CN202673215U - Sand pump pipe string - Google Patents

Sand pump pipe string Download PDF

Info

Publication number
CN202673215U
CN202673215U CN 201220236247 CN201220236247U CN202673215U CN 202673215 U CN202673215 U CN 202673215U CN 201220236247 CN201220236247 CN 201220236247 CN 201220236247 U CN201220236247 U CN 201220236247U CN 202673215 U CN202673215 U CN 202673215U
Authority
CN
China
Prior art keywords
sand
sand bucket
pipe string
seat
loading cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220236247
Other languages
Chinese (zh)
Inventor
徐鸿翔
李英松
陈文科
付强
路振兴
边杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Oilfield Services Ltd
China National Offshore Oil Corp CNOOC
Original Assignee
China Oilfield Services Ltd
China National Offshore Oil Corp CNOOC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Oilfield Services Ltd, China National Offshore Oil Corp CNOOC filed Critical China Oilfield Services Ltd
Priority to CN 201220236247 priority Critical patent/CN202673215U/en
Application granted granted Critical
Publication of CN202673215U publication Critical patent/CN202673215U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a sand pump pipe string which overcomes the defect of frequent demounting of sand pumps of existing sand pump pipe strings. The sand pump pipe string comprises a sliding sleeve (2), an upper uniflow valve (3), a sand pump (4), a sand containing barrel (5) and a lower uniflow valve (6) in sequential connection. The sliding sleeve (2) comprises an opening and communicated with the outside through the opening. The upper uniflow valve (3) is off when pressure in the sand pump (4) and the sand containing barrel (5) is smaller than the external pressure and is on when the pressure in the sand pump (4) and the sand containing barrel (5) is larger than the external pressure. The sand containing barrel (5) serving as a counterweight comprises multiple oil pipes in connection. The sand pump pipe string is effective in sealing, long in service life and more reliable in use.

