CN202687848U - Rope arranger for crane - Google Patents
Rope arranger for crane Download PDFInfo
- Publication number
- CN202687848U CN202687848U CN 201220297773 CN201220297773U CN202687848U CN 202687848 U CN202687848 U CN 202687848U CN 201220297773 CN201220297773 CN 201220297773 CN 201220297773 U CN201220297773 U CN 201220297773U CN 202687848 U CN202687848 U CN 202687848U
- Authority
- CN
- China
- Prior art keywords
- rope
- wheel
- steel wire
- support seat
- wire rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model discloses a rope arranger for a crane. The rope arranger comprises a left support seat and a right support seat, wherein the left support seat and the right support seat are connected by an I-shaped beam, in addition, an arranging layer wheel is arranged between the left support seat and the right support seat and is linked with a driving device through a transmission assembly, and a steel wire rope sequentially passes through a rope arranging pulley, a guide wheel and a layer arranging wheel to be wound onto a winding drum. The rope arranger for the crane has the advantages that when a steel wire rope is collected, after the steel wire rope is wound for a circle, the layer arranging wheel moves in the horizontal direction, so the steel wire rope is in single-layer arrangement on the winding drum, a good protection effect is realized on the steel wire rope, the service life of the steel wire rope is prolonged, in addition, the cost is saved, and the operation is safe and reliable.
Description
Technical field
The utility model relates to a kind of hoisting crane, relates in particular to a kind of rope winding jib for hoisting crane.
Background technology
At present; hoisting crane adopts steel rope that goods is promoted or shifts more; therefore all be useful on the reel of collecting steel rope on nearly all hoisting crane; traditional hoisting crane is when wire rope roll is on the reel; arrange irregular; possible some place is wound multilayer; then do not reel in some place; will certainly or put in the rope process at serving like this; the steel rope that is wound the place of multilayer steel rope produces very large friction force; more can bear because of steel rope the weight of goods; the steel rope on upper strata pushes the steel rope of its lower floor, and steel rope will be out of shape in the course of time, has larger potential safety hazard; and finally causing steel rope to use, productive costs is corresponding to be increased.
The utility model content
The purpose of this utility model is to provide a kind of rope winding jib for hoisting crane; it can be distributed in the steel rope individual layer on the reel; steel rope is played a very good protection; has the service life that prolongs steel rope; productive costs and reliable stable characteristics have been reduced, to solve the problem that hoisting crane exists in the prior art.
For reaching this purpose, the utility model by the following technical solutions:
A kind of rope winding jib for hoisting crane, it comprises left and right bearing, connected by H-girder between the described left and right bearing, and the row's of installation layer wheel between the described left and right bearing, described row's layer wheel is by transmission component and actuating device interlock, and the steel rope successively row's of passing rope pulley, track adjusting wheel and row's layer wheel is wound on the reel.
Especially, described actuating device is reductor.
Especially, described transmission component comprises the universal coupling that is connected with the output shaft of reductor, is arranged at left and right sprocket wheel and driving chain on the left and right bearing, and described universal coupling connects left sprocket wheel, and described driving chain connects left and right sprocket wheel.
Especially, be provided with horizontal seat and vertical bearing on the described H-girder.
The beneficial effects of the utility model are, compared with prior art described rope winding jib for hoisting crane is when the steel rope rope closing, after walking around a circle, row's layer wheel moves in the horizontal direction, thereby making steel rope carry out individual layer at reel arranges, not only steel rope is played a very good protection, improved the service life of steel rope; And saved cost, safe and reliable to operation.
Description of drawings
Fig. 1 is the rope winding jib lateral plan that is used for hoisting crane that the utility model specific embodiment 1 provides;
Fig. 2 is the rope winding jib birds-eye view that is used for hoisting crane that the utility model specific embodiment 1 provides;
Fig. 3 is the wirerope-winding schematic diagram of the rope winding jib that is used for hoisting crane that provides of the utility model specific embodiment 1.
The specific embodiment
Further specify the technical solution of the utility model below in conjunction with accompanying drawing and by the specific embodiment.
See also Fig. 1 and shown in Figure 3, in the present embodiment, a kind of rope winding jib for hoisting crane comprises left support abutment 1 and right support abutment 2, is connected by H-girder 3 between described left support abutment 1 and the right support abutment 2, is provided with horizontal seat 11 and vertical bearing 10 on the described H-girder 3.And the row's of installation layer wheel 4 between described left support abutment 1 and the right support abutment 2, described row's layer wheel 4 is by transmission component and reductor 5 interlocks, described transmission component comprises the universal coupling 6 that is connected with the output shaft of reductor 5, is arranged at left sprocket wheel 7 and right sprocket wheel 8 on left support abutment 1 and the right support abutment 2, described universal coupling 6 connects left sprocket wheel 7, connection for transmission chain 9 between described left sprocket wheel 7 and the right sprocket wheel 8, the steel rope 12 successively row's of passing rope pulley 13, track adjusting wheel 14 and row's layer wheel 4 are wound on the reel 15.
