CN202706530U - Coping mold board for enclosure wall - Google Patents

Coping mold board for enclosure wall Download PDF

Info

Publication number
CN202706530U
CN202706530U CN201220223856.1U CN201220223856U CN202706530U CN 202706530 U CN202706530 U CN 202706530U CN 201220223856 U CN201220223856 U CN 201220223856U CN 202706530 U CN202706530 U CN 202706530U
Authority
CN
China
Prior art keywords
molds
mold
wood
wooden
enclosure wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201220223856.1U
Other languages
Chinese (zh)
Inventor
傅晓钟
赵桐
马原
张晋绪
殷云峰
张龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU CHANGJIA CONSTRUCTION CO Ltd
Jiangsu Power Transmission & Transformation Corp
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nanjing Tech University
Economic and Technological Research Institute of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
JIANGSU CHANGJIA CONSTRUCTION CO Ltd
Jiangsu Power Transmission & Transformation Corp
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nanjing Tech University
Economic and Technological Research Institute of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU CHANGJIA CONSTRUCTION CO Ltd, Jiangsu Power Transmission & Transformation Corp, State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Nanjing Tech University, Economic and Technological Research Institute of State Grid Jiangsu Electric Power Co Ltd filed Critical JIANGSU CHANGJIA CONSTRUCTION CO Ltd
Priority to CN201220223856.1U priority Critical patent/CN202706530U/en
Application granted granted Critical
Publication of CN202706530U publication Critical patent/CN202706530U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to an coping mold board for an enclosure wall, and the coping mold board comprises plastic molds, wood molds, and droplet line molds, wherein the wood molds respectively comprises two bottom part wood molds and two side wood molds, the two bottom part wood molds which are arranged at two left and right sides are horizontally mounted between the two side wood molds, two plastic molds are respectively placed between a left bottom part wood mold and one side wood mold and between a right bottom part wood mold and the other side wood mold, the two side wood molds are vertically placed, the two side wood molds are fixed through split screw bolts, therefore the bottom wood molds and the plastic molds are stuck in the middle, an interval which is as thick as the enclosure wall body is arranged between the two bottom part wood molds, and droplet line molds are fixed at butted seam parts between the plastic molds and the bottom part wood molds. The coping mold board for the enclosure wall is characterized by adoption of a plastic mold and wood mold combining and assembling method, aluminium alloy line molds which are pinned at abutted seam parts between the plastic molds and the wood molds, utilization of droplet lines after the aluminium alloy line mold removal, guaranteed slurry leak-free properties of the external wall comers and the butted seam parts of the mold board, guaranteed molding quality, fast construction speed, and small quantity of personnel input. Meanwhile, the plastic molds which can be recycled and used for a second time are characterized by renewed processing properties and environment-friendly and energy-saving properties.

