CN202718447U - 110kV双回路线路钻越铁塔 - Google Patents

110kV双回路线路钻越铁塔 Download PDF

Info

Publication number
CN202718447U
CN202718447U CN 201220390517 CN201220390517U CN202718447U CN 202718447 U CN202718447 U CN 202718447U CN 201220390517 CN201220390517 CN 201220390517 CN 201220390517 U CN201220390517 U CN 201220390517U CN 202718447 U CN202718447 U CN 202718447U
Authority
CN
China
Prior art keywords
arm
cross
tower
cross arms
steel tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220390517
Other languages
English (en)
Inventor
樊和平
张秀丽
孙利春
崔尚印
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Handan Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
Handan Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Handan Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical Handan Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority to CN 201220390517 priority Critical patent/CN202718447U/zh
Application granted granted Critical
Publication of CN202718447U publication Critical patent/CN202718447U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本实用新型公开一种110kV双回路线路钻越铁塔,由塔身(1)、塔脚板(5)和横担组成,在横担上有固定导、地线的挂点,塔脚板(5)、横担与塔身(1)连为一体,横担为左右两路,对称设在塔身(1)的两侧,横担分上层横担(2)、中层横担(3)和下层横担(4)三层,左、右路的中层横担(3)分别用于固定本回路的一根导线,左、右路的下层横担(4)分别用于固定本回路的其它两根导线,上横担(2)用于固定地线及中层横担(3)所固定导线的跳线,每回路三根导线均呈三角布置。它是一种能钻越已有220kV及以上电压等级线路的一种铁塔。

Description

110kV双回路线路钻越铁塔
技术领域
本实用新型涉及一种电力杆塔,尤其是一种电力系统110kV输电线路用于固定导、地线的双回路线路钻越铁塔。
背景技术
现有的双回路铁塔导线排列形式均为垂直排列(三排横担),连地线横担共有4排横担,虽然能节省线路走廊,但在钻越现有220kV及以上电压等级线路时,大部分钻越点现有铁塔无法实现在不改造现有线路的情况下钻越;因此,设计一种能够钻越现有220kV及以上线路铁塔的110kV双回路线路钻越铁塔,是目前需要解决的技术问题。
发明内容
发明内容
本本实用新型所要解决的技术问题是提供一种能够钻越现有220kV及以上线路铁塔的110kV双回路线路钻越铁塔。
本实用新型解决其技术问题的技术方案是:
110kV双回路线路钻越铁塔,由塔身、塔脚板和横担组成,在横担上有固定导、地线的挂点,塔脚板、横担与塔身连为一体,横担为左右两路,对称设在塔身的两侧,横担分上层横担、中层横担和下层横担三层,左、右路的中层横担分别用于固定本回路的一根导线,左、右路的下层横担分别用于固定本回路的其它两根导线,上横担用于固定地线及中层横担所固定导线的跳线,每回路三根导线均呈三角布置。
优选地,所述的塔身分上中下三节,上节为矩形柱状,中节为梯形,下节为“八”字形腿,所述的塔脚板固定在腿的下端。
优选地,所述的上层横担为“直角三角形”, “直角三角形”的两个直角边分别在上部和侧部,侧部的直角边为塔身的矩形柱状上节的一部分。
优选地,所述的中层横担和下层横担均为“直角三角形”, “直角三角形”的两个直角边分别在下部和侧部,侧部的直角边为塔身的矩形柱状上节的一部分。
优选地,中层横担短于上层横担和下层横担。
与现有的技术相比,本实用新型能有效的降低铁塔高度(在呼称高度相同的情况下),使110千伏双回路线路在钻越现有220kV及以上电压等级线路时,在不改造现有线路的情况下实现钻越。
附图说明
图1是本实用新型的结构单线图。
具体实施方式
110kV双回路线路钻越铁塔,由塔身1、塔脚板5和横担组成,在横担上有固定导、地线的挂点,塔脚板5、横担与塔身1连为一体,横担为左右两路,对称设在塔身1的两侧,横担分上层横担2、中层横担3和下层横担4三层,左、右路的中层横担3分别用于固定本回路的一根导线,左、右路的下层横担4分别用于固定本回路的其它两根导线,上横担2用于固定地线及中层横担3所固定导线的跳线,每回路三根导线均呈三角布置。
所述的塔身1分上中下三节,上节为矩形柱状,中节为梯形,下节为“八”字形腿,所述的塔脚板5固定在腿的下端。
所述的上层横担2为“直角三角形”, “直角三角形”的两个直角边分别在上部和侧部,侧部的直角边为塔身1的矩形柱状上节的一部分。
所述的中层横担3和下层横担4均为“直角三角形”, “直角三角形”的两个直角边分别在下部和侧部,侧部的直角边为塔身1的矩形柱状上节的一部分。
中层横担3短于上层横担2和下层横担4。
本实用新型的技术参数如下:
1.设计条件
导、地线型号及张力
Figure 137472DEST_PATH_IMAGE001
使用条件
Figure 873347DEST_PATH_IMAGE002
荷载表
Figure 72247DEST_PATH_IMAGE003
注:导线水平荷载为下相导线荷载。
2.根开及基础作用力
根开尺寸
Figure 209967DEST_PATH_IMAGE004
基础作用力(kN)
Figure 203331DEST_PATH_IMAGE005

Claims (5)

