CN202751948U - Interval-variable inlet flow guiding device of semidry-process flue gas desulfurizing tower - Google Patents

Interval-variable inlet flow guiding device of semidry-process flue gas desulfurizing tower Download PDF

Info

Publication number
CN202751948U
CN202751948U CN 201220373781 CN201220373781U CN202751948U CN 202751948 U CN202751948 U CN 202751948U CN 201220373781 CN201220373781 CN 201220373781 CN 201220373781 U CN201220373781 U CN 201220373781U CN 202751948 U CN202751948 U CN 202751948U
Authority
CN
China
Prior art keywords
guide vane
flue gas
guiding device
process flue
semi
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220373781
Other languages
Chinese (zh)
Inventor
蒋善行
胡宏兴
任永珍
周首男
徐甸
缪昕芳
虞莹
胡志健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiang Shanxing
Zhejiang Beigaofeng Environmental Engineering Co ltd
Original Assignee
HANGZHOU BEIGAOFENG ELECTRIC POWER ENGINEERING DESIGN Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU BEIGAOFENG ELECTRIC POWER ENGINEERING DESIGN Co Ltd filed Critical HANGZHOU BEIGAOFENG ELECTRIC POWER ENGINEERING DESIGN Co Ltd
Priority to CN 201220373781 priority Critical patent/CN202751948U/en
Application granted granted Critical
Publication of CN202751948U publication Critical patent/CN202751948U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Treating Waste Gases (AREA)

Abstract

The utility model belongs to the technical field of flue gas desulfurizing tower and particularly relates to an interval-variable inlet flow guiding device of a semidry-process flue gas desulfurizing tower. The interval-variable inlet flow guiding comprises a guide vane fixing frame and a guide vane unit fixed on the guide vane fixing frame. The guide vane unit comprises a plurality of arc-shaped guide vanes which are sequentially arranged in variable intervals according to the arc length from short to long. The interval-variable inlet flow guiding device of the semidry-process flue gas desulfurizing tower is disposed below a flue gas inlet bend, close to a venturi tube, at the bottom of the desulfurizing tower, and is a device with a square section. By arranging the more portable and simpler guide vanes in the guide vane fixing frame, airflow in the desulfurizing tower is controlled to uniformly distribute. The interval-variable flow guiding device is arranged at the upper end of the flue gas inlet bend, airflow distribution in the tower is improved and the problem of treatment difficulty due to the fact that dust falls at the bottom of the tower is avoided.

