CN202689613U - 火力发电厂gis配电装置区与循环水泵房联合布置形式 - Google Patents
火力发电厂gis配电装置区与循环水泵房联合布置形式 Download PDFInfo
- Publication number
- CN202689613U CN202689613U CN 201220316588 CN201220316588U CN202689613U CN 202689613 U CN202689613 U CN 202689613U CN 201220316588 CN201220316588 CN 201220316588 CN 201220316588 U CN201220316588 U CN 201220316588U CN 202689613 U CN202689613 U CN 202689613U
- Authority
- CN
- China
- Prior art keywords
- power distribution
- gis
- distribution device
- circulating water
- water pump
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本实用新型公开了一种火力发电厂GIS配电装置区与循环水泵房联合布置形式,火力发电厂包括冷却塔区、GIS配电装置区、主厂房、煤场以及附属建筑物,所述冷却塔区与主厂房、煤场依次并列布置,主厂房与附属建筑物平行布置,冷却塔区中的循环水泵房设置为两层建筑,所述GIS配电装置区布置在循环水泵房的上层建筑中。本实用新型能够有效解决主厂房A列外主变压器与GIS配电装置区中升压站之间的出线困难问题,节约了占地,降低了建设成本,优化了火力发电厂的总平面布置。
Description
技术领域
本实用新型涉及一种火力发电厂中各厂房的布置形式,特别是一种GIS配电装置区与循环水泵房的联合布置形式。
背景技术
常规火力发电厂总平面布置分为三列式、四列式两种布置型式。三列式布置方式为配电装置区-主厂房-煤场并列布置型式,冷却塔区和配电装置区平行布置,冷却塔区包括两台机组冷却塔以及设置在两台机组冷却塔之间的循环水泵房。此种布置方式优点为配电装置区布置在主厂房A列外主变压器的正前方,变压器高压侧出线较顺畅,基本不需要转角架构或转角塔;但是此种布置方式冷却塔区与主厂房间的循环水管线较长,增加了循环水管线的建设成本。四列式布置型式为配电装置区-冷却塔区-主厂房-煤场并列布置型式。此种布置方式,由于配电装置区的升压站和主厂房A列外的主变压器之间布置有冷却塔区,因此出线较为困难;但此种布置型式循环水管线较短,减少了循环水管线的投资。一般情况下,总图专业根据火力发电厂的占地,综合全厂考虑,选择最优的布置型式。
在火力发电厂总平面布置采用四列式布置时,常规的GIS配电装置区布置分为屋外布置和屋内布置。但是无论是屋外布置还是屋内布置,GIS配电装置区均布置在厂区的地面上,因此GIS配电装置区需要占用总厂区一定面积的场地,增加了厂区的用地指标。而且主厂房A列外一般需要两台机主变压器和一台启动备用变压器共三回高压线路穿越两冷却塔之间的循环水泵房,因此必然大大增加杆塔数量和出线走廊。
实用新型内容
本实用新型需要解决的技术问题是提供一种火力发电厂GIS配电装置与循环水泵房联合布置形式,能够有效解决火力发电厂总平面布置在采用四列式布置时存在的主变压器出线问题,提高供电可靠性和安全性,降低建设成本。
为解决上述技术问题,本实用新型所采用的技术方案如下。
火力发电厂GIS配电装置与循环水泵房联合布置形式,火力发电厂包括冷却塔区、GIS配电装置区、主厂房、煤场以及附属建筑物,所述冷却塔区与主厂房、煤场依次并列布置,主厂房与附属建筑物平行布置,所述冷却塔区中的循环水泵房设置为两层建筑, GIS配电装置区布置在循环水泵房的上层建筑中。
由于采用了上述技术方案,本实用新型取得的技术进步如下。
本实用新型应用于火力发电厂布置时,兼具了火力发电厂三列式布置和四列式布置的优点,能够有效解决主厂房A列外主变压器与GIS配电装置区之间的出线困难问题,节约了占地,降低了建设成本,优化了火力发电厂的总平面布置。采用此种布置形式,主厂房内的主变压器和启动备用变压器的高压侧出线避免了采用跨越两台机组冷却塔中间的循环水泵房的布置形式,基本不需要转角架构或转角塔,并且循环水管线也可以直接接入主厂房,大大缩短了循环水管线的长度,提高了循环水泵房内设备和人员的安全。
附图说明
图1是本实用新型布置形式的俯视示意图。
图2为循环水泵房与GIS配电装置区布置的侧视图。
其中,1. 冷却塔区,2. GIS配电装置区,3.主厂房,4. 煤场,5. 附属建筑物。
具体实施方式
下面结合附图和具体实施例对本实用新型做进一步详细说明。
一种火力发电厂GIS配电装置区与循环水泵房联合布置形式,其布置形式如图1所示。火力发电厂包括冷却塔区、GIS配电装置区、主厂房、煤场以及附属建筑物,冷却塔区与主厂房、煤场依次并列布置,主厂房与附属建筑物平行布置,冷却塔区中的循环水泵房设置为两层建筑,GIS配电装置区布置在循环水泵房的上层建筑中。
本实施例采用了GIS配电装置区高位布置的形式,使GIS配电装置区与地面的标高达到10m,GIS配电装置区中电气出线的挂线点标高为20m,出线终端钢管塔的下中上相挂线点标高分别为18m、24.3m和31m,如图2所示。因此GIS配电装置区的出线基本和出线终端塔持平,更有利于电气出线连接至终端钢管塔。
Claims (1)
1.火力发电厂GIS配电装置区与循环水泵房联合布置形式,火力发电厂包括冷却塔区、GIS配电装置区、主厂房、煤场以及附属建筑物,所述冷却塔区与主厂房、煤场依次并列布置,主厂房与附属建筑物平行布置,其特征在于:所述冷却塔区中的循环水泵房设置为两层建筑, GIS配电装置区布置在循环水泵房的上层建筑中。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220316588 CN202689613U (zh) | 2012-07-03 | 2012-07-03 | 火力发电厂gis配电装置区与循环水泵房联合布置形式 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220316588 CN202689613U (zh) | 2012-07-03 | 2012-07-03 | 火力发电厂gis配电装置区与循环水泵房联合布置形式 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202689613U true CN202689613U (zh) | 2013-01-23 |