1.110kV双回路线路钻越铁塔,由塔身(1)、塔脚板(5)和横担组成,在横担上有固定导、地线的挂点,塔脚板(5)、横担与塔身(1)连为一体,其特征在于:横担为左右两路,对称设在塔身(1)的两侧,横担分上层横担(2)、中层横担(3)和下层横担(4)三层,左、右路的中层横担(3)分别用于固定本回路的一根导线,左、右路的下层横担(4)分别用于固定本回路的其它两根导线,上横担(2)用于固定地线及中层横担(3)所固定导线的跳线,每回路三根导线均呈三角布置。
2.根据权利要求1所述的110kV双回路线路钻越铁塔,其特征在于:所述的塔身(1)分上中下三节,上节为矩形柱状,中节为梯形,下节为“八”字形腿,所述的塔脚板(5)固定在腿的下端。
3.根据权利要求2所述的110kV双回路线路钻越铁塔,其特征在于:所述的上层横担(2)为“直角三角形”, “直角三角形”的两个直角边分别在上部和侧部,侧部的直角边为塔身(1)的矩形柱状上节的一部分。
4.根据权利要求3所述的110kV双回路线路钻越铁塔,其特征在于:所述的中层横担(3)和下层横担(4)均为“直角三角形”, “直角三角形”的两个直角边分别在下部和侧部,侧部的直角边为塔身(1)的矩形柱状上节的一部分。
5.根据权利要求1所述的110kV双回路线路钻越铁塔,其特征在于:中层横担(3)短于上层横担(2)和下层横担(4)。
CN 201220390517 2012-08-08 2012-08-08 110kV双回路线路钻越铁塔 Expired - Fee Related CN202718447U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220390517 CN202718447U (zh) 2012-08-08 2012-08-08 110kV双回路线路钻越铁塔

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220390517 CN202718447U (zh) 2012-08-08 2012-08-08 110kV双回路线路钻越铁塔

Publications (1)

Publication Number Publication Date
CN202718447U true CN202718447U (zh) 2013-02-06

Family

ID=47620273

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220390517 Expired - Fee Related CN202718447U (zh) 2012-08-08 2012-08-08 110kV双回路线路钻越铁塔

Country Status (1)

Country Link
CN (1) CN202718447U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102817491A (zh) * 2012-08-08 2012-12-12 邯郸供电公司 110kV双回路线路钻越铁塔
CN111682479A (zh) * 2020-07-02 2020-09-18 国核电力规划设计研究院有限公司 单回输电线路铁塔及输电线路塔系统
CN111682483A (zh) * 2020-07-02 2020-09-18 国核电力规划设计研究院有限公司 输电线路钻越塔及输电线路塔系统

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102817491A (zh) * 2012-08-08 2012-12-12 邯郸供电公司 110kV双回路线路钻越铁塔
CN111682479A (zh) * 2020-07-02 2020-09-18 国核电力规划设计研究院有限公司 单回输电线路铁塔及输电线路塔系统
CN111682483A (zh) * 2020-07-02 2020-09-18 国核电力规划设计研究院有限公司 输电线路钻越塔及输电线路塔系统

Similar Documents

Publication Publication Date Title
CN202520040U (zh) 一种实现双回路输电线双t接用的分歧杆塔
CN202718447U (zh) 110kV双回路线路钻越铁塔
CN205509438U (zh) 四回路电缆终端引下装置
CN104196301B (zh) 一种交叉换位塔
CN202017375U (zh) 220kV鹰嘴蝶形钻越塔
CN102817491A (zh) 110kV双回路线路钻越铁塔
CN201953131U (zh) 220kV同塔双回直线转角钻越塔
CN203961408U (zh) 终端电缆塔和终端电缆塔组合
CN205577567U (zh) 一种双回路双t接钢管杆
CN104763208A (zh) 高海拔地区110kV双回路新型蝶形钻越塔
CN206894191U (zh) 一种单回路钻跨输电线路
CN201821070U (zh) 双回紧凑型输电线路跳线为水平绕跳的转角塔
CN204691370U (zh) 高海拔地区110kV双回路新型蝶形钻越塔
CN207620484U (zh) 一种适用于河西走廊地区的特高压输电线路钻越塔
CN202678893U (zh) 三相导线品字形共横担布置的输电杆塔
CN203412350U (zh) 一种双回路单侧回路电缆方式开断的输电钢管杆
CN206220619U (zh) 一种单回架空输电线路电缆t接引下耐张塔
CN202395404U (zh) 混压四回路输电线路直线塔
CN202094567U (zh) 交流特高压单柱组合耐张塔双回路换位金具串型系统
CN105735731B (zh) 一种双回路双t接钢管杆
CN205046915U (zh) 一种采用v字型组合串的双回路双侧开断钢管杆塔
CN207469872U (zh) 同塔双回水平排列跳线上绕耐张塔
CN204343772U (zh) 四回路电缆下地窄基电缆终端钢管塔
CN105201264B (zh) 一种双回路门字形布置铁塔
CN207939173U (zh) 一种适用于高原型35kV双回架空线路的"T"接结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: HANDAN POWER SUPPLY COMPANY

Effective date: 20131016

Owner name: HANDAN POWER SUPPLY COMPANY

Effective date: 20131016

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 056002 HANDAN, HEBEI PROVINCE TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20131016

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: Handan Power Supply Company

Address before: 056002 No. 19 Zhonghua North Street, Hebei, Handan

Patentee before: Handan Power Supply Company

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130206

Termination date: 20150808

EXPY Termination of patent right or utility model