CN202705906U - 纵向移梁滑道托辊装置 - Google Patents
纵向移梁滑道托辊装置 Download PDFInfo
- Publication number
- CN202705906U CN202705906U CN 201220269119 CN201220269119U CN202705906U CN 202705906 U CN202705906 U CN 202705906U CN 201220269119 CN201220269119 CN 201220269119 CN 201220269119 U CN201220269119 U CN 201220269119U CN 202705906 U CN202705906 U CN 202705906U
- Authority
- CN
- China
- Prior art keywords
- carrier roller
- sliding way
- roller box
- box frame
- type frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本实用新型公开了一种纵向移梁滑道托辊装置,解决了现有移梁滑道移梁力量不好控制掌握,容易使梁倾到造成事故。包括在滑道混凝土基座内设置的预埋钢板(8),在滑道混凝土基座上设置有托辊箱形框架固定底板(7),托辊箱形框架固定底板(7)通过固定螺栓(9)与预埋钢板(8)固定连接在一起,其特征在于,在托辊箱形框架固定底板(7)上固定设置有托辊箱形框架(2),在托辊箱形框架(2)上固定设置有滚轮轴(3),在滚轮轴(3)上活动设置有滚轮(4),在托辊箱形框架(2)上设置有防脱挡板(1)。特别适合需要转场的梁场使用。
Description
技术领域
本实用新型涉及一种对混凝土简支T梁进行移梁作业时纵向移梁滑道上所使用的托辊装置。
背景技术
在承担铁路通道建设任务时,一般是先在铁路通道建设线上进行桥墩及路基的建设,然后用架桥机将预制好的后张法预应力梁架设在已做好的桥墩上。后张法预应力梁一般是在制梁场预制完成的,预制过程主要包括制梁和移梁两个过程,在制梁台座上先预制好梁,然后将制好的梁移梁到存梁工位。现有技术的移梁是将梁放在滑板和枕木上,滑板再放在移梁轨道上进行移梁的,在移梁前需要对轨道上抛撒润滑粉,费时费力,同时移梁力量不好控制掌握,容易使梁倾到造成事故。
发明内容
本实用新型提供了一种纵向移梁滑道托辊装置,解决了现有技术的移梁滑道移梁力量不好控制掌握,容易使梁倾到造成事故的问题。
本实用新型是通过以下方案解决以上问题的:
一种纵向移梁滑道托辊装置,包括在滑道混凝土基座内设置的预埋钢板,在滑道混凝土基座上设置有托辊箱形框架固定底板,托辊箱形框架固定底板通过固定螺栓与预埋钢板固定连接在一起,在托辊箱形框架固定底板上固定设置有托辊箱形框架,在托辊箱形框架上固定设置有滚轮轴,在滚轮轴上活动设置有滚轮,在托辊箱形框架上设置有防脱挡板。
在滚轮与托辊箱形框架的侧板内侧之间的滚轮轴上设置有磨擦挡圈,在托辊箱形框架的侧板外侧的滚轮轴上设置有弹性挡圈。
本实用新型结构简单,操作方便,安装拆卸容易,特别适合梁场转场使用。
附图说明
图1是本实用新型主视方向的结构示意图;
图2是本实用新型俯视方向的结构示意图;
图3是本实用新型左视方向的结构示意图。
具体实施方式
一种纵向移梁滑道托辊装置,包括在滑道混凝土基座内设置的预埋钢板8,在滑道混凝土基座上设置有托辊箱形框架固定底板7,托辊箱形框架固定底板7通过固定螺栓9与预埋钢板8固定连接在一起,当梁场转场时,只需将固定螺栓9松开,即可将在托辊装置拆卸下,到新梁场进行重新安装。托辊箱形框架固定底板7上固定设置有托辊箱形框架2,在托辊箱形框架2上固定设置有滚轮轴3,在滚轮轴3上活动设置有滚轮4,在托辊箱形框架2上设置有防脱挡板1。制梁台座底托着梁体,在滚轮4上滑动移梁,达到了平稳掌控滑动速度和避免发生事故的目的。
在滚轮4与托辊箱形框架2的侧板内侧之间的滚轮轴3上设置有磨擦挡圈6,在托辊箱形框架2的侧板外侧的滚轮轴3上设置有弹性挡圈5。从而实现了保护滚轮减少磨损的效果。
Claims (2)
1.一种纵向移梁滑道托辊装置,包括在滑道混凝土基座内设置的预埋钢板(8),在滑道混凝土基座上设置有托辊箱形框架固定底板(7),托辊箱形框架固定底板(7)通过固定螺栓(9)与预埋钢板(8)固定连接在一起,其特征在于,在托辊箱形框架固定底板(7)上固定设置有托辊箱形框架(2),在托辊箱形框架(2)上固定设置有滚轮轴(3),在滚轮轴(3)上活动设置有滚轮(4),在托辊箱形框架(2)上设置有防脱挡板(1)。
