- CN202724954U CN202724954U CN 201220386602 CN201220386602U CN202724954U CN 202724954 U CN202724954 U CN 202724954U CN 201220386602 CN201220386602 CN 201220386602 CN 201220386602 U CN201220386602 U CN 201220386602U CN 202724954 U CN202724954 U CN 202724954U
- Authority
- CN
- China
- Prior art keywords
- dust
- desulfurization
- tower
- smoke
- desulfurization device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Treating Waste Gases (AREA)
Abstract
The utility model discloses a two-level dust-removal desulfurization device, which comprises a desulfurization tower, wherein the desulfurization tower is provided with a smoke inlet and a smoke outlet, the smoke inlet end is connected with a secondary dust collector, the secondary dust collector is connected with a primary dust collector, and the primary dust collector is provided with an air inlet. Impurities in the gas are removed through two levels of dust collectors, so that the two-level dust-removal desulfurization device has advantages of high dust removal efficiency, low running expense and convenience in maintenance; moreover, a great number of smoke and dust can be intercepted outside the desulfurization device through the dust collectors, the smoke and dust can be prevented from entering the tower, and the smoke and dust can be effectively prevented from being mixed, deposited and blocked with other materials inside the tower to block an air blowing and distribution system inside the desulfurization tower; and meanwhile, the abrasion of a mixing system and a circulating system in the running process of the desulfurization device also can be alleviated, the maintenance load of the entire desulfurization tower system can be reduced, and the overhauling period and the service life of the desulfurization facility can be prolonged.
Description
Technical field
The utility model relates to the chemical industry environmental protection technical field, particularly the two-stage dust removal desulfurizer.
Background technology
Traditional dust-removing desulfurating apparatus complex structure, auxiliary device is many, and investment is large, runs unstablely, directly has influence on the dust-removal and desulfurizing effect of flue gas.
In view of this, the inventor has this case to produce for the defects further investigation of desulfurizer in the prior art then.
The utility model content
In order to overcome above shortcomings part in the prior art, the purpose of this utility model is to provide a kind of two-stage dust removal desulfurizer.
In order to reach above-mentioned purpose, the utility model adopts following concrete technical scheme: the two-stage dust removal desulfurizer, comprise desulfurizing tower, desulfurizing tower has gas approach and exhanst gas outlet, described gas approach end is connected with second level deduster, be connected with first order deduster on the deduster of the second level, described first order deduster is provided with air inlet.
Compared with prior art, the utlity model has following outstanding advantages and effect: the deduster of the utility model by two-stage removes the impurity in the gas, efficiency of dust collection is high, operating cost is low, advantage easy to maintenance, and can be trapped in the flue dust overwhelming majority outside the desulfurizing tower by deduster, avoid flue dust to enter in the tower, can effectively prevent flue dust at Ta Nei and unclassified stores mixes and deposition caking and stop up air blast gas distribution system in the desulfurizing tower; Alleviate again simultaneously the wearing and tearing of stirring system and the circulatory system in the desulfurizer running, reduced the maintenance of whole desulfurizing tower system, prolonged time between overhauls(TBO) and the service life of desulfurization facility.
Description of drawings
Fig. 1 is structural representation of the present utility model.
The utility model is described in further detail below in conjunction with accompanying drawing.
The specific embodiment
As shown in Figure 1, the two-stage dust removal desulfurizer, comprise desulfurizing tower 1, desulfurizing tower 1 has gas approach 2 and exhanst gas outlet 3, described gas approach 2 ends are connected with second level deduster 4, be connected with first order deduster 5 on the second level deduster 4, described first order deduster 5 is provided with air inlet 6, the deduster of the utility model by two-stage removes the impurity in the gas, and efficiency of dust collection is high, and operating cost is low, advantage easy to maintenance, and can be trapped in the flue dust overwhelming majority outside the desulfurizing tower by deduster, avoid flue dust to enter in the tower, can effectively prevent flue dust at Ta Nei and unclassified stores mixes and deposition caking and stop up air blast gas distribution system in the desulfurizing tower; Alleviate again simultaneously the wearing and tearing of stirring system and the circulatory system in the desulfurizer running, reduced the maintenance of whole desulfurizing tower system, prolonged time between overhauls(TBO) and the service life of desulfurization facility.
It should be noted that at last: above embodiment is only unrestricted in order to the technical solution of the utility model to be described, although with reference to preferred embodiment the utility model is had been described in detail, those of ordinary skill in the art is to be understood that, can make amendment or be equal to replacement the technical solution of the utility model, and not breaking away from the spirit and scope of technical solutions of the utility model, it all should be encompassed in the middle of the claim scope of the present utility model.
Claims (1)
1. two-stage dust removal desulfurizer, comprise desulfurizing tower, desulfurizing tower has gas approach and exhanst gas outlet, it is characterized in that: described gas approach end is connected with second level deduster, be connected with first order deduster on the deduster of the second level, described first order deduster is provided with air inlet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220386602 CN202724954U (en) | 2012-08-07 | 2012-08-07 | Two-level dust-removal desulfurization device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220386602 CN202724954U (en) | 2012-08-07 | 2012-08-07 | Two-level dust-removal desulfurization device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202724954U true CN202724954U (en) | 2013-02-13 |
Family
ID=47650707
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220386602 Expired - Fee Related CN202724954U (en) | 2012-08-07 | 2012-08-07 | Two-level dust-removal desulfurization device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202724954U (en) |
-
2012
- 2012-08-07 CN CN 201220386602 patent/CN202724954U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107596798A (en) | A kind of pre- dedusting and desulphurization and denitration integrated treatment unit and method | |
CN102003886B (en) | Sintering machine flue gas separation conduction type desulfurizing device and method | |
CN205109896U (en) | Multitube cyclone dust collector flue gas diverging device | |
CN202724954U (en) | Two-level dust-removal desulfurization device | |
CN203610040U (en) | Desulphurization device used for movable tunnel kiln | |
CN203148245U (en) | System for treating flue gas of anode furnace | |
CN102755960B (en) | Sand flotation production device by dry | |
CN205199286U (en) | Boiler desulfurization dust removal purification ware | |
CN203021519U (en) | Basket-type dry desulfurization tower | |
CN201008774Y (en) | Macrotype blast furnace gas dry type cloth bag dust remover | |
CN201152536Y (en) | Flue arrangement structure and flue gas desulfurization system containing same | |
CN203938211U (en) | Dustproof mixer | |
CN102764579A (en) | Dedusting and desulfurizing technique of industrial silicon metal furnace smoke | |
CN201885585U (en) | Guiding type desulfurizer for smoke of sintering machine | |
CN106964213A (en) | A kind of modular radial dedusting Benitration reactor | |
CN206682968U (en) | A kind of station boiler afterheat utilizing system | |
CN205042318U (en) | Dust recovery device that power plant discharged | |
CN205252879U (en) | Brick is calcined and is used flue flue gas desulphurization unit | |
CN203244855U (en) | Tail gas dedusting system of rubber refining machine | |
CN204159177U (en) | A kind of cement plant Multi-stage dust removing device | |
CN203975805U (en) | A kind of circulating ash feeder of large delivery rate | |
CN204395730U (en) | A kind of process system of flue gas combined desulfurization decarburization | |
CN204582941U (en) | Boiler fume desulfurizing and dedusting integrated apparatus | |
CN204638018U (en) | A kind of lime dissolving device supporting with desulfurizer | |
CN208526272U (en) | Feed liquor for limestone-gypsum wet desulfuration converges device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130213 Termination date: 20190807 |
|