CN202731967U - Wind tube protective screening - Google Patents

Wind tube protective screening Download PDF

Info

Publication number
CN202731967U
CN202731967U CN201220371102.0U CN201220371102U CN202731967U CN 202731967 U CN202731967 U CN 202731967U CN 201220371102 U CN201220371102 U CN 201220371102U CN 202731967 U CN202731967 U CN 202731967U
Authority
CN
China
Prior art keywords
protective screening
wind tube
air duct
slungshot
screening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201220371102.0U
Other languages
Chinese (zh)
Inventor
陈日辉
刘世涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming University of Science and Technology
Original Assignee
Kunming University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming University of Science and Technology filed Critical Kunming University of Science and Technology
Priority to CN201220371102.0U priority Critical patent/CN202731967U/en
Application granted granted Critical
Publication of CN202731967U publication Critical patent/CN202731967U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Ventilation (AREA)

Abstract

The utility model provides a wind tube protective screening, and belongs to the field of a ventilation of an underground construction and security. A protective screening (1) is arranged between the front of a wind tube exhaust inlet (8) and a roadway working face (5). A maximum diagonal line of a single grid of the protective screening (1) is less than the minimum diameter of a blasting slungshot. The edge of the protective screening (1) is fixed on a roadway wall (3) and a roadway top plate (4) by adopting a pothook (2). On one hand, the protective screening can prevent the slungshot from smashing the wind tube in the process of carrying out explosion of the working face. On the other hand, due to the existence of mesh holes, an aircurrent can be enabled to be passed through freely to reach the working face. The normal operatin of a ventilating system can be guaranteed. Blasting fume produced by a blasting operation can be excluded effectively and timely. The occurrence of toxication and suffocation accidents is prevented, the safety production is guaranteed, and the labor productivity is improved. When the wind tube protective screening is not needed to be used, the wind tube protective screening can be taken down timely, and therefore other works of wording procedures are not impeded. The wind tube protective screening is simple in structure and convenient to use and maintain.

Description

A kind of air duct protective screening
Technical field
The utility model relates to a kind of air duct protective screening, especially cuts the air duct protective screening of gear blasting flyrock, belongs to underground construction and ventilates and security fields.
Background technology
The dead face driving of underground construction often will adopt booster to ventilate, and booster ventilates and usually is comprised of ventilation fan and air duct.That its draft type has usually is forced, pull-out type and hybrid etc.For the ventilation effect that obtains, air duct air outlet (forced) or intake (pull-out type) must be not more than effective range (forced) or the effective absorption distance (pull-out type) of air duct to the distance of work plane.But the distance of effective range (forced) or effective absorption distance (pull-out type) is all shorter, especially the distance of effective absorption distance (pull-out type) is shorter, the casting distance of some slungshots is short during usually all than explosion, and this just means that air duct unavoidably can be subject to the attack of slungshot.In order to make air duct avoid the infringement of slungshot, people often are installed in air duct the place away from work plane, have reduced widely ventilation effect, can't dilute quickly and effectively blasting fume, the dust of getting rid of work plane, have serious accident potential.Therefore, must take effective air duct safeguard procedures, improve the reliability that booster ventilates.The air duct protective screening that the utility model provides, the air duct that booster is ventilated exempts from the infringement of slungshot, does not hinder distinguished and admirable unimpeded simultaneously.Ventilation effect is good, guarantees safe production.
Summary of the invention
The utility model provides a kind of air duct protective screening, at one of air duct air outlet (forced) or inlet scoop (pull-out type) forward mounting protective screening firmly, can cut the gear slungshot during explosion, make air duct exempt from damage, can by distinguished and admirable, ensure booster ventilation normal operation again.
The structure of the utility model air duct protective screening is: as shown in Figure 2, before air duct inlet scoop 8 and between the tunnel work plane 5, a protective screening 1 is set, the diagonal of the single grid maximum of protective screening 1 is less than the minimum diameter of the slungshot of explosion, and the minimum diameter of the slungshot of explosion should be determined according to field experiment.
The edge of described protective screening 1 adopts hook 2 to be fixed on wall 3 and back 4.Hook as much as possible can make edge better fit wall 3, back 4 and ground, tunnel.As shown in Figure 1.
Described protective screening 1 reserves suitable distance with air duct inlet scoop 8, does not touch air duct inlet scoop 8 when being subject to impacting with protective screening and is advisable.
Described protective screening 1 protective screening 1 mounting points is as far as possible away from tunnel work plane 5, is not advisable but do not touch air duct inlet scoop 8 when making again protective screening be subject to impacting.
Before work plane 5 explodes, protective screening 1 is hung over securely on the hook 2 of wall 3 and back 4.During explosion, throwing stone is out stopped by protective screening 1, makes rigidity air duct 7 avoid damaging.Simultaneously, the mesh that protective screening 1 is crossed in wind circulation arrives work plane, rapidly with blasting fume dilution, eliminating.
After a period of time of ventilating, when the concentration of the toxic and harmful of work plane reaches allowable concentration, protective screening 1 is taken off from linking up with 2, be placed on suitable place, the current equipment that reaches of not obstruction personnel passes through.At this moment, just can carry out the work of next operation.
Along with constantly pushing ahead of work plane 5, air duct 7 also constantly prolongs forward.Correspondingly, the position of the hook 2 of wall 3 and back 4 also will arrange forward, so that protective screening 1 is in suitable position, air duct 7 is played effective protective action.
Having a few and good effect of air duct protective screening described in the utility model: the one, it plays protective action to air duct, namely stops the slungshot of bursting work, makes air duct avoid infringement, and the 2nd, it ensures that booster ventilates smooth and easy effective to the distinguished and admirable inhibition that do not rise.The 3rd, it can be taken off when not needing protective screening, do not hinder other work.
Description of drawings
Fig. 1 is the structural representation of the utility model air duct protective screening;
Fig. 2 is the schematic diagram that the utility model air duct protective screening is distributed in the tunnel.
Each label is among the figure: 1-protective screening, 2-hook, 3-wall, 4-back, 5-work plane, 6-hanging stick, 7-air duct, 8-air duct inlet scoop.
The specific embodiment
Below in conjunction with embodiment and accompanying drawing the utility model is further described, but the utility model is not limited to the following stated scope.
Embodiment 1: the structure of the air duct protective screening of the present embodiment is: before air duct inlet scoop 8 and between the tunnel work plane 5, a protective screening 1 is set, the diagonal of the single grid maximum of protective screening 1 is less than the minimum diameter of the slungshot of explosion, and the minimum diameter of the slungshot of explosion should be determined according to field experiment.The edge of protective screening 1 adopts hook 2 to be fixed on wall 3 and back 4, adopts 8 hooks on the wall 3, adopts 5 hooks on the back, makes protective screening well be fitted in wall 3, back 4 and ground, tunnel.Protective screening 1 reserves suitable distance with air duct inlet scoop 8, does not touch air duct inlet scoop 8 when being subject to impacting with protective screening and is advisable.Protective screening 1 protective screening 1 mounting points is as far as possible away from tunnel work plane 5, is not advisable but do not touch air duct inlet scoop 8 when making again protective screening be subject to impacting.
Embodiment 2: the structure of the air duct protective screening of the present embodiment is: before air duct inlet scoop 8 and between the tunnel work plane 5, a protective screening 1 is set, the diagonal of the single grid maximum of protective screening 1 is less than the minimum diameter of the slungshot of explosion, and the minimum diameter of the slungshot of explosion should be determined according to field experiment.The edge of protective screening 1 adopts hook 2 to be fixed on wall 3 and back 4, adopt 6 hooks on the wall 3, adopt 3 hooks on the back 4, adopt 2 hooks on the ground, tunnel, adopt 5 hooks on the back, make protective screening well be fitted in wall 3, back 4 and ground, tunnel.Protective screening 1 reserves suitable distance with air duct inlet scoop 8, does not touch air duct inlet scoop 8 when being subject to impacting with protective screening and is advisable.Protective screening 1 protective screening 1 mounting points is as far as possible away from tunnel work plane 5, is not advisable but do not touch air duct inlet scoop 8 when making again protective screening be subject to impacting.