Description

The enclosure wall coping formwork
Technical field
The utility model relates to a kind of building construction formwork, specifically relate to a kind of for transformer station's enclosure wall bear down on one the construction template.Belong to technical field of building construction.
Background technology
Along with the development of power construction, the infrastructure such as transformer station are also more and more.Enclosure wall will be set up in periphery at facilities such as transformer stations, with the protection electric power facility.Can set up enclosure wall to bear down on one at the enclosure wall top, the one, for attractive in appearance, the 2nd, can prevent that also rainwater from directly pouring on the enclosure wall, make the rainwater body of wall, cause the quality problems such as wall leakage, cause easily the defectives such as body of wall expansion, reduction of service life.Simultaneously enclosure wall bear down on one below can be provided with drip, prevent from that the rainwater of enclosure wall on bearing down on one from bearing down on one along enclosure wall to flow on the enclosure wall body of wall.
Bear down on one for enclosure wall, present constructure scheme is to bear down on one with wooden form formwork, cast-in-situ concrete in the scene.But such constructure scheme village is defective once: 1, the construction period long, join template, assembling procedure is complicated; 2, the wooden form external corner easily reveals slurry, and external corner is not straight, smooth, and the template processed complex can not guarantee processing quality; 3, all use wooden form, have high input, cost is very high, comprises material cost and cost of labor, and not environmental protection; 4, personnel drop into manyly, and construction quality is wayward, and template is heavy, and potential safety hazard is arranged during assembly unit aloft.
The utility model content
Be to solve the deficiencies in the prior art, the enclosure wall that the purpose of this utility model is to provide a kind of can simplify the assembly unit program, save cost, the accelerating construction progress plastic formwork that bears down on one.
For achieving the above object, the utility model is to realize by following technical scheme:
A kind of enclosure wall coping formwork, it is characterized in that comprising mold, wooden model and the lines that drip, described wooden model comprises respectively two bottom wooden models and two side wooden models, two bottom wooden model minute left and right sides levels are installed in the centre of two side wooden models, between the bottom of both sides wooden model and side wooden model, place respectively a mold, described two side wooden models are vertically placed, and by split bolt two side wooden models are fixed, bottom wooden model and mold are clipped in the middle, leave the gap that equates with the enclosure wall thickness of wall body between two bottom wooden models; At the seam crossing of mold and the bottom wooden model lines that fixedly drip.
Aforesaid enclosure wall coping formwork is characterized in that also being provided with the support wooden model for support side edge wooden model balance between two side wooden models.
Aforesaid enclosure wall coping formwork, it is characterized in that being respectively equipped with a veneer at the upside of described two bottom wooden models, one side of described veneer and mold splicing, opposite side stretches to the gap of leaving in the middle of two bottom wooden models, side is mutually concordant with bottom wooden model side, and the lines that drip are fixed on the seam crossing of veneer and mold.
Aforesaid enclosure wall coping formwork is characterized in that the described lines that drip are aluminum-alloy line.
The beneficial effects of the utility model are: the utility model adopts mold and wooden model composite assembly method, behind the on-the-spot composite assembly, concreting, at mold and wooden model edge joint position nail aluminum-alloy line, as dripping lines, guarantee that external corner, formwork edge joint place can not reveal slurry, running pulp after the form removal, external corner is straight and upright, light is round, the clear-water concrete impression is effective, and is good with clear water enclosure wall Total tune, guarantees Forming Quality; Speed of application is fast, personnel's less investment, and the whole object of construction production of transformer station is saved more than 20 cube of wooden form, saves artificial over one hundred people worker, saves the duration 30%; Simultaneously mold can be reclaimed the secondary utilization, again processing, environmental protection and energy saving.
Description of drawings
Fig. 1 is the structural representation of enclosure wall coping formwork of the present utility model.
The mark implication is as follows among the figure:
1, enclosure wall body of wall; 2, split bolt; 3, mold; 4, bottom wooden model; 5, veneer; 6, the lines that drip; 7, side wooden model; 8, support wooden model.
The specific embodiment
Below in conjunction with specific embodiments and the drawings, the utility model is done concrete description.
Fig. 1 is the structural representation of enclosure wall coping formwork of the present utility model.As shown in the figure, enclosure wall coping formwork of the present utility model, comprise mold 3, wooden model and the lines 6 that drip, wooden model comprises respectively two bottom wooden models 4 and two side wooden models 7,5 minutes left and right sides levels of two bottom wooden models are installed in the centre of two side wooden models 7, between the bottom of both sides wooden model 4 and side wooden model 7, place respectively a mold 3, two side wooden models 7 are vertically placed, and by split bolt 2 that two side wooden models 7 are fixing, bottom wooden model 4 and mold 3 are clipped in the middle, between two bottom wooden models 4, leave the gap that equates with enclosure wall body of wall 1 thickness; At the seam crossing of mold 3 and bottom wooden model 4 lines 6 that fixedly drip.
Because split bolt 2 is positioned at the centre of side wooden model 7, bottom wooden model 4 and mold 3 are normally at a side of split bolt 2, are the maintenance balance of side wooden model 7, also are provided with the support wooden model 8 for support side edge wooden model 7 balances between two side wooden models 7.
Lines place external corner can not reveal slurry, running pulp in order to ensure dripping, external corner is straight and upright, light is round, the clear-water concrete impression is effective, upside at two bottom wooden models 4 is respectively equipped with a veneer 5, one side of veneer 5 and mold 3 splicings, opposite side stretches to the gap of leaving in the middle of two bottom wooden models 4, and side is mutually concordant with bottom wooden model 4 sides, and the lines 6 that drip are fixed on the seam crossing of veneer 5 and mold 3.The concrete of lines 6 inboards of can guaranteeing like this to drip is smooth, impression is effective.The lines 6 that drip can adopt aluminum-alloy line etc.
Adopt job practices of the present utility model to be:
1, designs and manufactures mold by mould producer;
2, on-site consolidation combination, mold is all used to the lines that drip in the outside, and wooden model is adopted in the bottom;
3, eject the enclosure wall floor level position of bearing down on one at the enclosure wall body of wall, and press the spacing installation split bolt of 1200mm;
4, the wooden model of enclosure wall body of wall both sides is installed, and wooden model is installed veneer in the bottom, and one side of veneer engages with mold, and another side stretches to the intermediate gaps position, and side is concordant with the side of bottom wooden model.The upside of veneer is concordant with the mold corner;
5, the mold of both sides is installed;
6, follow closely the lines that fixedly drip at wooden model;
7, adjust wooden model and mold, tighten split bolt, wall-crossing opposite-drawing bolt must be fastening firm, firmly proper, prevents from becoming flexible causing the mould that rises, and must not make template surface produce local distortion
8, Field Force's concreting on request, it is real to receive optical pressure.
The utility model adopts mold and wooden model composite assembly method, behind the on-the-spot composite assembly, concreting, at mold and wooden model edge joint position nail aluminum-alloy line, as dripping lines, guarantee that external corner, formwork edge joint place can not reveal slurry, running pulp after the form removal, external corner is straight and upright, light is round, the clear-water concrete impression is effective, and is good with clear water enclosure wall Total tune, guarantees Forming Quality; Speed of application is fast, personnel's less investment, and the whole object of construction production of transformer station is saved more than 20 cube of wooden form, saves artificial over one hundred people worker, saves the duration 30%; Simultaneously mold can be reclaimed the secondary utilization, again processing, environmental protection and energy saving.
Above-described embodiment does not limit the utility model in any form, and all employings are equal to replaces or technical scheme that the mode of equivalent transformation obtains, all drops in the protection domain of the present utility model.

