CN202762302U - Spray device arranged in desulfurizing tower - Google Patents

Spray device arranged in desulfurizing tower Download PDF

Info

Publication number
CN202762302U
CN202762302U CN2012204280826U CN201220428082U CN202762302U CN 202762302 U CN202762302 U CN 202762302U CN 2012204280826 U CN2012204280826 U CN 2012204280826U CN 201220428082 U CN201220428082 U CN 201220428082U CN 202762302 U CN202762302 U CN 202762302U
Authority
CN
China
Prior art keywords
nozzle
spray
pipe
branch pipe
plugging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012204280826U
Other languages
Chinese (zh)
Inventor
朱杰高
薛俊强
徐海文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG PACIFIC ENVIRONMENTAL PROTECTION CO Ltd
Original Assignee
SHANDONG PACIFIC ENVIRONMENTAL PROTECTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG PACIFIC ENVIRONMENTAL PROTECTION CO Ltd filed Critical SHANDONG PACIFIC ENVIRONMENTAL PROTECTION CO Ltd
Priority to CN2012204280826U priority Critical patent/CN202762302U/en
Application granted granted Critical
Publication of CN202762302U publication Critical patent/CN202762302U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to a spray device arranged in a desulfurizing tower. The spray device comprises a spray branch pipe and a nozzle, wherein the spray branch pipe is connected with a nozzle short joint, and the nozzle short joint is connected with the nozzle through two 45-degree bends in reverse dislocation butt joint. The spray device is improved aiming at the problems of scaling and plugging of the spray pipe and the nozzle, improves the connection mode of the spray branch pipe and the nozzle, and is provided with the hollow cone nozzle not apt to be plugged at the tail end. In desulfurizing system operation, when a certain spray layer is needed to be stopped due to low load, slurry in the pipe flows to the outside of the nozzle along the pipe lowering slope of the spray pipe, plugging of the nozzle and the spray branch pipe caused by the fact that slurry remains in a horizontal pipe can be avoided, and the problems of scaling and plugging from the spray branch pipe to a nozzle outlet are solved. Use ratio of a desulfurizing system is improved, accordingly environment benefit is improved, and a large amount of maintenance and environment protection expanse is saved for enterprises.

Description

Spray equipment in a kind of desulfurizing tower
Technical field
The utility model relates to spray equipment in a kind of desulfurizing tower, be applicable to the system with desulfurizing agents such as lime, calcium carbonate, or derivatives thereofs (battery slag, white clay, yellow mud etc.), belong to boiler smoke Wet Flue Gas Desulfurization Technique environmental technology field.
Background technology
Along with the develop rapidly of China's economic, problem of environmental pollution is on the rise.The Energy Mix of China is take coal as main, and its consumption increases day by day, SO 2Discharge capacity also constantly increase, China is atmospheric environment SO in the world 2One of a few countries of severe contamination.Therefore ecological environment suffers that serious destruction also causes very large economic loss.Coal accounts for about 71% in the primary energy of China, and from now within considerable time the consumption of primary energy still take coal as main.Coal in all parts of the country all contains chemical composition " sulphur " to some extent, yet the coal of the overwhelming majority just directly enters Industrial Stoves, Industrial Boiler internal combustion, the SO that burning produces without processing 2Directly be discharged into again in the atmosphere etc. harmful substance, China is discharged into the SO of atmosphere every year 2Have 1800 ~ 2,000 ten thousand tons, wherein 80% from combustion process, so cut down SO 2Discharge capacity, prevent atmosphere SO 2Pollute, become China and reached now one of following main social problems in quite over a long time.
Sulfur method mainly contains at present: 1, physical desulfurization method 2, chemical desulfurization method 3, biological desulphurization method;
Desulfur technology mainly contains: desulfurization after desulfurization 3 in 1, desulfurization 2 before the burning, the burning, the burning.
Operation technique is the most extensive at present, and the rear desulfur technology of still burning that effect is best, typical technology has limestone/gypsum method, alkaline process, two alkaline process, ammonia process, seawater wet method, spray drying process, electronic beam method, ammonia process etc., wherein the most widely used be comparatively stablize, the lime-gypsum method desulfur technology of technology comparative maturity.
In wet method lime-gypsum method and derivative thereof (battery slag, white clay, the yellow mud etc.) desulfur technology, the most scabrous is exactly internal system pipeline scale blockage problem, at present comparatively reliably technology is being arranged aspect the circulation liquid pool fouling precipitation.But also there be not comparatively basic breakthrough aspect solution spray piping and the spray nozzle encrustation obstruction.
The installation form of spraying layer nozzle mainly contains following several (seeing Fig. 1-3) at present; its main deficiency is in the time of need to stopping certain layer of spraying layer when system loading is low; the slurries of pipe interior are deposited in spray supervisor, arm and the nozzle arm; can cause for a long time the obstruction of spray piping nozzle arm and nozzle; affect its desulfuration efficiency and environmental protection; reduce the utilization rate of system, increased maintenance cost and the environmental protection fund expenditure of equipment.
Summary of the invention
The purpose of this utility model is to overcome the prior art deficiency, and spray equipment in a kind of desulfurizing tower is provided, and has solved the fouling blockage problem from the spray arm to jet expansion.
The technical scheme that the utility model is taked is:
Spray equipment in a kind of desulfurizing tower comprises spray arm, nozzle, and the spray arm links to each other with a nozzle short circuit, and the nozzle short circuit links to each other with nozzle by 45 ° of elbows of two reverse dislocation docking.
The utility model improves for spray piping and spray nozzle encrustation blockage problem, by the type of attachment between improvement spray and the nozzle, and uses endways not susceptible to plugging hollow cone nozzle.In service in desulphurization system, in the time of need to stopping certain one deck spraying layer as hanging down because of load, the slurries of pipe interior can prop up the pipeline descending grade along nozzle and flow to beyond the nozzle, can not cause nozzle and nozzle to prop up blockage in the horizontal pipe because resting on, solve the fouling blockage problem from the spray arm to jet expansion.Make desulphurization system increase utilization rate, thereby improve environmental benefit, for enterprise has saved very most maintenance and environmental protection disbursement.
Description of drawings
Fig. 1 is existing spray equipment A structure chart;
Fig. 2 is existing spray equipment B structure chart;
Fig. 3 is existing spray equipment C-structure figure;
Fig. 4 is the utility model structure chart;
Wherein, 1 is the spray arm, and 2 is nozzle, and 3 is the nozzle short circuit, and 4 is 45 ° of elbows.
The specific embodiment
Further specify below in conjunction with the specific embodiment.
Spray equipment in a kind of desulfurizing tower comprises spray arm 1, nozzle 2, and spray arm 1 links to each other with a nozzle short circuit 3, and nozzle short circuit 3 links to each other with nozzle 2 by 45 ° of elbows 4 of two reverse dislocation docking.
Spray arm 1 links to each other with a nozzle short circuit 3, then be connected to two 45 ° of elbows 4, be connected with nozzle 2 again, the gradient of a decline of 2 formation from spray arm 1 to nozzle, the slurries of pipe interior are flowed out along inner-walls of duct, thereby effectively solved the problem that nozzle and nozzle prop up blockage in the wet desulphurization.

