Pipeline quick connecting structure Download PDFInfo
- Publication number
- CN202674649U CN202674649U CN 201220197311 CN201220197311U CN202674649U CN 202674649 U CN202674649 U CN 202674649U CN 201220197311 CN201220197311 CN 201220197311 CN 201220197311 U CN201220197311 U CN 201220197311U CN 202674649 U CN202674649 U CN 202674649U
- Authority
- CN
- China
- Prior art keywords
- connection structure
- connecting pipe
- locking cap
- fast connection
- banding cover
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The utility model belongs to the technical field of pipeline connecting, and particularly relates to a pipeline quick connecting structure which solves the problem of unreasonable design and other problems in the prior art. The pipeline quick connecting structure is arranged between a first connecting pipe and a second connecting pipe, wherein one end of the second connecting pipe is provided with a necking inserting pipe. The connecting structure comprises a clamping sleeve sleeved on the periphery of the fist connecting pipe, a fastening cap is sleeved on the periphery of the clamping sleeve, and the fastening cap can be connected with the second connecting pipe through a thread structure. The pipeline quick connecting structure is characterized in that a pushing structure is arranged between the fastening cap and the clamping sleeve, the pushing structure enables the clamping sleeve to be tightly clamped on the first connecting pipe after the fastening cap is connected with the second connecting pipe, and the fist connecting pipe is driven by the clamping sleeve to be sleeved on the necking inserting pipe of the second connecting pipe. Compared with the prior art, the pipeline quick connecting structure has the advantages of being reasonable in design, simple in structure, easy, convenient and quick to install, high in structural strength, firm in fixation, and long in service life.
Description
Technical field
The utility model belongs to the pipeline connection technology field, relates in particular to a kind of conduit fast connection structure.
Background technique
Conduit fast connection structure is a kind of joint that does not need instrument just can realize pipeline connection or disconnection.In the prior art, conduit fast connection structure generally comprises fittings body and nut, and the conduit fast connection structure of this structure easily makes shedding, and overall construction intensity is not high.
The problem that exists in order to solve prior art, people have carried out long-term exploration, have proposed various solutions.For example, Chinese patent literature discloses a kind of conduit fast connection structure [application number: 200820060571.4], be included in the outer side surface moulding outside thread of a tubular body, one collar inner side surface moulding internal thread, the collar when making the relative body rotation of the collar, can make the axial displacement of cover hoop body with the external thread spiro fastening of internal thread and body, in the time of in water pipe is inserted in body, can be got loose to the location of water pipe by the axial displacement of the collar.
Such scheme has improved prior art to a certain extent, but at least also has following problem: complex structure, install loaded down with trivial detailsly, and still exist in addition structural strength not high, the fixing problem such as not firm, after long-term the use, the problem such as will occur coming off and leak.
Summary of the invention
The purpose of this utility model is for the problems referred to above, provides a kind of reasonable in design, simple in structure, and simple installation is quick, and structural strength is high, and is fixed, the conduit fast connection structure of long service life.
For achieving the above object, the utility model has adopted following technical proposal: be arranged between the first adapter and the second adapter, described second takes over an end has the reducing intubate, this linkage structure comprises that being placed in first takes over peripheral banding cover, outer race at the banding cover has locking cap, described locking cap can be taken over by worm structure and second and link to each other, it is characterized in that, be provided with between described locking cap and the banding cover to take over when locking cap and second and can make after being connected the banding cover be held in first to take over upper and driven propelling movement structure on the reducing intubate that the first adapter is enclosed within the second adapter by the banding cover.
In above-mentioned conduit fast connection structure, described propelling movement structure comprises the inner conical surface of being located at the locking cap inwall and the male cone (strobilus masculinus) of being located at banding cover periphery, and described inner conical surface and male cone (strobilus masculinus) lean.
Owing to being provided with the propelling movement structure, it is by pushing structure that it is firmly fixing that the first pipeline passes locking cap, and Simple fast is installed, and improved simultaneously whole structural strength, fixed, prolonged working life.
