CN202768011U CN 201220295654 CN201220295654U CN202768011U CN 202768011 U CN202768011 U CN 202768011U CN 201220295654 CN201220295654 CN 201220295654 CN 201220295654 U CN201220295654 U CN 201220295654U CN 202768011 U CN202768011 U CN 202768011U
Authority
CN
China
Prior art keywords
water
inclined shaft
segment
lining segment
tbm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220295654
Other languages
English (en)
Inventor
雷升祥
毛东晖
邹春华
柴永模
马天昌
吕春雷
张海云
李方利
徐亮
曲波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
China Railway 13th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 13th Bureau Group Co Ltd filed Critical China Railway 13th Bureau Group Co Ltd
Priority to CN 201220295654 priority Critical patent/CN202768011U/zh
Application granted granted Critical
Publication of CN202768011U publication Critical patent/CN202768011U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

一种高埋深富水地层TBM法斜井的水压控制用衬砌管片,包括管体、注浆孔和仰拱路面。在管体上开有排水泄压孔。本实用新型当管片背后水压力达到0.3MPa时,可自动进行排水泄压,从而可有效控制TBM法斜井施工时地下水压力对衬砌管片的影响,减少衬砌管片上所受的荷载、延长管片的使用寿命、提高施工的安全性和稳定性。

Description

高埋深富水地层TBM法斜井的水压控制用衬砌管片
技术领域:
本实用新型属于一种TBM机隧道施工用设备,特别涉及一种高埋深富水地层TBM法斜井的水压控制用衬砌管片。
背景技术:
TBM机集钻、掘、护于一体,能够有效实现长大隧道施工的工厂化作业,是世界上最先进的大型综合性隧道施工设备,代表着国际隧道施工技术的最高水平,在国际上已广泛应用于交通、水电、矿山、市政、国防等工程领域中,但对于大坡度高埋深富水地层斜井采用TBM法施工,我国还未有先例。
TBM掘进机及管片结构所能承受的水土压力有限,一般在1MPa以内。高埋深富水斜井TBM法施工时,作用于TBM掘进机及管片结构上的水土压力可达数兆帕(与斜井埋深及地下水附存情况有关),将直接影响TBM掘进施工及管片结构的安全。
发明内容:
本实用新型的目的就在于克服上述现有技术中存在的不足,而提供一种高埋深富水地层TBM法斜井的水压控制用衬砌管片,该管片结构适用于大坡度高埋深富水地层斜井采用TBM法施工时的水压控制,并且结构简单。
如上构思,本实用新型的技术方案是:一种高埋深富水地层TBM法斜井的水压控制用衬砌管片,包括管体、注浆孔和仰拱路面,其特征在于:在管体上开有排水泄压孔。
上述排水泄压孔为两个,它们对称布置在隧道底拱中心线两测。
上述排水泄压孔对称布置在隧道底拱中心线两测52o角的位置。
本实用新型由于在管片结构上设置了排水泄压孔,当管片背后水压力达到0.3MPa时,可自动进行排水泄压,从而可有效控制TBM法斜井施工时地下水压力对衬砌管片的影响,减少衬砌管片上所受的荷载、延长管片的使用寿命、提高施工的安全性和稳定性。
附图说明:
图1是本实用新型的结构示意图。
图中:1、管体;2、排水泄压孔;3、仰拱路面;4、注浆孔。
具体实施方式:
如图1所示,一种高埋深富水地层TBM法斜井的水压控制用衬砌管片,在管体1上设置两个排水泄压孔2,两个排水泄压孔对称布置在隧道底拱中心线两测52o角的位置,当管片背后水压力达到0.3MPa时,自动进行排水泄压施工作业,从而可有效控制TBM法斜井施工时地下水压力对衬砌管片的影响,减少衬砌管片上所受的荷载、延长管片的使用寿命、提高施工的安全性和稳定性。

Claims (3)

1.一种高埋深富水地层TBM法斜井的水压控制用衬砌管片,包括管体、注浆孔和仰拱路面,其特征在于:在管体上开有排水泄压孔。
2.根据权利要求1所述的高埋深富水地层TBM法斜井的水压控制用衬砌管片,其特征在于:上述排水泄压孔为两个,它们对称布置在隧道底拱中心线两测。
3.根据权利要求1或2所述的高埋深富水地层TBM法斜井的水压控制用衬砌管片,其特征在于:上述排水泄压孔对称布置在隧道底拱中心线两测52o角的位置。
CN 201220295654 2012-06-21 2012-06-21 高埋深富水地层tbm法斜井的水压控制用衬砌管片 Expired - Fee Related CN202768011U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220295654 CN202768011U (zh) 2012-06-21 2012-06-21 高埋深富水地层tbm法斜井的水压控制用衬砌管片

