CN202736331U - Training device for building intelligent equipment monitoring system - Google Patents

Training device for building intelligent equipment monitoring system Download PDF

Info

Publication number
CN202736331U
CN202736331U CN 201220320747 CN201220320747U CN202736331U CN 202736331 U CN202736331 U CN 202736331U CN 201220320747 CN201220320747 CN 201220320747 CN 201220320747 U CN201220320747 U CN 201220320747U CN 202736331 U CN202736331 U CN 202736331U
Authority
CN
China
Prior art keywords
training
mesh plate
module
sensor
panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220320747
Other languages
Chinese (zh)
Inventor
彭国华
宋友山
张继涛
侯金旺
张东辉
袁书光
汪小龙
谢陈磊
杨亚龙
周原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Penguin Education Technology Co ltd
Original Assignee
SHENZHEN SONTAHITEC INDUSTRY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN SONTAHITEC INDUSTRY DEVELOPMENT Co Ltd filed Critical SHENZHEN SONTAHITEC INDUSTRY DEVELOPMENT Co Ltd
Priority to CN 201220320747 priority Critical patent/CN202736331U/en
Application granted granted Critical
Publication of CN202736331U publication Critical patent/CN202736331U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model relates to a training device for a building intelligent equipment monitoring system. The training device comprises a training platform, wherein the training platform is detachably connected with general field control training panels, expandable module panels, a direct digital control (DDC), sensor and executor mesh plate training modules, system simulation training modules, a signal acquisition module and a computer panel; the sensor and executor mesh plate training modules comprise mesh plates; the mesh plates are connected with the training platform; and meshes are formed in the mesh plates. The training device has the beneficial effects that the general field control training panels, the expandable module panels, the DDC, the sensor and executor mesh plate training modules, the system simulation training modules, the signal acquisition module and the computer panel are connected with the training platform in a detachable manner; the structure is simplified; the cost is reduced; and comprehensive training can be realized.