In above-mentioned conduit fast connection structure, the cross section of described banding cover is the C type.More firm after the installation.
In above-mentioned conduit fast connection structure, described the first adapter is made by nonmetallic material, and described the second adapter is made by metallic material.
In above-mentioned conduit fast connection structure, described banding cover inwall is provided with snap ring in some back-offs.
In above-mentioned conduit fast connection structure, described reducing intubate is arranged with the outer snap ring of some back-offs outward.
Owing to being provided with snap ring and the outer snap ring of back-off in the back-off, install fixedly, further improved overall construction intensity.
Compared with prior art, the advantage of this conduit fast connection structure is: 1, design is more reasonable.2, owing to being provided with the propelling movement structure, it is by pushing structure that it is firmly fixing that the first pipeline passes locking cap, and Simple fast is installed, and improved simultaneously whole structural strength, fixed, prolonged working life.3, owing to being provided with snap ring and the outer snap ring of back-off in the back-off, install fixedly, further improved overall construction intensity.
Description of drawings
Fig. 1 is the broken section structural representation that the utility model provides.
Fig. 2 is the banding nested structure schematic diagram that the utility model provides.
Among the figure, first takes over snap ring 32 in the 1, second adapter 2, reducing intubate 21, banding cover 3, locking cap 4, inner conical surface 41, male cone (strobilus masculinus) 31, the back-off, the outer snap ring 21a of back-off.
Embodiment
The utility model is described in more detail below in conjunction with the drawings and specific embodiments.
Such as Fig. 1, shown in 2, this conduit fast connection structure, being arranged on first takes between the 1 and second adapter 2, take over 2 one ends second and have reducing intubate 21, this linkage structure comprises that being placed in the first banding of taking over 1 periphery overlaps 3, outer race at banding cover 3 has locking cap 4, described locking cap 4 can be taken over 2 by worm structure and second and link to each other, is provided with to take over 2 when locking cap 4 and second and can make after being connected banding cover 3 be held in first to take on 1 and overlapped 3 drives the first adapter 1 by banding and be enclosed within propelling movement structure on the reducing intubate 21 of the second adapter 2 between locking cap 4 and banding cover 3.Further, first takes over 1 is made by nonmetallic material, and second takes over 2 is made by metallic material.
Concrete, above-mentioned propelling movement structure comprises the inner conical surface 41 of being located at locking cap 4 inwalls and is located at the male cone (strobilus masculinus) 31 that banding overlaps 3 peripheries, and described inner conical surface 41 leans with male cone (strobilus masculinus) 31.
In the present embodiment, owing to being provided with the propelling movement structure, it is by pushing structure that it is firmly fixing that the first pipeline passes locking cap, and Simple fast is installed, and improved simultaneously whole structural strength, fixed, prolonged working life.
More particularly, overlap 3 inwalls at banding and be provided with snap ring 32 in some back-offs, outside reducing intubate 21, be arranged with snap ring 21a outside some back-offs; Further, as shown in Figure 2, the cross section of banding cover 3 is the C type.
Specific embodiment described herein only is to the explanation for example of the utility model spirit.The utility model person of ordinary skill in the field can make various modifications or replenishes or adopt similar mode to substitute described specific embodiment, but can't depart from spirit of the present utility model or surmount the defined scope of appended claims.
Although this paper has more used first to take over the terms such as snap ring 32, the outer snap ring 21a of back-off in the 1, second adapter 2, reducing intubate 21, banding cover 3, locking cap 4, inner conical surface 41, male cone (strobilus masculinus) 31, the back-off, do not get rid of the possibility of using other term.Using these terms only is in order to describe more easily and explain essence of the present utility model; They are construed to any additional restriction all is contrary with the utility model spirit.
