CN202731258U - Floor tile paving tool - Google Patents
Floor tile paving tool Download PDFInfo
- Publication number
- CN202731258U CN202731258U CN 201220293767 CN201220293767U CN202731258U CN 202731258 U CN202731258 U CN 202731258U CN 201220293767 CN201220293767 CN 201220293767 CN 201220293767 U CN201220293767 U CN 201220293767U CN 202731258 U CN202731258 U CN 202731258U
- Authority
- CN
- China
- Prior art keywords
- edge
- hammer
- central
- central authorities
- tup
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Percussive Tools And Related Accessories (AREA)
Abstract
The utility model relates to a floor tile paving tool which comprises a tool support, a central hammering device and a plurality of edge hammering devices, wherein the central hammering device is arranged at the position of the center of the tool support, and the edge hammering devices are arranged on the periphery of the tool support which comprises a central connector, a plurality of edge connectors and a plurality of connecting rods. The front end of each connecting rod is fixedly connected to a side wall of the central connector, the rear end of each connecting rod is fixedly connected with each edge connector, the central hammering device is connected with the interior of the central connector in an inserting mode, and each edge hammering device is correspondingly connected with the interior of edge connector in an inserting mode.
Description
Technical field
The utility model relates to a kind of construction tool, refers to especially a kind of in order to lay the construction tool of ground floor tile.
Background technology
As everyone knows, the continuous lifting that self dwelling environment is required along with people, the present general indoor floor tile that all is equipped with, when specifically constructing, at first General Requirements constructing operation personnel must possess above practical operation experience of several years, should check before construction whether basic unit's performance meets design and code requirement, and whether basic unit is smooth, should carry if any out-of-flatness and to pick cutter and repairing treatment the previous day, perform handing-over inspection formality with a upper procedure; Whether the specification of inspection floor tile meets the modulus relation between design and on-the-spot real size; Also need to check afterwards wall, whether post and ground handing-over have hole, pipeline, privileged sites, should carry out the floor tile examination before reality is laid spreads, floor tile is placed directly on the tack coat by real shop requirement, use rubber hammer jolt ramming, guarantee that floor tile is smooth on the one hand, the slit is straight, on the other hand tack coat compacting, such as the unreal stop-off slurry that needs, crossing at most, shovel falls unnecessary mortar, in real the shop, need to use rubber hammer one by one with each all jolt ramming of piece floor tile, and firmly wanting evenly with the anti-tamper floor tile, also needs to check planeness with spirit level, require surfacing in the process of construction, solid colour, brickwork joint, cross crotch is clear and coherent, the seam height is unanimously smooth, and it is closely knit firm in hollowing to bond, and reaches the requirement of finished surface absolute altitude and design.
If in Specific construction, carry out really can guaranteeing the quality of integral construction according to mode as above, but because the difference of constructor's technology, be difficult in implementation guarantee that the quality of every floor tile construction is all identical, especially in traditional job practices, need to use rubber hammer one by one with each all jolt ramming of piece floor tile, and firmly also want evenly, not only the loaded down with trivial details efficiency of construction of step is low for this job practices, construction quality can not be guaranteed, and this is the major defect for conventional art.
The utility model content
The utility model provides a kind of ground tile paving instrument, can the convenient construction personnel finishes laying to floor tile by structural design scheme of the present utility model, and can guarantee the quality of laying construction, and this is main purpose of the present utility model.
Technical solution adopted in the utility model is: a kind of ground tile paving instrument, it comprises tool holder, central hammer and some edges hammer, wherein, this central authorities' hammer is arranged on the middle position of this tool holder, and some this edge hammers be arranged on this tool holder around.
This tool holder comprises central connector, some edge connectors and some connecting rods, wherein, the front end of each this connecting rod is fixedly connected on the sidewall of this central connector, and the rear end of each this connecting rod is fixedly connected with this edge connector, this central authorities' hammer is plugged in this central connector, and each this edge hammer correspondence is plugged in this edge connector.
This central authorities' hammer comprises central tup and central hammer stem, and this central authorities' tup is fixedly connected on the front end of this central authorities' hammer stem, is connected with the intermediate pulling spring between this central authorities' hammer stem and this central connector.
Each this edge hammer comprises edge tup and edge hammer stem, and this edge tup is fixedly connected on the front end of this edge hammer stem, is connected with the edge tension spring between this edge hammer stem and this edge connector,
This central authorities' tup of this central authorities' hammer and this edge tup of this edge hammer are all made by flexible material, such as rubber.
