CN202766976U - Main grider calibration reinforcement butting device for road bridge erection machine - Google Patents

Main grider calibration reinforcement butting device for road bridge erection machine Download PDF

Info

Publication number
CN202766976U
CN202766976U CN 201220340924 CN201220340924U CN202766976U CN 202766976 U CN202766976 U CN 202766976U CN 201220340924 CN201220340924 CN 201220340924 CN 201220340924 U CN201220340924 U CN 201220340924U CN 202766976 U CN202766976 U CN 202766976U
Authority
CN
China
Prior art keywords
female
male
calibration
pasting board
link
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220340924
Other languages
Chinese (zh)
Inventor
张强
徐阳
倪宝彦
张俊龙
王磊
李朋亮
郑晓雯
冯艳秋
张洪涛
程红威
张宪文
郁成
孟海滨
冯志国
刘峰
刘艳臻
刘龙
徐瑞华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou XCMG Railway Equipment Co Ltd
Original Assignee
Xuzhou XCMG Railway Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou XCMG Railway Equipment Co Ltd filed Critical Xuzhou XCMG Railway Equipment Co Ltd
Priority to CN 201220340924 priority Critical patent/CN202766976U/en
Application granted granted Critical
Publication of CN202766976U publication Critical patent/CN202766976U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a main grider calibration reinforcement butting device for a road bridge erection machine and belongs to the field of construction machinery calibration reinforcement butting devices. The main grider calibration reinforcement butting device for the road bridge erection machine comprises a female head connection end (A) and a male head connection end (B). The female head connection end (A) comprises U-steel (1), a female head inner adhesive flitch (2), a female outer adhesive flitch (3) and a female head outer adhesive stiffening flitch (4). The male connection end (B) comprises a pin flitch (5), a male outer adhesive flitch (6) and a male inner adhesive flitch (7). The main grider calibration reinforcement butting device for the road bridge erection machine has the advantages of quickly enabling main griders of bridge erection machine to be quickly connected with each other, effectively avoiding drop and looseness, ensuring that each connection part evenly bears force, being convenient to assemble and disassemble, simple in structure, high in intensity, fast and accurate to assemble and affordable.

Description

Docking facilities is reinforced in the girder calibration of highway bridging machine
Technical field
The utility model relates to a kind of Bridge Erector, and specifically docking facilities is reinforced in the calibration of a kind of girder of highway bridging machine, belongs to the engineering machinery calibration and reinforces the docking facilities field.
Background technology
Highway bridging machine is as one of main special equipments of bridge construction such as high-speed railway, highway, and this equipment is large, and the magnitude of value is high, and safety requirements is very high.The agent structure of present common Bridge Erector mainly is comprised of girder, front support mechanism, rear support mechanism, medial support mechanisms, auxiliary support mechanism.During bridge formation, girder is as main bearing member, and across between two bridge piers, overhead traveling crane lifts by crane prefabricated Box Girder Bridge in the girder upper surface by front support mechanism and medial support mechanisms.In the via hole operating mode, because front end stretches out longlyer, girder will bear larger moment of flexure, and the safety of girder is determining the safety in utilization of Bridge Erector.Each internode type of attachment of existing girder mainly contains Chinese character pin-shaped pin joint and is connected with bolt.In these two kinds of connected modes: Chinese character pin-shaped pin joint mode, to install rapidly, dismounting is convenient, but stressed too concentrated, has caused bore deformation and causes girder bending-down to increase; Bolt connects reasonable stress, but uses too complexity, and cost is higher.
Summary of the invention
For the problem that above-mentioned prior art exists, the utility model provides a kind of girder calibration of highway bridging machine to reinforce docking facilities, and crane ' s major girder is connected fast, makes whole crane ' s major girder stressed good, has both effectively prevented from coming off, and can install again rapidly accurately.
To achieve these goals, the technical solution adopted in the utility model is: docking facilities is reinforced in a kind of girder calibration of highway bridging machine, comprises female link and male link, and the female link is by channel-section steel, pasting board in the female, the outer pasting board of female and the outer reinforcing plate of female form; The male link is by pin plate, and pasting board forms in the outer pasting board of male and the male; Female link and male link are respectively equipped with pin shaft hole; The outer pasting board of pasting board and female is welded on respectively on the channel-section steel in the female, and the outer reinforcing plate of female is welded on the outer pasting board of female, then two channel-section steel make-up welding; Pasting board is welded on the channel-section steel in the male, pin plate and channel-section steel welding, the outer pasting board of male and channel-section steel welding, then two channel-section steel make-up welding.
Further, female link and male link are symmetrical structure, cooperate bearing pin to use.
The beneficial effects of the utility model are: the male link is inserted in the female link, join the lead plug axis hole, then bearing pin is inserted male link and female link are closely linked.Reinforce docking facilities by this calibration, can crane ' s major girder be linked together, effectively play anticreep, locking effect, guarantee that each connector is stressed evenly, easy accessibility, have simple in structure, intensity is high, install quick and precisely, economic and practical characteristics.
Description of drawings
Fig. 1 is female link structural representation;
Fig. 2 is male link structural representation;
Fig. 3 is female link sectional view;
Fig. 4 is male link sectional view.
Among the figure: A, female link, B, male link, 1, channel-section steel, 2, pasting board in the female, 3, the outer pasting board of female, 4, the outer reinforcing plate of female, 5, pin plate, 6, the outer pasting board of male, 7, pasting board in the male.
The specific embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
As shown in Figures 1 to 4, docking facilities is reinforced in the girder of the utility model highway bridging machine calibration, comprises female link A and male link B, and female link A is by channel-section steel 1, pasting board 2 in the female, and the outer reinforcing plate 4 of the outer pasting board 3 of female and female forms; Male link B is by pin plate 5, and pasting board 7 forms in the outer pasting board 6 of male and the male; Female link A and male link B are respectively equipped with pin shaft hole; The outer pasting board 3 of pasting board 2 and female is welded on respectively on the channel-section steel 1 in the female, and the outer reinforcing plate 4 of female is welded on the outer pasting board 3 of female, then two channel-section steel 1 make-up welding; Pasting board 7 is welded on the channel-section steel 1 in the male, pin plate 5 and channel-section steel 1 welding, the outer pasting board 6 of male and channel-section steel 1 welding, then two channel-section steel 1 make-up welding; Female link A and male link B are symmetrical structure, cooperate bearing pin to use.
During use: male link B inserts female link A, then fixes with bearing pin, and the beam joint is fixed together.Pasting board 2 in the female, the outer pasting board 3 of female and the outer reinforcing plate 4 of female have been strengthened female junction intensity, and junction stressed uniformly can distribute simultaneously; Pasting board 7 has been strengthened public junction intensity in the outer pasting board 6 of male and the male, and has shared the stressed of pin plate 5; Realized that each joint of girder quick and precisely links together, and junction intensity can be strengthened, distribution of force is even.