Description

Intelligent building equipment monitoring system actual training device
Technical field
The utility model relates to actual training device, relates in particular to a kind of intelligent building equipment monitoring system actual training device.
Background technology
The building automatic technology mainly comprises the supervision to the monitoring of central air conditioner system, illuminator, supply and drain water system and elevator device, distribution system.Be familiar with to grasp the composition of these systems, the programming that wiring, steering logic be installed is the indispensable important content of study building automatic control.But usually because these device structures are complicated, expensive and bulky.Adopt material object that these equipment are carried out engineering operation, programming training such as the student, limit because of site condition on the one hand and be difficult to realize, the equipment investment cost is too high in addition, also tends to cause owing to student's error the damage of equipment in the training process, greatly increases the real training cost.Carry out single programming training if adopt the system emulation module, can only allow the part programming method of a system of students, the good manipulative ability of training of students and grasp that whole system forms and the ability of programming in logic, institute thinks the comprehensive of solution students knowledge.
Summary of the invention
In order to solve the problems of the prior art, the utility model provides a kind of intelligent building equipment monitoring system actual training device.
The utility model provides a kind of intelligent building equipment monitoring system actual training device, comprise practical traning platform, but the detachable installing type of described practical traning platform is connected with general in-situ control real training panel, expansion module panel, DDC controller panel, sensor and actuator mesh plate training module, system emulation training module, signal acquisition module and register face, described sensor and actuator mesh plate training module comprise mesh plate, described mesh plate is connected with described practical traning platform, and described mesh plate is provided with mesh.
As further improvement of the utility model, described general in-situ is controlled real training panel, expansion module panel, DDC controller panel, sensor and actuator mesh plate training module, system emulation training module, signal acquisition module is connected with register face with described practical traning platform is that buckle-type is connected.
As further improvement of the utility model, described practical traning platform is provided with draw-in groove, and described general in-situ control real training panel, expansion module panel, DDC controller panel, sensor and actuator mesh plate training module, system emulation training module, signal acquisition module and register face are equipped with fixture block.
As further improvement of the utility model, described sensor and actuator mesh plate training module comprise sensor, and described sensor is connected by mesh with described mesh plate.
As further improvement of the utility model, described sensor and actuator mesh plate training module comprise actuator, and described actuator is connected by mesh with described mesh plate.
As further improvement of the utility model, described system emulation training module comprises central air conditioner system, illuminator, supply and drain water system, elevator device and distribution system.
The beneficial effects of the utility model are: pass through such scheme, but can control real training panel, expansion module panel, DDC controller panel, sensor and actuator mesh plate training module, system emulation training module, signal acquisition module and register face and practical traning platform by general in-situ carries out detachable installing type and is connected, simplified structure, reduce cost, can carry out comprehensive real training again.
Description of drawings
Fig. 1 is the structural representation of a kind of intelligent building equipment monitoring system of the utility model actual training device;
Fig. 2 is the structural representation of the system emulation training module of a kind of intelligent building equipment monitoring system of the utility model actual training device;
Fig. 3 is the structural representation of the practical traning platform of a kind of intelligent building equipment monitoring system of the utility model actual training device.
Embodiment
Below in conjunction with description of drawings and embodiment the utility model is further specified.
Drawing reference numeral among Fig. 1 to Fig. 3 is: practical traning platform 100; General in-situ control real training panel 1; Expansion module panel 2; DDC controller panel 3; Sensor and actuator mesh plate training module 4; System emulation training module 5; Register face 6.
As shown in Figure 1 to Figure 3, a kind of intelligent building equipment monitoring system actual training device, comprise practical traning platform 100, but described practical traning platform 100 detachable installing types are connected with general in-situ control real training panel 1, expansion module panel 2, DDC controller panel 3, sensor and actuator mesh plate training module 4, system emulation training module 5, signal acquisition module and register face 6, described sensor and actuator mesh plate training module 4 comprise mesh plate, described mesh plate is connected with described practical traning platform 100, and described mesh plate is provided with mesh.
As shown in Figure 1 to Figure 3, described general in-situ control real training panel 1, expansion module panel 2, DDC controller panel 3, sensor and actuator mesh plate training module 4, system emulation training module 5, signal acquisition module are connected with register face and are connected for buckle-type with described practical traning platform 100 respectively.
As shown in Figure 1 to Figure 3, described practical traning platform 100 is provided with draw-in groove, and described general in-situ control real training panel 1, expansion module panel 2, DDC controller panel 3, sensor and actuator mesh plate training module 4, system emulation training module 5, signal acquisition module and register face 6 are equipped with fixture block.
As shown in Figure 1 to Figure 3, described sensor and actuator mesh plate training module 4 comprise sensor, and described sensor is connected by mesh with described mesh plate.
As shown in Figure 1 to Figure 3, described sensor and actuator mesh plate training module 4 comprise actuator, and described actuator is connected by mesh with described mesh plate.
As shown in Figure 1 to Figure 3, described system emulation training module 5 comprises central air conditioner system, illuminator, supply and drain water system, elevator device and distribution system.
A kind of intelligent building equipment monitoring system actual training device that the utility model provides has following characteristics:
(1) adopting detachably can mounted mounting structure, general in-situ control real training panel 1, expansion module panel 2, DDC controller panel 3, sensor and actuator mesh plate training module 4, system emulation training module 5, signal acquisition module and register face 6 can be shifted one's position arbitrarily, installation, easy to maintenance quick;
(2) be the serviceable life of extension device, the connection terminal of general in-situ control real training panel 1, expansion module panel 2, DDC controller panel 3, sensor and actuator mesh plate training module 4, system emulation training module 5, signal acquisition module and register face 6 has all caused on the module faceplate;
(3) adopt general in-situ control training module 1, effectively manipulative ability and the circuit design ability of exercise student ';
(4) adopt sensor and actuator mesh plate training module 4, effectively the ability of exercise student ' project installation equipment;
(5) adopt the emulation module of central air conditioner system, illuminator, supply and drain water system, elevator device, distribution system, allow the detection method of students system point position;
(6) provide the simulation software of central air conditioner system, illuminator, supply and drain water system, elevator device, distribution system, allow one-piece construction, steering logic and the programmed method of students system;
(7) system emulation training module point position can be corresponding one by one with the some position of Softwares of System Simulation, the data of the result of the own simulation operations of observation that the student can be simple and clear and whole system operation.
A kind of intelligent building equipment monitoring system actual training device that the utility model provides, during real training general in-situ is controlled real training panel 1, expansion module panel 2, DDC controller panel 3 is installed to arbitrarily in the draw-in groove of practical traning platform 100, comprise the equipment that each experience system control circuit is required in the general in-situ control real training panel 1, and the wiring of each equipment has been guided on the terminal of corresponding panel, sensor and actuator mesh plate training module 4 can be installed arbitrarily the required sensor of each experience system, actuator and front-end equipment, real training process middle school student select suitable sensor and actuator to be installed on the mesh plate according to requirement of experiment, and the installation and adjustment of the engineering experimental exercising equipment of drawing system point bit table and wiring diagram completion system.System emulation training module 5 comprises central air conditioner system, illuminator, supply and drain water system, elevator device, distribution system, when the student operates, system emulation training module 5 is passed to the DDC controller to the information of operation, and the DDC controller moves according to the program that the student compiles.The synchronous signal acquisition module detects DDC the controller signal of accepting and the signal that sends, and send simulation software to by the RS485 agreement, thereby the operation that reaches system emulation training module and software emulation interface is synchronous.
Above content is in conjunction with concrete preferred implementation further detailed description of the utility model, can not assert that implementation of the present utility model is confined to these explanations.For the utility model person of an ordinary skill in the technical field, without departing from the concept of the premise utility, can also make some simple deduction or replace, all should be considered as belonging to protection domain of the present utility model.