This central authorities' tup of this central authorities' hammer and this edge tup of this edge hammer are on the same level face, and the end of some these edge hammer stems links together by pull bar in implementation.
The beneficial effects of the utility model are: the utility model is in implementation, at first need the utility model integral cap is located on the floor tile, then at first upwards spurring this central authorities' hammer then discharges, elastic acting force by spring should will move downward and the hammering floor tile by central authorities' hammer like this, can specifically determine as required the number of times of hammering, upwards spurring afterwards this pull bar then discharges, will move downward and the hammering floor tile by some these edge hammers of the elastic acting force of spring like this, can specifically determine as required the number of times of hammering, so moving in circles just can be with the high-quality laying of floor tile on the ground.
Description of drawings
Fig. 1 is top view of the present utility model.
Fig. 2 is lateral view of the present utility model.
Fig. 3 is the cross-sectional view of central hammer of the present utility model, edge hammer.
Fig. 4 is the structure chart that is provided with pull bar on the utility model.
The specific embodiment
As shown in Figures 1 to 4, a kind of ground tile paving instrument, it comprises tool holder 10, central hammer 20 and some edges hammer 30.
Wherein, this central authorities' hammer 20 is arranged on the middle position of this tool holder 10, and some this edge hammers 30 be arranged on this tool holder 10 around.
This tool holder 10 comprises central connector 11, some edge connectors 12 and some connecting rods 13, wherein, the front end of each this connecting rod 13 is fixedly connected on the sidewall of this central connector 11, and the rear end of each this connecting rod 13 is fixedly connected with this edge connector 12.
This central authorities' hammer 20 is plugged in this central connector 11.
Each these edge hammer 30 correspondence is plugged in this edge connector 12.
This central authorities' hammer 20 comprises central tup 21 and central hammer stem 22, and this central authorities' tup 21 is fixedly connected on the front end of this central authorities' hammer stem 22.
Be connected with intermediate pulling spring 23 between this central authorities' hammer stem 22 and this central connector 11.
Each this edge hammer 30 comprises edge tup 31 and edge hammer stem 32, and this edge tup 31 is fixedly connected on the front end of this edge hammer stem 32.
Be connected with edge tension spring 33 between this edge hammer stem 32 and this edge connector 12.
This central authorities' tup 21 of this central authorities' hammer 20 and this edge tup 31 of this edge hammer 30 are all made by flexible material, such as rubber.
This central authorities' tup 21 of this central authorities' hammer 20 is on the same level face with this edge tup 31 of this edge hammer 30.
As shown in Figure 4, the end of some these edge hammer stems 32 links together by pull bar 40 in implementation.
The utility model is in implementation, at first need the utility model integral cap is located on the floor tile, then at first upwards spurring this central authorities' hammer 20 then discharges, elastic acting force by spring should will move downward and the hammering floor tile by central authorities' hammer 20 like this, can specifically determine as required the number of times of hammering, upwards spurring afterwards this pull bar 40 then discharges, will move downward and the hammering floor tile by some these edge hammers 30 of the elastic acting force of spring like this, can specifically determine as required the number of times of hammering, so moving in circles just can be with the high-quality laying of floor tile on the ground.
Claims (5)
1. ground tile paving instrument, it is characterized in that: comprise tool holder, central authorities' hammer and some edges hammer, wherein, this central authorities' hammer is arranged on the middle position of this tool holder, and some these edge hammers be arranged on this tool holder around, this tool holder comprises central connector, some edge connectors and some connecting rods, wherein, the front end of each this connecting rod is fixedly connected on the sidewall of this central connector, and the rear end of each this connecting rod is fixedly connected with this edge connector, this central authorities' hammer is plugged in this central connector, and each this edge hammer correspondence is plugged in this edge connector.
2. a kind of ground tile paving instrument as claimed in claim 1, it is characterized in that: this central authorities' hammer comprises central tup and central hammer stem, this central authorities' tup is fixedly connected on the front end of this central authorities' hammer stem, be connected with the intermediate pulling spring between this central authorities' hammer stem and this central connector, each this edge hammer comprises edge tup and edge hammer stem, this edge tup is fixedly connected on the front end of this edge hammer stem, is connected with the edge tension spring between this edge hammer stem and this edge connector.