Claims (2)

1. air duct protective screening is characterized in that: between the front and tunnel work plane (5), protective screening (1) is set in air duct inlet scoop (8), the diagonal of the single grid maximum of protective screening (1) is less than the minimum diameter of the slungshot of explosion.
2. air duct protective screening according to claim 1 is characterized in that: the edge of described protective screening (1) adopts hook (2) to be fixed on wall (3) and back (4).
CN201220371102.0U 2012-07-30 2012-07-30 Wind tube protective screening Expired - Fee Related CN202731967U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201220371102.0U CN202731967U (en) 2012-07-30 2012-07-30 Wind tube protective screening

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201220371102.0U CN202731967U (en) 2012-07-30 2012-07-30 Wind tube protective screening

Publications (1)

Publication Number Publication Date
CN202731967U true CN202731967U (en) 2013-02-13

Family

ID=47657679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201220371102.0U Expired - Fee Related CN202731967U (en) 2012-07-30 2012-07-30 Wind tube protective screening

Country Status (1)

Country Link
CN (1) CN202731967U (en)

Similar Documents

Publication Publication Date Title
CN202520352U (en) Large-cross section gas outburst tunnel ventilating system
CN201679751U (en) Cylindrical fan
CN202731967U (en) Wind tube protective screening
CN204084399U (en) Rotary kiln cooling device
CN204137711U (en) A kind of water chute reduces percussion mechanism for reducing parcel slip velocity
CN201763700U (en) Fan of structure with shutter blade and rainproof elbow
CN203441516U (en) Ventilation structure of sliding and blasting system and capable of effectively removing dust and cooling
CN205259571U (en) Hanging flower basket structure for building engineering
CN202788905U (en) Air duct protective cover
CN203485741U (en) Exhaust device capable of reducing temperature of engine cabin
CN204024693U (en) A kind of tunnel jet blower
CN207538470U (en) A kind of construction cutting Dustproof air flue device
CN204638337U (en) Anti-blocking, easy to clean cement grinding mill discharge grid plate device
CN204582853U (en) A kind of cloth bag that prevents drops the ash bucket of the defeated grey equipment of blocking
CN203100168U (en) Gas forced-discharge pipe for gas water heater
CN203900742U (en) Cutting device for color steel heat-insulating plate
CN203847450U (en) Explosion-proof axial flow fan
CN204073748U (en) A kind of dust collection equipment for the workshop air circulatory system
CN202731966U (en) Air duct protection device
CN202963015U (en) Steel-making secondary high-pressure dust removal device
CN204961332U (en) Take novel fan of stiffening rib
CN210320568U (en) Left and right side plates of condenser of mobile air conditioner
CN202731968U (en) Movable type wind tube
CN204212799U (en) The directed dedusting fan of a kind of mine
CN202914120U (en) Tunnel ventilation device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130213

Termination date: 20150730

EXPY Termination of patent right or utility model