Family
ID=47545248
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220316588 Expired - Lifetime CN202689613U (zh) | 2012-07-03 | 2012-07-03 | 火力发电厂gis配电装置区与循环水泵房联合布置形式 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202689613U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103669919A (zh) * | 2013-11-30 | 2014-03-26 | 浙江省电力设计院 | 一种燃机电厂循环水泵房的布置结构 |
CN103746298A (zh) * | 2013-12-31 | 2014-04-23 | 浙江省电力设计院 | 一种发电厂a列外电气设备的复式布置方法 |
CN104695741A (zh) * | 2015-03-18 | 2015-06-10 | 中国能源建设集团湖南省电力设计院有限公司 | 一种山区风电场升压站“t”字型结构及布置方法 |
-
2012
- 2012-07-03 CN CN 201220316588 patent/CN202689613U/zh not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103669919A (zh) * | 2013-11-30 | 2014-03-26 | 浙江省电力设计院 | 一种燃机电厂循环水泵房的布置结构 |
CN103746298A (zh) * | 2013-12-31 | 2014-04-23 | 浙江省电力设计院 | 一种发电厂a列外电气设备的复式布置方法 |
CN104695741A (zh) * | 2015-03-18 | 2015-06-10 | 中国能源建设集团湖南省电力设计院有限公司 | 一种山区风电场升压站“t”字型结构及布置方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204126320U (zh) | 分列模块式海上升压站 | |
CN202689613U (zh) | 火力发电厂gis配电装置区与循环水泵房联合布置形式 | |
CN204858287U (zh) | 220kV GIS三层梁出线结构 | |
CN204045951U (zh) | 一种220kV配电装置的布置结构 | |
CN207896524U (zh) | 一种500kv全户内变电站以及综合楼 | |
CN204490355U (zh) | 紧凑型垂直吊装装置 | |
CN202925950U (zh) | 火电厂主厂房和辅助建筑的集成厂房 | |
CN102306907A (zh) | 一种风电箱式变电站 | |
CN205377134U (zh) | 一种高压变电站的布置结构 | |
CN204103317U (zh) | 模块化变电站 | |
CN206034991U (zh) | 330kV风帆联合式三相垂直出线结构 | |
CN209375009U (zh) | 一种750kV GIS断路器双列式布置结构 | |
CN103346499B (zh) | 大型空冷火电机组空冷岛与高压配电装置的布置结构 | |
CN105261986A (zh) | 220kV变电站优化结构 | |
CN203312636U (zh) | 一种220千伏户外gis双飞蜓出线布置结构 | |
CN103746298B (zh) | 一种发电厂a列外电气设备的复式布置方法 | |
CN202550355U (zh) | 一种箱式变电站 | |
CN206401783U (zh) | 一种变电站结构及变电站 | |
CN205791186U (zh) | Gis配电装置端部出线结构 | |
CN203859429U (zh) | 一种立体布置的全地下升压站 | |
CN104141405A (zh) | 一种双回架空输电线路架空接线杆及其接线结构 | |
CN104868391A (zh) | 一种户外变电站 | |
CN204835327U (zh) | 110kV半敞开式集成变电站 | |
CN205016900U (zh) | 特高压直流换流站阀厅换流变压器l型分布结构 | |
CN204290149U (zh) | 一种高压气体绝缘金属封闭开关设备 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 050031 No. 6 Jianhua Street, Shijiazhuang City, Hebei Province Patentee after: POWERCHINA HEBEI ELECTRIC POWER ENGINEERING Co.,Ltd. Address before: 050031 No. 6 Jianhua Street, Shijiazhuang City, Hebei Province Patentee before: HEBEI ELECTRIC POWER DESIGN & Research Institute |
|
CP01 | Change in the name or title of a patent holder | ||
CX01 | Expiry of patent term |
Granted publication date: 20130123 |
|
CX01 | Expiry of patent term |