Description

A kind of sand bucket pipe string
Technical field
The utility model relates to the downhole petroleum instrument, relates in particular to a kind of sand bucket pipe string.
Background technology
At present, recover and the common method of keeping sand output well production is hydraulic sand washing.In the hydraulic sand washing process, often because the barrel blasting well bottom pressure, makes a large amount of sand cleaning fluids oil reservoir that bleeds greater than strata pressure, even partial product sand returns to oil reservoir, and oil reservoir is caused damage.In the oil-water well operation process, in debt and the oil-water well of severe leakage layer is arranged for the stratum, also there is the working fluid leakage phenomena during operation sand washing.This not only can injure the stratum, but also affects normally carrying out of workover treatment.
Existing sand bucket adopts cylindrical push rod, and when lower well operations was hampered, the unfreezing effect was bad.In the normal operation situation, very quick-wearing inefficacy of seal during the operation of continuous application sand bucket needs frequent dismounting sand bucket, changes seal, and operating cost is large, and duty cycle is long.In addition, utilize the sand washing of pump truck high flow rate washover, exist operating cost high, elapsed time is long, and working fluid returns the problems such as row's difficulty after the operation.And existing sand bucket pipe string exists in operation process that to drag for the sand amount few, plays lower tubular column often, and expense is high, drags for the sand effect undesirable, and success rate is lower, pipe string application life short and can't abolish sand grains cementing with the problem such as small falling object.
The utility model content
Technical problem to be solved in the utility model is to overcome the deficiency that present sand bucket pipe string needs frequent dismounting sand bucket.
In order to solve the problems of the technologies described above, the utility model provides a kind of sand bucket pipe string, comprises sliding sleeve (2), upper ball-and-seat (3), sand bucket (4), sand loading cylinder (5) and lower ball-and-seat (6) that order links to each other, wherein:
Sliding sleeve (2) includes opening, links by opening and outside; The pressure of upper ball-and-seat (3) in sand bucket (4) and sand loading cylinder (5) is closed during less than external pressure, opens during greater than external pressure; The pressure of lower ball-and-seat (6) in sand bucket (4) and sand loading cylinder (5) is closed during greater than external pressure, opens during less than external pressure; The sand loading cylinder (5) that serves as counterweight comprises the multiple-tubing string that is connected.
Preferably, sand loading cylinder (5) comprises six roots of sensation standard oil pipe.
Preferably, this sand bucket pipe string comprises,
Guide shoe (7) is connected to the two ends of lower ball-and-seat (6) with sand loading cylinder (5).
Preferably, sand bucket (4) comprises,
Stack shell (9) and be enclosed within the inner push rod (8) of stack shell (9), the endoporus of stack shell (9) is hexagonal cross-section, push rod (8) is the body of rod of hexagonal cross-section.
Preferably, in the sand bucket (4),
Be enclosed within on the piston (10) in the stack shell (9) wear ring (11) is installed.
Preferably, sliding sleeve (2) one ends connect upper ball-and-seat (3), other end connected pipes pipe nipple (1).
Compared with prior art, among the embodiment of the present utility model, sand bucket changes positive hexagonal prism push rod into by existing cylindrical push rod, so that sand bucket can transmitting torque, effectively abolishes cementing gravel.Embodiment of the present utility model has adopted the v-seal combination of novel high-quality, good sealing effect, and the life-span is long, uses more reliable.Embodiment of the present utility model can effectively abolish gravel when the sand bucket operation is hampered cementing, solves sand card problem, improves and drags for the sand success rate.
Description of drawings
Fig. 1 is the organigram of the sand bucket of the utility model embodiment.
Fig. 2 is the organigram of the sand bucket pipe string of the utility model embodiment.
The specific embodiment
For making the purpose of this utility model, technical scheme and advantage clearer, hereinafter in connection with accompanying drawing embodiment of the present utility model is elaborated.Need to prove, in the situation that do not conflict, the embodiment among the application and the feature among the embodiment be any combination mutually.
As shown in Figure 1, the sand bucket of the utility model embodiment mainly comprises push rod 8, stack shell 9, piston 10, wear ring 11 and V-seal spare 12 etc.Push rod 8 is enclosed within the inside of stack shell 9, and the endoporus of stack shell 9 is hexagonal cross-section, and push rod 8 is the body of rod of hexagonal cross-section.Push rod 8 and stack shell 9 cooperate can the effective communication moment of torsion.Be enclosed within on the piston 10 in the stack shell 9 wear ring 11 is installed, piston 10 is little with the frictional force of stack shell 9.
As shown in Figure 2, the sand bucket pipe string of the utility model embodiment mainly comprises sliding sleeve 2, upper ball-and-seat 3, sand bucket 4, sand loading cylinder 5, lower ball-and-seat 6 and the guide shoe 7 that order links to each other.
Sand loading cylinder 5 is mainly connected to form by multiple-tubing string, and for guaranteeing that sand bucket 4 naturally vertically being in the state of pulling open under the state, needs the sand loading cylinder to serve as counterweight, while oil pipe inner space is used for sand loading.It is large that the large capacity negative pressure sand bucket pipe string of the utility model embodiment drags for the sand amount, thereby sand loading cylinder 5 comprises six roots of sensation standard oil pipe and connects and make sand loading cylinder (among other embodiment, also can be the oil pipe of other quantity).