2.根据权利要求1所述的一种纵向移梁滑道托辊装置,其特征在于,在滚轮(4)与托辊箱形框架(2)的侧板内侧之间的滚轮轴(3)上设置有磨擦挡圈(6),在托辊箱形框架(2)的侧板外侧的滚轮轴(3)上设置有弹性挡圈(5)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220269119 CN202705906U (zh) | 2012-06-08 | 2012-06-08 | 纵向移梁滑道托辊装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220269119 CN202705906U (zh) | 2012-06-08 | 2012-06-08 | 纵向移梁滑道托辊装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202705906U true CN202705906U (zh) | 2013-01-30 |
Family
ID=47586224
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220269119 Expired - Lifetime CN202705906U (zh) | 2012-06-08 | 2012-06-08 | 纵向移梁滑道托辊装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202705906U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106758850A (zh) * | 2017-01-26 | 2017-05-31 | 中国人民解放军国防科学技术大学 | 横梁安装的可拆卸式公路钢桥搬运架设车 |
CN107336346A (zh) * | 2017-07-21 | 2017-11-10 | 中铁十局集团第三工程有限公司 | 一种制梁台座 |
-
2012
- 2012-06-08 CN CN 201220269119 patent/CN202705906U/zh not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106758850A (zh) * | 2017-01-26 | 2017-05-31 | 中国人民解放军国防科学技术大学 | 横梁安装的可拆卸式公路钢桥搬运架设车 |
CN107336346A (zh) * | 2017-07-21 | 2017-11-10 | 中铁十局集团第三工程有限公司 | 一种制梁台座 |
CN107336346B (zh) * | 2017-07-21 | 2023-09-12 | 中铁十一局集团第三工程有限公司 | 一种制梁台座 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204640450U (zh) | 一种组合式预制箱梁整体移动模板 | |
CN202214002U (zh) | 轮对横向摆渡车 | |
CN104259447B (zh) | T梁移模装置及其使用方法 | |
CN102650118B (zh) | 滑移法架设预制梁的施工装置及方法 | |
CN201544334U (zh) | 无砟轨道板模具 | |
CN104179090B (zh) | 一种地铁铺轨系统 | |
CN103046933A (zh) | 一种盾构过站掘进与车站平行施工方法 | |
CN104727229B (zh) | 适用于大型混凝土预制构件的活动底模台车系统及预制大型混凝土构件底板的方法 | |
CN204097881U (zh) | 一种底模台车 | |
CN202705906U (zh) | 纵向移梁滑道托辊装置 | |
CN209381053U (zh) | 建筑物混凝土墙板预制构件生产线用台模车摆渡系统 | |
CN103161471A (zh) | 大直径盾构长距离穿越风井推进施工方法 | |
CN105171911A (zh) | 一种底模台车 | |
CN104164837A (zh) | 大型箱体梁可自动定位连续顶推装置 | |
CN204148495U (zh) | T梁移模装置 | |
CN201634223U (zh) | 一种入釜摆渡车 | |
CN204608611U (zh) | 适用于大型混凝土预制构件的活动底模台车系统 | |
CN103243620A (zh) | 现代有轨电车整体道床混凝土浇筑用移动溜槽的使用方法 | |
CN202099878U (zh) | 磁悬浮工程疏散平台预埋件 | |
CN204919358U (zh) | 一种架桥机横移导向结构 | |
CN201512364U (zh) | 用于铺装无砟轨道的可伸缩式起重门吊 | |
CN203238506U (zh) | 现代有轨电车槽型钢轨轨道铺设用移动运输小车 | |
CN204023325U (zh) | 一种地铁铺轨系统 | |
CN210948674U (zh) | 一种用于管廊施工中盾构空推过成型暗挖隧道的辅助系统 | |
CN208497288U (zh) | 一种混凝土轨道直梁浇筑模联动开模机构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20130130 |
|
CX01 | Expiry of patent term |