Claims (6)
1. conduit fast connection structure, being arranged on first takes between (1) and the second adapter (2), described second takes over (2) one ends has reducing intubate (21), this linkage structure comprises that being placed in first takes over (1) peripheral banding cover (3), outer race at banding cover (3) has locking cap (4), described locking cap (4) can be taken over (2) by worm structure and second and link to each other, it is characterized in that, be provided with between described locking cap (4) and the banding cover (3) when locking cap (4) and second take over can make banding cover (3) be held in first after (2) are connected to take over (1) upper and driven first by banding cover (3) and take over (1) and be enclosed within propelling movement structure on the reducing intubate (21) of the second adapter (2).
2. conduit fast connection structure according to claim 1, it is characterized in that, described propelling movement structure comprises the inner conical surface (41) of being located at locking cap (4) inwall and is located at the peripheral male cone (strobilus masculinus) (31) of banding cover (3), and described inner conical surface (41) leans with male cone (strobilus masculinus) (31).
3. conduit fast connection structure according to claim 1 and 2 is characterized in that, the cross section of described banding cover (3) is the C type.
4. conduit fast connection structure according to claim 3 is characterized in that, described first takes over (1) is made by nonmetallic material, and described second takes over (2) is made by metallic material.
5. conduit fast connection structure according to claim 3 is characterized in that, described banding cover (3) inwall is provided with snap ring (32) in some back-offs.
6. conduit fast connection structure according to claim 3 is characterized in that, the outer outer snap ring (21a) of some back-offs that is arranged with of described reducing intubate (21).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220197311 CN202674649U (en) | 2012-05-04 | 2012-05-04 | Pipeline quick connecting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220197311 CN202674649U (en) | 2012-05-04 | 2012-05-04 | Pipeline quick connecting structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202674649U true CN202674649U (en) | 2013-01-16 |
Family
ID=47495555
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220197311 Expired - Fee Related CN202674649U (en) | 2012-05-04 | 2012-05-04 | Pipeline quick connecting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202674649U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108397619A (en) * | 2018-05-09 | 2018-08-14 | 郑州博容节能设备有限公司 | Anti-back silk interfering type pipeline opening interface assembly and its water knockout drum |
-
2012
- 2012-05-04 CN CN 201220197311 patent/CN202674649U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108397619A (en) * | 2018-05-09 | 2018-08-14 | 郑州博容节能设备有限公司 | Anti-back silk interfering type pipeline opening interface assembly and its water knockout drum |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202674649U (en) | Pipeline quick connecting structure | |
CN202444215U (en) | Composite cable pipe | |
CN203202474U (en) | Corrugation-clamping type end face seal pipe joint | |
CN201964062U (en) | Convenient and fast combined type gas pipe fitting | |
CN202521094U (en) | Clamping hoop | |
CN205578969U (en) | Flange for electric automobile | |
CN204208188U (en) | The mounting structure of flow sub | |
CN202195068U (en) | Valve with quick-connection structure | |
CN203223665U (en) | Novel stainless steel corrugated pipe | |
CN208634602U (en) | A kind of novel fast intubation attachment device | |
CN205902948U (en) | Pull rod of draw -bar box | |
CN206268349U (en) | A kind of damper being easily installed | |
CN206754665U (en) | A kind of closed type three-limb tube part | |
CN207178963U (en) | High pressure cotton thread electronic-controlled power steering noise-reducing hose assembly | |
CN207621527U (en) | A kind of water pipe head | |
CN201517680U (en) | Direct-buried corrugated compensator | |
CN205137071U (en) | Pressurizing outlet pipe | |
CN203771761U (en) | Elastic tube clamp for solar vacuum tube | |
CN205980390U (en) | Novel solar heat collector | |
CN205578968U (en) | Flange joint device for electric automobile | |
CN209943790U (en) | Connecting mechanism of PE pipe | |
CN202996439U (en) | Silicon rubber coated tightening insulator with thimble | |
CN203809917U (en) | Brass connector of refrigerating or heating device | |
CN107387914A (en) | A kind of well-set quick coupling | |
CN203052030U (en) | Pipeline connecting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130116 Termination date: 20160504 |
|