar of bar 7;
Whole bar 7 runs through the net of guipure 5 upper ends, and the two ends, the left and right sides of king-rod snap in respectively the first U-shaped draw-in groove 6 on the first clamp 9 tops and the second U-shaped draw-in groove 13 on the second clamp 14 tops; The first clamp 9, the second clamp 14 inboards are provided with three metal hangers 3, and metal hanger 3 is connected with guipure 5 left and right sides by tether 4;
The structure of described the first metal hanger 1, the first suspension strop 2, the first U-shaped draw-in groove 6, the first hook the 8, first clamp 9 is identical with the second metal hanger 10, the second suspension strop 11, the second U-shaped draw-in groove 13, the second hook the 12, second clamp 14 respectively;
Described bar 7 is comprised of integrally formed, identical left bar, king-rod, the right bar of size; Its left bar, right pole length are identical;
The tie point of described the first suspension strop 2 and bar 7 can be in left bar free adjustment; The tie point of the second suspension strop 11 and bar 7 can be in right bar free adjustment;
The weight of described the first metal hanger 1, the second metal hanger 10 can be regulated as required.
The utility model using method is as follows:
Whole bar 7 runs through the net of guipure 5 upper ends, two end points snap in the metal hanger 3 of the second U-shaped draw-in groove 13, the first clamps 9, the second clamp 14 inboards on the first U-shaped draw-in groove 6 on the first clamp 9 tops and the second clamp 15 tops respectively by tether 4 and guipure 5 both sides tightens about barre 7 king-rods; Corresponding being arranged symmetrically with of the first metal hanger 1 and the second metal hanger 10 both sides, then regulate the weight of the first metal hanger 1 and the second metal hanger 10, adjust the hanging position on bar 7 of the first suspension strop 2, the second suspension strop 11, so that the net centre position reaches required height.
The utility model is not limited to the aforesaid specific embodiment.The utility model expands to any new feature or any new combination that discloses in this manual, and the arbitrary new method that discloses or step or any new combination of process.
Claims (1)
1. Novel badminton net adjusting device is characterized in that comprising the first metal hanger (1), the first suspension strop (2), metal hanger (3), tether (4), guipure (5), the first U-shaped draw-in groove (6), bar (7), the first hook (8), the first clamp (9), the second metal hanger (10), the second suspension strop (11), the second hook (12), the second U-shaped draw-in groove (13), the second clamp (14); The first metal hanger (1) is connected with an end of the first suspension strop (2) by the first hook (8); The other end of the first suspension strop (2) is connected with the left bar of bar (7); The second metal hanger (10) is connected with an end of the second suspension strop (11) by the second hook (12); The other end of the second suspension strop (11) is connected with the right bar of bar (7);
Whole bar (7) runs through the net of guipure (5) upper end, and the two ends, the left and right sides of king-rod snap in respectively the first U-shaped draw-in groove (6) on the first clamp (9) top and the second U-shaped draw-in groove (13) on the second clamp (14) top; The first clamp (9), the second clamp (14) inboard are provided with three metal hangers (3), and metal hanger (3) is connected with guipure (5) left and right sides by tether (4);
The structure of described the first metal hanger (1), the first suspension strop (2), the first U-shaped draw-in groove (6), the first hook (8), the first clamp (9) is linked up with (12) with the second metal hanger (10), the second suspension strop (11), the second U-shaped draw-in groove (13), second respectively, the second clamp (14) is identical;
Described bar (7) is comprised of integrally formed, identical left bar, king-rod, the right bar of size; Its left bar, right pole length are identical;
The tie point of described the first suspension strop (2) and bar (7) can be in left bar free adjustment; The tie point of the second suspension strop (11) and bar (7) can be in right bar free adjustment;
The weight of described the first metal hanger (1), the second metal hanger (10) can be regulated as required.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220142019 CN202777675U (en) | 2012-04-06 | 2012-04-06 | Novel badminton net adjustment device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220142019 CN202777675U (en) | 2012-04-06 | 2012-04-06 | Novel badminton net adjustment device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202777675U true CN202777675U (en) | 2013-03-13 |
Family
ID=47805027
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220142019 Expired - Fee Related CN202777675U (en) | 2012-04-06 | 2012-04-06 | Novel badminton net adjustment device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202777675U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106799026A (en) * | 2017-03-09 | 2017-06-06 | 聂强军 | A kind of campus lifts combined regulation type shuttlecock training rack and operating method |
-
2012
- 2012-04-06 CN CN 201220142019 patent/CN202777675U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106799026A (en) * | 2017-03-09 | 2017-06-06 | 聂强军 | A kind of campus lifts combined regulation type shuttlecock training rack and operating method |
CN106799026B (en) * | 2017-03-09 | 2022-02-11 | 大连交通大学 | Campus lifting combined adjustable badminton training net rack and operation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101394117B1 (en) | Cable crossover training machine | |
CN204380114U (en) | Free combat arm muscle power exercising device | |
CN202516257U (en) | Net rack for sports | |
CN202777675U (en) | Novel badminton net adjustment device | |
CN206026957U (en) | Adjustable counter balance piece gravity effect combined training ware | |
CN102580296B (en) | Novel badminton net adjusting device | |
CN205672577U (en) | A kind of physical education hurdles rack | |
CN207356512U (en) | Swimming tension trainer | |
CN204734901U (en) | Automatic transfer heavy body -building device | |
CN208097197U (en) | A kind of warm-up ligament tension device of callisthenics | |
CN205460875U (en) | Magnetic control coaster protection device for gymnastic training | |
CN203447736U (en) | Volleyball hanging support for training volleyball drop shot | |
CN203954527U (en) | A kind of Rubber-band rack | |
CN202020882U (en) | Multi-head basketball stand capable of ascending and descending | |
CN105709403B (en) | A kind of gymnastic training magnetic control coaster protection device and its application | |
CN202933437U (en) | Auxiliary leg pressing machine | |
CN206950534U (en) | A kind of pupil is with double-rod device | |
CN203790540U (en) | Portable stand column used for badminton, tennis and volleyball | |
CN201227514Y (en) | Adjustable backboard | |
CN104826268A (en) | Electric suspension training device | |
CN203370226U (en) | Multifunctional pole-vault stand | |
CN203620200U (en) | Multifunctional dance training device | |
CN204034208U (en) | A kind of mobile type multifunctional net assembly | |
CN209204603U (en) | A kind of novel swimming training machine | |
CN208319891U (en) | A kind of physical education basketball rack device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130313 Termination date: 20140406 |