Claims (2)

1. docking facilities is reinforced in the calibration of the girder of a highway bridging machine, it is characterized in that comprise female link (A) and male link (B), female link (A) is by channel-section steel (1), pasting board (2) in the female, the outer pasting board (3) of female and the outer reinforcing plate (4) of female form; Male link (B) is by pin plate (5), and pasting board (7) forms in the outer pasting board (6) of male and the male; Female link (A) and male link (B) are respectively equipped with pin shaft hole; The outer pasting board (3) of pasting board (2) and female is welded on respectively on the channel-section steel (1) in the female, and the outer reinforcing plate (4) of female is welded on the outer pasting board (3) of female, then two channel-section steels (1) make-up welding; Pasting board (7) is welded on the channel-section steel (1) in the male, pin plate (5) and channel-section steel (1) welding, the outer pasting board (6) of male and channel-section steel (1) welding, then two channel-section steels (1) make-up welding.
2. docking facilities is reinforced in the calibration of the girder of a kind of highway bridging machine according to claim 1, it is characterized in that described female link (A) and male link (B) are symmetrical structure, cooperates bearing pin to use.
CN 201220340924 2012-07-13 2012-07-13 Main grider calibration reinforcement butting device for road bridge erection machine Expired - Lifetime CN202766976U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220340924 CN202766976U (en) 2012-07-13 2012-07-13 Main grider calibration reinforcement butting device for road bridge erection machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220340924 CN202766976U (en) 2012-07-13 2012-07-13 Main grider calibration reinforcement butting device for road bridge erection machine

Publications (1)

Publication Number Publication Date
CN202766976U true CN202766976U (en) 2013-03-06

Family

ID=47773559

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220340924 Expired - Lifetime CN202766976U (en) 2012-07-13 2012-07-13 Main grider calibration reinforcement butting device for road bridge erection machine

Country Status (1)

Country Link
CN (1) CN202766976U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059630A (en) * 2017-03-30 2017-08-18 秦皇岛天业通联重工科技有限公司 The one-piece type quick division joint of crane's major girder

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059630A (en) * 2017-03-30 2017-08-18 秦皇岛天业通联重工科技有限公司 The one-piece type quick division joint of crane's major girder

Similar Documents

Publication Publication Date Title
CN101550676B (en) High-speed railway orthotropic slab integral steel deck construction
AU2011359051B2 (en) Coupler yoke and coupler draft gear
CN107628050B (en) Bolster formula bogie articulated car sleeper beam structure
CN102267670A (en) Connecting frame, boom system with connecting frame, and lifting appliance
CN102530008B (en) Rail vehicle traction beam
CN204750295U (en) Prevent spouting and repair special transport vechicle subframe of well equipment
CN103015309A (en) Integral joint steel structure door type pier
CN102220786A (en) Hinge connection structure and method for supporting steel columns on steel beams
CN202766976U (en) Main grider calibration reinforcement butting device for road bridge erection machine
CN103466472A (en) Auxiliary arm system and crawler crane
CN205634682U (en) Many function combination formula hoist
CN203834340U (en) Open type bond beam truss bridge
CN209163043U (en) A kind of side's Concrete-filled Double Skin Steel Tube Columns and steel beam connecting joint
CN201613907U (en) Integrated structure of independent sleeper beam and coupler box
CN201634994U (en) Bolting-welding combined member
CN216338968U (en) Railway double-track box girder static load bending test beam
CN202138412U (en) Steering knuckle of disc brake
CN206255013U (en) A kind of railway locomotive frame
CN104310241A (en) Standard knot of tower crane
CN202743262U (en) Striking block
CN203485931U (en) Coupler
CN207919312U (en) Lateral bracing and the coefficient steel girder bridge structure of main truss can be reduced
CN203639010U (en) Section steel butt-joint structure, A frame structure of tower type crane and tower type crane
CN209798543U (en) Railway single-track box girder bridge girder erection machine supporting device
CN203461730U (en) Positioning device and pulling plate positioning structure applicable to crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130306

CX01 Expiry of patent term