Claims (4)

1. enclosure wall coping formwork, it is characterized in that comprising mold, wooden model and the lines that drip, described wooden model comprises respectively two bottom wooden models and two side wooden models, two bottom wooden model minute left and right sides levels are installed in the centre of two side wooden models, between the bottom of both sides wooden model and side wooden model, place respectively a mold, described two side wooden models are vertically placed, and by split bolt two side wooden models are fixed, bottom wooden model and mold are clipped in the middle, leave the gap that equates with the enclosure wall thickness of wall body between two bottom wooden models; At the seam crossing of mold and the bottom wooden model lines that fixedly drip.
2. enclosure wall coping formwork according to claim 1 is characterized in that also being provided with the support wooden model for support side edge wooden model balance between two side wooden models.
3. enclosure wall coping formwork according to claim 2, it is characterized in that being respectively equipped with a veneer at the upside of described two bottom wooden models, one side of described veneer and mold splicing, opposite side stretches to the gap of leaving in the middle of two bottom wooden models, side is mutually concordant with bottom wooden model side, and the lines that drip are fixed on the seam crossing of veneer and mold.
4. enclosure wall coping formwork according to claim 1 is characterized in that the described lines that drip are aluminum-alloy line.
CN201220223856.1U 2012-05-18 2012-05-18 Coping mold board for enclosure wall Expired - Fee Related CN202706530U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201220223856.1U CN202706530U (en) 2012-05-18 2012-05-18 Coping mold board for enclosure wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201220223856.1U CN202706530U (en) 2012-05-18 2012-05-18 Coping mold board for enclosure wall

Publications (1)

Publication Number Publication Date
CN202706530U true CN202706530U (en) 2013-01-30

Family

ID=47586847

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201220223856.1U Expired - Fee Related CN202706530U (en) 2012-05-18 2012-05-18 Coping mold board for enclosure wall

Country Status (1)

Country Link
CN (1) CN202706530U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437548A (en) * 2013-08-09 2013-12-11 国网山东省电力公司日照供电公司 Mold for formation of wall crown above wall body
CN105350770A (en) * 2015-10-27 2016-02-24 国家电网公司 Construction tool for manufacturing enclosing wall coping
CN106193585A (en) * 2016-07-20 2016-12-07 国网山东省电力公司经济技术研究院 A kind of enclosure of concrete bears down on one steel form

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437548A (en) * 2013-08-09 2013-12-11 国网山东省电力公司日照供电公司 Mold for formation of wall crown above wall body
CN103437548B (en) * 2013-08-09 2016-06-08 国家电网公司 Mold for formation of wall crown above wall body
CN105350770A (en) * 2015-10-27 2016-02-24 国家电网公司 Construction tool for manufacturing enclosing wall coping
CN106193585A (en) * 2016-07-20 2016-12-07 国网山东省电力公司经济技术研究院 A kind of enclosure of concrete bears down on one steel form
CN106193585B (en) * 2016-07-20 2018-07-03 国网山东省电力公司经济技术研究院 A kind of enclosure of concrete bears down on one steel form

Similar Documents

Publication Publication Date Title
CN202706530U (en) Coping mold board for enclosure wall
CN201896419U (en) Decorative heat-preservation composite plate
CN202866251U (en) Double-deck concrete ventilating ducts
CN204209803U (en) A kind of prefabricated box girder inner formwork aluminum alloy mould plate
CN204221939U (en) A kind of precast concrete cable channel cover plate mold system
CN201627363U (en) Steel framed formwork inside-corner mold structure
CN211817288U (en) Tenon matching structure for preventing slurry leakage of joint of laminated slab
CN203499074U (en) Glass curtain wall facilitating replacement of glass panels
CN210976847U (en) Assembled antique artistic enclosure wall
CN110409507B (en) Construction method of post-cast strip of top plate of underground garage
CN207211517U (en) It is a kind of to be provided with pre-buried electric partition plate
CN204645615U (en) Top board rubber watertight strip fixed mould
CN102873751B (en) Method for manufacturing exhaust passage
CN202831616U (en) Structural support protective cap standardized steel template
CN205725588U (en) A kind of clump crane span structure fixed structure
CN207240446U (en) The sash that a kind of assembled concrete structure detachably reuses fixes hole tool
CN202272818U (en) Plaster die for producing quartz crucibles
CN215549557U (en) A leak protection thick liquid PC component for template
CN202922728U (en) Steel template anti-corrosion structure for precast concrete component
CN204804322U (en) Board construction equipment falls in instrument formula building
CN212200379U (en) Mutually-spliced trackside signal equipment ground hardening
CN202031321U (en) Coping formwork for concrete cable trench
CN202029220U (en) Mould for concrete protective cover of substation truss
CN201771174U (en) Integral fair-faced concrete irregularly-shaped component mold plate
CN203669352U (en) Steel molding plate capable of adjusting chamfer height

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130130

Termination date: 20140518