Description

A kind of semi-dry process flue gas desulphurization tower entrance becomes the spacing guiding device
Technical field
The utility model belongs to the flue gas desulfurization technique field, particularly a kind of semi-dry desulphurization tower inlet flue gas uniform distribution device.
Background technology
Desulfurizing tower is main equipment in the semi-dry method flue gas desulfurization technique, and flue gas evenly distributes in tower and flows is the key factor that improves desulfuration efficiency and reduce resistance.The method that air-flow distributes in control and the adjusting tower has several: be improved and import and export the design of flue direction; Have by in multiple venturi tube, selecting different venturi calibers, air-flow in the desulfurizing tower is distributed adjust; Have at the inlet flue duct place airflow uniform distribution device is set.But what have exists complex structure, and what have is difficult to process the deficiency of adjustment and installation difficulty etc. to falling ash in the tower.Application number provides a kind of circulating fluidized bed desulfurization tower that is provided with deflector for 200520075273.9 Chinese utility model patent, and this circulating fluidized bed desulfurization tower is comprised of smoke inlet pipe, deflector, venturi tube bank, recirculating fluidized bed bed body, desulfurizing agent and feed back entrance, atomized water spout, exhanst gas outlet; The middle part of desulfurizing tower is recirculating fluidized bed bed body, be respectively equipped with desulfurizing agent and feed back entrance, atomized water spout at the downside of recirculating fluidized bed bed body, the bottom of recirculating fluidized bed bed body is connected with the venturi tube bank, the end opening of venturi tube bank is connected with smoke inlet pipe, the deflector of regulating air-flow is arranged in smoke inlet pipe, and exhanst gas outlet is located at the top of desulfurizing tower.But this device still exists and falls in the tower that ash is difficult to process, baroque defective.
The utility model content
The utility model aims to provide a kind of semi-dry process flue gas desulphurization tower entrance and becomes the spacing guiding device, can effectively and easily control the even distribution problem of air-flow, makes the desulfurizing tower operation maintenance more convenient.
For achieving the above object, the technical solution adopted in the utility model is:
A kind of semi-dry process flue gas desulphurization tower entrance becomes the spacing guiding device, comprise guide vane fixed mount and the guide vane group that is fixed on the guide vane fixed mount, described guide vane group is comprised of the guide vane of some circular shapes, for becoming pitch arrangement, the arc length of each guide vane is arranged from being short to Changshun order between each guide vane.The semi-dry process flue gas desulphurization tower entrance that the utility model provides becomes the spacing guiding device, is arranged in below the close Venturi tube of desulfurizing tower bottom smoke inlet bend, and be a square cross-section device.
As preferably, the cross section of described guide vane fixed mount is square.When using, square guide vane fixed mount can make the part of flue.
As preferably, be connected in series by gripper shoe between each guide vane, gripper shoe is rectangular steel plates, and its two ends are fixed on the both sides of guide vane fixed mount, and the both sides of guide vane are fixed on the in addition both sides of guide vane fixed mount.
As preferably, the circular back of each guide vane is welded with several circular arc gussets.The circular arc gusset is used for preventing blade vibration.The circular arc gusset is best perpendicular to guide vane.
As preferably, described circular arc gusset is two, and gripper shoe is arranged between two circular arc gussets, and parallel with the circular arc gusset.This structure avoids stopping that flue gas enters, and has guaranteed again the stability of total.
As preferably, the radian of described guide vane is 45 °.
Air-flow evenly distributes the utility model in the desulfurizing tower by controlling at the more light succinct guide vane of the inner setting of guide vane fixed mount, from chimney intake bend upper end change spacing guiding device of the present utility model is set, both improved air-flow distribution in the tower, and avoided again falling the difficult treatment problem that ash brings at the bottom of the tower.
Description of drawings
Fig. 1 is a kind of structural representation of the present utility model;
Fig. 2 is the structural representation of guide vane group;
Fig. 3 is the plan structure schematic diagram of guide vane group;
Fig. 4 is the left TV structure schematic diagram of guide vane group.
Label declaration: 1 guide vane fixed mount, 2 guide vanes, 3 circular arc gussets, 4 gripper shoes, 5 flues.
The specific embodiment
As depicted in figs. 1 and 2, semi-dry process flue gas desulphurization tower entrance of the present utility model becomes the spacing guiding device, comprises guide vane fixed mount 1 and guide vane group.The guide vane group is comprised of the guide vane 2 of 3 circular shapes, and for becoming pitch arrangement, each guide vane arc length is arranged from being short to Changshun order between the guide vane 2.In the present embodiment, the radian of each guide vane is 45 °.Guide vane 2 its circular backs of described circular arc are welded with 2 circular arc gussets, and circular arc gusset and guide vane are perpendicular, see Fig. 3 and Fig. 4, and C is the distance of 2 circular arc gussets among the figure.The cross section of guide vane fixed mount is square, and its size and dimension is complementary with the flue that needs to be connected.Among Fig. 1, two straight line portioies are flue 5, and guide vane fixed mount 1 connects two flues 5, realizes the turning of flue.Each guide vane length is L, i.e. the length of side of guide vane fixed mount 1 square cross-section, guide vane and 1 welding of guide vane fixed mount.
Guide vane fixed mount 1 shape such as bend pipe, its section are square, formed by Plate Welding, during use as the part of flue.By gripper shoe 4 serial connections, gripper shoe is a rectangular steel plates between each guide vane, and its two ends are fixed on the both sides of guide vane fixed mount 1, and the both sides of guide vane 2 are fixed on the in addition both sides of guide vane fixed mount.Guide vane and guide vane fixed mount 1 fixedly be to be realized by two side Plate Weldings of gripper shoe 4 two ends of crossing guide vane and guide vane fixed mount 1 square rack, each guide vane width is fixed with the in addition two side Plate Weldings of guide vane fixed mount 1 square rack simultaneously.Gripper shoe 4 is arranged between two circular arc gussets 3, and parallel with circular arc gusset 4.
Generally, the quantity of guide vane according to tower at the bottom of the size of gas approach decide; Each guide vane spacing is guaranteed by the gripper shoe 4 of crossing guide vane.A kind of semi-dry process flue gas desulphurization tower entrance of the present utility model becomes the spacing guiding device, can be convenient, effectively inlet flue gas is evenly distributed, be conducive to the stable of fluidized-bed layer in the tower, and the while does not affect ash discharge at the bottom of the tower.Should be pointed out that the utility model not only is confined to above-described embodiment, every adaptability revision that the structure of the utility model semi-dry process flue gas desulphurization tower entrance change spacing guiding device is carried out all should be thought to fall into protection domain of the present utility model.