3. a kind of ground tile paving instrument as claimed in claim 2, it is characterized in that: this central authorities' tup of this central authorities' hammer and this edge tup of this edge hammer are all made by flexible material.
4. a kind of ground tile paving instrument as claimed in claim 2, it is characterized in that: this central authorities' tup of this central authorities' hammer and this edge tup of this edge hammer are on the same level face.
5. a kind of ground tile paving instrument as claimed in claim 4, it is characterized in that: the end of some these edge hammer stems links together by pull bar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220293767 CN202731258U (en) | 2012-06-21 | 2012-06-21 | Floor tile paving tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220293767 CN202731258U (en) | 2012-06-21 | 2012-06-21 | Floor tile paving tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202731258U true CN202731258U (en) | 2013-02-13 |
Family
ID=47656971
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220293767 Expired - Fee Related CN202731258U (en) | 2012-06-21 | 2012-06-21 | Floor tile paving tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202731258U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107762122A (en) * | 2017-09-06 | 2018-03-06 | 刘有生 | A kind of flooring bobbing machine |
CN111706049A (en) * | 2020-06-16 | 2020-09-25 | 山东省产品质量检验研究院 | Automatic trolley for laying ceramic tiles |
CN113863104A (en) * | 2021-10-27 | 2021-12-31 | 陕西旬邑青岗坪矿业有限公司 | Auxiliary clamp for laying floor tiles |
-
2012
- 2012-06-21 CN CN 201220293767 patent/CN202731258U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107762122A (en) * | 2017-09-06 | 2018-03-06 | 刘有生 | A kind of flooring bobbing machine |
CN107762122B (en) * | 2017-09-06 | 2024-03-29 | 浙江知多多网络科技有限公司 | Floor-laying vibrator |
CN111706049A (en) * | 2020-06-16 | 2020-09-25 | 山东省产品质量检验研究院 | Automatic trolley for laying ceramic tiles |
CN111706049B (en) * | 2020-06-16 | 2021-11-23 | 山东省产品质量检验研究院 | Automatic trolley for laying ceramic tiles |
CN113863104A (en) * | 2021-10-27 | 2021-12-31 | 陕西旬邑青岗坪矿业有限公司 | Auxiliary clamp for laying floor tiles |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203965278U (en) | One is concrete slump proving installation movably | |
CN105604343A (en) | Construction method for reinforcing and repairing integral wall of ancient architecture | |
CN201502164U (en) | Tool for paving floor tile | |
CN202731258U (en) | Floor tile paving tool | |
CN203977246U (en) | A kind of assembling road | |
CN107065801B (en) | Simulative construction method is automatically assembled using the section of track production line of BIM technology | |
CN205421322U (en) | Pre -buried rag bolt crowd's positioning tool | |
CN201000412Y (en) | Building project bearing beam load test device | |
CN104005431B (en) | Oblique orthogonal makes template for group's pile-pile cap-superstructure scale model | |
CN104849430B (en) | A kind of domatic construction of platform of artificial raining-simulated apparatus | |
CN203867134U (en) | Structure of indoor tile floor | |
CN203795460U (en) | Basic structure of ballasting tower crane | |
CN201292652Y (en) | Ceramic tile plastering device | |
CN104369165B (en) | A kind of pneumatic pick for excavating architectural engineering rock foundation draws hole support frame | |
CN203133066U (en) | Large-scale compactor hammering system | |
CN203741872U (en) | Structure for improving elevator shaft through stiff beam | |
CN207244974U (en) | A kind of green plant installation system in market | |
CN206787928U (en) | strength testing device for concrete pipe sheet | |
CN204531325U (en) | A kind of tile work exclusive clamps | |
CN106499163A (en) | The floor tile card and its specific purpose tool and laying method of laying floor tile | |
CN204221747U (en) | A kind of Novel air pick for excavating architectural engineering rock foundation draws hole support frame | |
CN204224969U (en) | Brick paving machine gag lever post linkage | |
CN205231618U (en) | Simple and easy pike pole | |
CN203113377U (en) | Basement membrane | |
CN209482666U (en) | For building decoration construction smoother |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 518000 No. 17, Xihongtao Road, Nigang, Luohu District, Shenzhen City, Guangdong Province Patentee after: Shenzhen Hongtao Group Co., Ltd. Address before: 518000 No. 17, Xihongtao Road, Nigang, Luohu District, Shenzhen City, Guangdong Province Patentee before: Shenzhen Hongtao Decoration Co., Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130213 Termination date: 20200621 |