Claims (6)

1. intelligent building equipment monitoring system actual training device, it is characterized in that: comprise practical traning platform, but the detachable installing type of described practical traning platform is connected with general in-situ control real training panel, expansion module panel, DDC controller panel, sensor and actuator mesh plate training module, system emulation training module, signal acquisition module and register face, described sensor and actuator mesh plate training module comprise mesh plate, described mesh plate is connected with described practical traning platform, and described mesh plate is provided with mesh.
2. intelligent building equipment monitoring system actual training device according to claim 1 is characterized in that: described general in-situ control real training panel, expansion module panel, DDC controller panel, sensor and actuator mesh plate training module, system emulation training module, signal acquisition module is connected with register face with described practical traning platform is that buckle-type is connected.
3. intelligent building equipment monitoring system actual training device according to claim 2, it is characterized in that: described practical traning platform is provided with draw-in groove, and described general in-situ control real training panel, expansion module panel, DDC controller panel, sensor and actuator mesh plate training module, system emulation training module, signal acquisition module and register face are equipped with fixture block.
4. intelligent building equipment monitoring system actual training device according to claim 1, it is characterized in that: described sensor and actuator mesh plate training module comprise sensor, and described sensor is connected by mesh with described mesh plate.
5. intelligent building equipment monitoring system actual training device according to claim 1, it is characterized in that: described sensor and actuator mesh plate training module comprise actuator, and described actuator is connected by mesh with described mesh plate.
6. intelligent building equipment monitoring system actual training device according to claim 1, it is characterized in that: described system emulation training module comprises central air conditioner system, illuminator, supply and drain water system, elevator device and distribution system.
CN 201220320747 2012-07-04 2012-07-04 Training device for building intelligent equipment monitoring system Expired - Lifetime CN202736331U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220320747 CN202736331U (en) 2012-07-04 2012-07-04 Training device for building intelligent equipment monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220320747 CN202736331U (en) 2012-07-04 2012-07-04 Training device for building intelligent equipment monitoring system

Publications (1)

Publication Number Publication Date
CN202736331U true CN202736331U (en) 2013-02-13

Family

ID=47662009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220320747 Expired - Lifetime CN202736331U (en) 2012-07-04 2012-07-04 Training device for building intelligent equipment monitoring system

Country Status (1)