Claims (8)

1. a semi-dry process flue gas desulphurization tower entrance becomes the spacing guiding device, it is characterized in that: comprise guide vane fixed mount and the guide vane group that is fixed on the guide vane fixed mount, described guide vane group is comprised of the guide vane of some circular shapes, for becoming pitch arrangement, the arc length of each guide vane is arranged from being short to Changshun order between each guide vane.
2. a kind of semi-dry process flue gas desulphurization tower entrance as claimed in claim 1 becomes the spacing guiding device, and it is characterized in that: the cross section of described guide vane fixed mount is square.
3. a kind of semi-dry process flue gas desulphurization tower entrance as claimed in claim 2 becomes the spacing guiding device, it is characterized in that: be connected in series by gripper shoe between each guide vane, gripper shoe is rectangular steel plates, its two ends are fixed on the both sides of guide vane fixed mount, and the both sides of guide vane are fixed on the in addition both sides of guide vane fixed mount.
4. become the spacing guiding device such as claim 1 or 2 or 3 described a kind of semi-dry process flue gas desulphurization tower entrances, it is characterized in that: the circular back of each guide vane is welded with several circular arc gussets.
5. a kind of semi-dry process flue gas desulphurization tower entrance as claimed in claim 4 becomes the spacing guiding device, and it is characterized in that: described circular arc gusset is two, and gripper shoe is arranged between two circular arc gussets, and parallel with the circular arc gusset.
6. become the spacing guiding device such as claim 1 or 2 or 3 described a kind of semi-dry process flue gas desulphurization tower entrances, it is characterized in that: the radian of described guide vane is 45 °.
7. a kind of semi-dry process flue gas desulphurization tower entrance as claimed in claim 4 becomes the spacing guiding device, and it is characterized in that: the radian of described guide vane is 45 °.
8. a kind of semi-dry process flue gas desulphurization tower entrance as claimed in claim 5 becomes the spacing guiding device, and it is characterized in that: the radian of described guide vane is 45 °.
CN 201220373781 2012-07-31 2012-07-31 Interval-variable inlet flow guiding device of semidry-process flue gas desulfurizing tower Expired - Fee Related CN202751948U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220373781 CN202751948U (en) 2012-07-31 2012-07-31 Interval-variable inlet flow guiding device of semidry-process flue gas desulfurizing tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220373781 CN202751948U (en) 2012-07-31 2012-07-31 Interval-variable inlet flow guiding device of semidry-process flue gas desulfurizing tower

Publications (1)

Publication Number Publication Date
CN202751948U true CN202751948U (en) 2013-02-27