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220295654 CN202768011U (zh) 2012-06-21 2012-06-21 高埋深富水地层tbm法斜井的水压控制用衬砌管片

Publications (1)

Publication Number Publication Date
CN202768011U true CN202768011U (zh) 2013-03-06

Family

ID=47774594

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220295654 Expired - Fee Related CN202768011U (zh) 2012-06-21 2012-06-21 高埋深富水地层tbm法斜井的水压控制用衬砌管片

Country Status (1)

Country Link
CN (1) CN202768011U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104929686A (zh) * 2015-07-01 2015-09-23 中南大学 一种控制盾构隧道上浮的排水减压方法及其管片
CN106761918A (zh) * 2016-12-30 2017-05-31 中铁二院工程集团有限责任公司 一种隧道溶洞及地下水综合治理构造及施工方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104929686A (zh) * 2015-07-01 2015-09-23 中南大学 一种控制盾构隧道上浮的排水减压方法及其管片
CN106761918A (zh) * 2016-12-30 2017-05-31 中铁二院工程集团有限责任公司 一种隧道溶洞及地下水综合治理构造及施工方法
CN106761918B (zh) * 2016-12-30 2019-07-05 中铁二院工程集团有限责任公司 一种隧道溶洞及地下水综合治理构造及施工方法

Similar Documents

Publication Publication Date Title
CN102877884B (zh) 一种基于千米定向钻探技术的矿井奥灰顶部改造及施工方法
CN203515597U (zh) 适用于软弱地层的隧道结构
CN102155232B (zh) 地形偏压条件下大跨不对称双连拱铁路隧道施工方法
CN105239598A (zh) 井式全自动立体车库的整体下沉施工方法
CN102352601A (zh) 隧道式复合锚碇
CN101270667A (zh) 深埋地下洞室极强或强或中等岩爆洞段的围岩支护方法
CN102913249B (zh) 斜井横向贯通正洞单喇叭挑高施工方法
CN108952776A (zh) 一种等距水平定向顺层钻孔注浆改造顶底板双重灰岩的方法
CN103291312B (zh) 能够实现三维注浆的盾构机
CN101446107B (zh) 富水地带水电站地下厂房洞室分层排水结构及其施工方法
CN202768011U (zh) 高埋深富水地层tbm法斜井的水压控制用衬砌管片
CN105715277A (zh) 一种盾构隧道的施工装置及施工方法
CN204646240U (zh) 一种松散体中的地下竖井支护结构
CN108868789B (zh) 一种适用于盾构法施工隧道的地层主动托换方法
CN203420262U (zh) 狭窄河谷高陡坝肩混凝土坝的中高速缆机系统
CN203080515U (zh) 一种配有注浆配件的大直径钢管基桩
CN104879136A (zh) 用于穿越溶洞的软弱破碎地层隧道支护体系及安装方法
CN203347799U (zh) 能够实现三维注浆的盾构机
CN204662246U (zh) 陡坡桥梁墩台结构
CN103966981B (zh) 风化卸荷岩体上修建拱坝的传力结构及其施工方法
CN203429609U (zh) 一种有压水工隧洞大流量地下水控排结构
CN202370539U (zh) 一种隧道的前掌子面开挖土体预加固结构
CN102493436A (zh) 矩形抗滑桩人工掘进新工法
CN104389609A (zh) 一种无爆破机械开挖法
CN204626420U (zh) 一种旗形基坑围护结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINESE RAILWAY BRIDGE ENGINEERING BUREAU GROUP CO

Free format text: FORMER NAME: CHINA RAILWAY 13TH BUREAU GROUP CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 300300, E6, building 302, airport business park, 80 ring River Road, Airport Economic Zone, Tianjin, Dongli

Patentee after: CHINA RAILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP CO., LTD.

Address before: 300300, E6, building 302, airport business park, 80 ring River Road, Airport Economic Zone, Tianjin, Dongli

Patentee before: China Railway 13th Bureau Group Co., Ltd.

C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 300300 No. 32 West Central Road, Tianjin Airport Economic Zone

Patentee after: CHINA RAILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP CO., LTD.

Address before: 300300, E6, building 302, airport business park, 80 ring River Road, Airport Economic Zone, Tianjin, Dongli

Patentee before: CHINA RAILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP CO., LTD.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130306

Termination date: 20200621

CF01 Termination of patent right due to non-payment of annual fee