Country Link
CN (1) CN202736331U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104196279A (en) * 2014-08-22 2014-12-10 中广核核电运营有限公司 Comprehensive training scene for nuclear power station personnel security skill
CN105741652A (en) * 2016-03-30 2016-07-06 淮阴师范学院 Electric professional multifunctional comprehensive practical training platform
CN109118872A (en) * 2018-10-23 2019-01-01 广东唯康教育科技股份有限公司 A kind of intelligent building security protection wiring experience system
CN109741659A (en) * 2019-01-24 2019-05-10 重庆电子工程职业学院 A kind of multi-panel buckle training station for teaching and training
CN114596764A (en) * 2022-03-25 2022-06-07 北京智扬北方国际教育科技有限公司 Asynchronous motor assembly and operation detection training platform

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104196279A (en) * 2014-08-22 2014-12-10 中广核核电运营有限公司 Comprehensive training scene for nuclear power station personnel security skill
CN104196279B (en) * 2014-08-22 2016-04-20 中广核核电运营有限公司 A kind of nuclear power station personal security technical ability combined training scene
CN105741652A (en) * 2016-03-30 2016-07-06 淮阴师范学院 Electric professional multifunctional comprehensive practical training platform
CN109118872A (en) * 2018-10-23 2019-01-01 广东唯康教育科技股份有限公司 A kind of intelligent building security protection wiring experience system
CN109741659A (en) * 2019-01-24 2019-05-10 重庆电子工程职业学院 A kind of multi-panel buckle training station for teaching and training
CN114596764A (en) * 2022-03-25 2022-06-07 北京智扬北方国际教育科技有限公司 Asynchronous motor assembly and operation detection training platform

Similar Documents

Publication Publication Date Title
CN202736331U (en) Training device for building intelligent equipment monitoring system
CN103208220B (en) Intelligent type low-voltage is for distribution training system and practical training method thereof
CN205122083U (en) Thermal technology instructs system in fact based on virtual object
CN100543800C (en) A kind of pressure-constant water supply cluster teaching system
CN210244682U (en) Electric power marketing simulation training system
CN104966456A (en) PROFIBUS based fault setting system
CN104091502B (en) Low-tension centralized meter reading and installation training device based on carrier technology
CN103970123A (en) PLC device control program electric test platform and method for flow industrial automatic system
CN203630820U (en) Automatic deploying and guiding system of campus self-study rooms
CN204832077U (en) Humiture adjustable concrete shrinkage test box
CN203960333U (en) multiple branch circuit load device
CN102903286B (en) Distant place fault setting and monitoring system of practical training substation
CN211555169U (en) Liquid level monitoring system practical training device based on MCGS
CN104091481A (en) Comprehensive skill training system for secondary equipment of electric system
CN202736341U (en) Novel electrical mounting and building practical training examination device
CN202004363U (en) Mimic screen system
CN205451562U (en) Real standard platform of microprocessor technology
CN202274575U (en) Intelligent through-flow ventilation control device
CN202736330U (en) Multifunctional mesh type mounted training frame
CN201199400Y (en) Modularization training equipment for programmable controller
CN205644327U (en) Management and control system with ability equipment
CN102750864A (en) Teaching and practical training device arranged on equipment
CN201655060U (en) Industrial digital servo system training device
CN204496760U (en) A kind of actual training device of PLC control net system
CN201662901U (en) Singlechip intelligent detection control equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210609

Address after: 511b, 5 / F, Saige Baishi phase II plant, No.1 Hongliu Road, Fubao community, Fubao street, Futian District, Shenzhen, Guangdong 518000

Patentee after: Shenzhen Penguin Education Technology Co.,Ltd.

Address before: 518000 Room 502, 5th floor, block C, Yuehua Industrial Zone, Yuehua Road, shangmeilin, Futian District, Shenzhen City, Guangdong Province

Patentee before: SHENZHEN SONTAHITEC INDUSTRY DEVELOPMENT Co.,Ltd.

TR01 Transfer of patent right
CX01 Expiry of patent term

Granted publication date: 20130213

CX01 Expiry of patent term