Claims (1)

1. the interior spray equipment of desulfurizing tower comprises spray arm, nozzle, it is characterized in that the spray arm links to each other with a nozzle short circuit, and the nozzle short circuit links to each other with nozzle by 45 ° of elbows of two docking that oppositely misplace.
CN2012204280826U 2012-08-27 2012-08-27 Spray device arranged in desulfurizing tower Expired - Lifetime CN202762302U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012204280826U CN202762302U (en) 2012-08-27 2012-08-27 Spray device arranged in desulfurizing tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012204280826U CN202762302U (en) 2012-08-27 2012-08-27 Spray device arranged in desulfurizing tower

Publications (1)

Publication Number Publication Date
CN202762302U true CN202762302U (en) 2013-03-06

Family

ID=47768906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012204280826U Expired - Lifetime CN202762302U (en) 2012-08-27 2012-08-27 Spray device arranged in desulfurizing tower

Country Status (1)

Country Link
CN (1) CN202762302U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105879646A (en) * 2015-07-27 2016-08-24 大唐环境产业集团股份有限公司 Connecting structure of slurry spray pipelines and nozzles of desulfurizing absorption tower

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105879646A (en) * 2015-07-27 2016-08-24 大唐环境产业集团股份有限公司 Connecting structure of slurry spray pipelines and nozzles of desulfurizing absorption tower

Similar Documents

Publication Publication Date Title
CN104888599B (en) Spray drying desulfurizer used for cement plant and process method
CN104324593A (en) Ship waste gas double-loop washing and desulfurization device combining seawater and fresh water
CN204746080U (en) A spray drying desulphurization unit for cement plant
CN202762302U (en) Spray device arranged in desulfurizing tower
CN204170609U (en) A kind of marine exhaust double loop washing desulphurization device of seawater and freshwater associating
CN101874941A (en) Deoiling device and method for gypsum slurry
CN101298022A (en) High-pressure fine water mist desulfurized dust collector with front-located dry precipitator and using method thereof
CN206138996U (en) Novel cement kiln semi -dry desulfurization system
CN104722205A (en) Limestone-gypsum wet flue gas desulfurization synergist
CN207445927U (en) A kind of Wet FGD
CN202478813U (en) Wet flue gas desulphurization system used for coal-fired power plant boiler
CN205095635U (en) Can realize sea water desulphurization unit of ultra -clean emission
CN204412058U (en) A kind of coupling synergy mass transfer apparatus of wet desulfurization system
CN104069724A (en) Sintering-flue-gas seawater desulfurization system and desulphurization method
CN204073833U (en) The desulphurization system of the tower external oxidation method of limestone-gypsum method wet type desulfurizing
CN207102319U (en) SDA alkali adding method deep desulfuration dedustings and wastewater zero discharge flue gas processing device
CN203458971U (en) Novel desulfurization tower
CN103055690B (en) Sulfur-removing additives and preparation method thereof
CN203777930U (en) Novel system for improving desulfurization spray gun type oxidation air utilization rate
CN203170216U (en) Desulfidation system
CN202778247U (en) Novel flue gas desulfurization device
CN205287978U (en) Brick and tile kiln dust removal desulfurizing tower
CN204952654U (en) Connection structure of desulfurization absorption tower thick liquid spray piping and nozzle
CN205095639U (en) Adopt gas -liquid absorbing device of two thick liquid ponds dual cycle
CN205164391U (en) Industrial waste gas treating device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 250101 5 building, environmental science and Technology Park, No. 554, Zheng Feng Road, Ji'nan high tech Zone, Shandong

Patentee after: SHANDONG PACIFIC ENVIRONMENTAL PROTECTION CO.,LTD.

Address before: 250101 5 building, environmental science and Technology Park, No. 554, Zheng Feng Road, Ji'nan high tech Zone, Shandong

Patentee before: Shandong Pacific Environmental Protection Co.,Ltd.

CP01 Change in the name or title of a patent holder
CX01 Expiry of patent term

Granted publication date: 20130306

CX01 Expiry of patent term