During work, when reel 15 rotates rope closing, whenever steel rope 12 on the reel 15 behind the circle, there is reductor 5 to drive left sprocket wheel 7 and 8 rotations of right sprocket wheel by universal coupling 6, thereby the row's of drive layer wheel 4 moves in the horizontal direction under the effect of driving chain 9, the movement of row's layer wheel 4, also just drive in the horizontal direction mobile position of steel rope 12, thereby making steel rope 12 carry out individual layer at reel 15 arranges, both steel rope was played a very good protection, improved the service life of steel rope; Saved again cost, safe and reliable to operation.
Above embodiment has just set forth groundwork of the present utility model and characteristic; the utility model is not limited by above-mentioned example; under the prerequisite that does not break away from the utility model spirit and scope; the utility model also has various variations and change, and these variations and change all fall in claimed the utility model scope.The claimed scope of the utility model is defined by appending claims and equivalent thereof.
Claims (4)
1. rope winding jib that is used for hoisting crane, it is characterized in that, comprise left and right bearing, connected by H-girder between the described left and right bearing, and the row's of installation layer wheel between the described left and right bearing, described row's layer wheel is by transmission component and actuating device interlock, and the steel rope successively row's of passing rope pulley, track adjusting wheel and row's layer wheel is wound on the reel.
2. the rope winding jib for hoisting crane according to claim 1 is characterized in that, described actuating device is reductor.
3. the rope winding jib for hoisting crane according to claim 2, it is characterized in that, described transmission component comprises the universal coupling that is connected with the output shaft of reductor, is arranged at left and right sprocket wheel and driving chain on the left and right bearing, described universal coupling connects left sprocket wheel, and described driving chain connects left and right sprocket wheel.
4. the rope winding jib for hoisting crane according to claim 1 is characterized in that, is provided with horizontal seat and vertical bearing on the described H-girder.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220297773 CN202687848U (en) | 2012-06-21 | 2012-06-21 | Rope arranger for crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220297773 CN202687848U (en) | 2012-06-21 | 2012-06-21 | Rope arranger for crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202687848U true CN202687848U (en) | 2013-01-23 |
Family
ID=47543496
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220297773 Expired - Fee Related CN202687848U (en) | 2012-06-21 | 2012-06-21 | Rope arranger for crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202687848U (en) |
-
2012
- 2012-06-21 CN CN 201220297773 patent/CN202687848U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205709636U (en) | Loop wheel machine winch | |
CN105337218B (en) | A kind of transmission line of electricity lowering or hoisting gear | |
CN101817448A (en) | Double-rail suspension type conveying device | |
CN201962998U (en) | Transversely-lifting transmission device | |
CN201214610Y (en) | Hoist arrange rope device | |
CN203716562U (en) | Parking garage elevator | |
CN201183702Y (en) | Novel silo hoisting device using movable pulley | |
CN202687848U (en) | Rope arranger for crane | |
CN108252552A (en) | Intelligent three-dimensional parking apparatus and stop pick-up method | |
CN207330157U (en) | A kind of gravity type cable drum | |
CN206299179U (en) | Intelligent three-dimensional parking apparatus | |
CN207453583U (en) | A kind of novel elevating system | |
CN201678264U (en) | Double-track suspended conveying device | |
CN102730588A (en) | Rope guider for crane | |
CN202429936U (en) | High-strength electric hoist | |
CN205222549U (en) | Upper and lower hoist mechanism | |
CN202148473U (en) | Dragging machine special for railway | |
CN204185142U (en) | Tower crane trolley luffing assembly pulley protection device about rope jumping | |
CN202757850U (en) | Miniature steel wire rope fatigue testing machine | |
CN201914876U (en) | Heavy-duty steel wire rope winding drum | |
CN205990220U (en) | A kind of Two-wheeled steel-wire rope traction mechanism | |
CN205312957U (en) | Novel hoisting mechanism of hoist | |
CN201351089Y (en) | Interference preventer for luffing wire rope and hoist rope | |
CN205023758U (en) | Modified is small -size decides pillar jib crane | |
CN104340899A (en) | Manual gear type column switch hoisting device and application thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130123 Termination date: 20160621 |
|
CF01 | Termination of patent right due to non-payment of annual fee |