Family

ID=47731145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220373781 Expired - Fee Related CN202751948U (en) 2012-07-31 2012-07-31 Interval-variable inlet flow guiding device of semidry-process flue gas desulfurizing tower

Country Status (1)

Country Link
CN (1) CN202751948U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103961993A (en) * 2014-05-15 2014-08-06 中冶赛迪工程技术股份有限公司 Gas flow equalizing device of spraying tower

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103961993A (en) * 2014-05-15 2014-08-06 中冶赛迪工程技术股份有限公司 Gas flow equalizing device of spraying tower

Similar Documents

Publication Publication Date Title
CN202844884U (en) Ammonia spraying and eddy-mixing device of flue gas denitrification system
CN204233970U (en) The board-like airflow uniform distribution device of a kind of flue gas desulfurization demister
CN207628210U (en) A kind of dry desulfurization denitration reaction tower gas approach structure and flue gas flow guiding device
CN108543401A (en) The double scale dynamic homogenization systems in flow field
CN102698579A (en) Ammonia injection and eddy current mixing device and method of flue gas denitrification system
CN202751948U (en) Interval-variable inlet flow guiding device of semidry-process flue gas desulfurizing tower
CN101732980A (en) Diversion device and fume circulating fluidized bed desulfurization system with same
CN205700123U (en) A kind of circulating fluid bed flue gas desulfurization tower of deferrable load
CN208320395U (en) A kind of flow field homogenizing regulating system
CN207237697U (en) Without fluid bed dry desulfurizing tower
CN206682974U (en) A kind of adjustable type differential pulverized coal distributor
CN202506311U (en) Improved structure for tubular air distributor of desulfurizing tower
CN202844875U (en) Vertical streamline type guide plate for circulating fluidized bed desulfurizing tower
CN209173732U (en) For meeting the circulating fluidized bed device of ultra-clean emission request
CN204543923U (en) Sliding bed activated coke/charcoal desulphurization denitration integrated tower and system for desulfuration and denitration
CN113522012B (en) Flue gas denitration ammonia spraying mixing system, static mixer thereof and ammonia spraying control method
CN204816193U (en) Flue gas guiding device on desulfurization absorption tower
CN209317378U (en) A kind of deflector divides equally the Effuser device and its removal of mercury air flue equipment of particle
CN106622660A (en) Side outlet type wet electrostatic precipitator
CN102961961B (en) Desulfurizer and sulfur method
CN2834677Y (en) Circulating fluidized bed desulfurization tower having flow guide plate
CN204233889U (en) A kind of flue gas desulfurization demister tube-sheet type airflow uniform distribution device
CN209378791U (en) The gas-particle two-phase current equalizer of selective catalytic reduction denitration device
CN205208617U (en) Flue gas system combined layout structure behind six exports of dust remover and biserial draught fan
CN104791821A (en) Combined arrangement structure of four outlets of dust remover and rear smoke and air systems of two rows of induced draft fans for power plant

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 1506 Xihu District, Zhejiang, Wensanlu Road, No. 310000, room 508,

Patentee after: ZHEJIANG BEIGAOFENG ENVIRONMENTAL ENGINEERING CO.,LTD.

Patentee after: Jiang Shanxing

Address before: Hangzhou City, Zhejiang province 310000 No. 508 Wensanlu Road Tianyuan Building 15F

Patentee before: HANGZHOU BEIGAOFENG ELECTRIC POWER ENGINEERING DESIGN Co.,Ltd.

Patentee before: Jiang Shanxing

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170330

Address after: 1506 Xihu District, Zhejiang, Wensanlu Road, No. 310000, room 508,

Patentee after: ZHEJIANG BEIGAOFENG ENVIRONMENTAL ENGINEERING CO.,LTD.

Address before: 1506 Xihu District, Zhejiang, Wensanlu Road, No. 310000, room 508,

Patentee before: ZHEJIANG BEIGAOFENG ENVIRONMENTAL ENGINEERING CO.,LTD.

Patentee before: Jiang Shanxing

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130227

Termination date: 20170731