Sliding sleeve 2 includes opening, can be connected to pit shaft by this opening; The pressure of upper ball-and-seat 3 in sand bucket 4 and sand loading cylinder 5 is closed during less than external pressure, opens during greater than external pressure; The pressure of lower ball-and-seat 6 in sand bucket 4 and sand loading cylinder 5 is closed during greater than external pressure, opens during less than external pressure.Guide shoe 7 and sand loading cylinder 5 are connected to the two ends of lower ball-and-seat 6.Sliding sleeve 2 one ends connect upper ball-and-seat 3, other end connected pipes pipe nipple 1.
Embodiment of the present utility model installs wear ring 11 because the seal of sand bucket 4 has been selected on V-seal spare 12 and the piston 10 when entering well, piston 10 is little with the frictional force of stack shell 9.Sand bucket 4 is in extended state under the counterweight effect, continue to press down after entering sand bed.When the pipe string deepened continuously sand bed, sand bucket 4 shrank, and in the good situation of inner space sealing effectiveness, upper ball-and-seat 3 is opened, and the air in sand bucket 4 and the sand loading cylinder 5 is discharged to pit shaft from sliding sleeve 2, until sand bucket 4 all shrinks.
Cementing such as shaft bottom gravel, can turn to be rotated counterclockwise and manage string, because being hexagon, sand bucket push rod 8 and stack shell 9 endoporus cooperate, can the effective communication moment of torsion, drive guide shoe 7 rotations bottom of sand bucket pipe string, apply certain downforce, it is cementing that gravel will effectively be abolished in guide shoe 7 tips.
When taking out the sand operation, the upper lifting pipe string, because sand bucket part below 4 (also being sand loading cylinder 5, lower ball-and-seat 6 and guide shoe 7 etc.) counterweight is greater than the seal 12 in the sand bucket 4 and the frictional force between the stack shell 9, therefore sand bucket part below 4 keeps the former degree of depth motionless, sand bucket 4 is stretched out, itself and sand loading cylinder 5 inner confined spaces become large, pressure decreased, the pipe string forms negative pressure in two ends up and down relatively, upper ball-and-seat 3 still is in closed condition, but lower ball-and-seat 6 can be opened under pressure, and gravel and shaft bottom liquid enter sand loading cylinder 5.After sand bucket 4 is all stretched out, upper lifting force can strengthen suddenly, at this moment carry on stopping, begin to press down tubing string, lower ball-and-seat 6 is closed, and sand bucket 4 and sand loading cylinder 5 interior liquid rise, and upper ball-and-seat 3 can be opened, can by upper ball-and-seat 3 by counter being discharged in the pit shaft of sliding sleeve 2 openings, until shrinking, finish sand bucket when liquid is too much.
Repeatedly pull open and shrink sand bucket pipe string until find sand bucket during the upper lifting pipe post and no longer stretch out, at this moment the weight of carrying on beginning is very large, descends ball-and-seat not open, reach the sand loading upper limit in the sand loading cylinder.Trip out large capacity negative pressure sand bucket pipe string, get rid of gravel, check and clean tubing string, again subjob after reconnecting.The V-seal combining structure that sand bucket adopts guarantees that sand bucket telescopic process frictional force is little, and does not affect sealing performance.
Among the embodiment of the present utility model, the sealing ring that sand bucket adopts and the combination of v-seal spare, characteristics with the little while good sealing effect of frictional force cooperate the following counterweight of sand bucket, guarantee that sand bucket can be stretched out and inner formation negative pressure under the naturally vertical state of sand bucket pipe string.The sealing ring that sand bucket adopts and the sealing combination structure of v-seal spare have the self-shield ability, and reliability is strong, has prolonged the application life of seal.On the sand bucket piston wear ring is installed, the wear ring anti-wear performance that adopts the polytetrafluoroethylene (PTFE) material to make is good, effectively isolated Metal Contact, prevent mechanical shock, part injury when avoiding stretching out contractive action, wear ring has the centering effect simultaneously, guarantees that sand bucket is steadily reliable in the course of the work, thereby has greatly prolonged the sand bucket whole service life.
Among the embodiment of the present utility model, sand bucket up and down two ball-and-seats is used in conjunction with, and in pressing down process, upper ball-and-seat is opened discharge opeing, and lower ball-and-seat is closed; On be pulled through in the journey, upper ball-and-seat is closed sealing, forms negative pressure, lower ball-and-seat is opened into sand.In the situation that repeatedly put the pressure pipe post repeatedly, constantly use this action principle, until liquid storage body not in the sand loading cylinder, sand loading reaches the upper limit.The application of this structure can reach the effect that large capacity drags for sand, and less lower tubular column number of times saved operating cost.
Among the embodiment of the present utility model, sand bucket push rod cross section and stack shell inner hole section are orthohexagonal, adopt can drive guide shoe when tubing string rotates after this kind design and rotate, when dragging for sand and be hampered, rotate by guide shoe bottom and to abolish the cementing and broken little junk of sand grains, can prevent from meeting the card accident and occur.
Among the embodiment of the present utility model, the rubber seal that sand bucket adopts and the seal combination of v-seal spare, good sealing effect, reliability is strong, has prolonged the application life of potted component.
In running string process of embodiment of the present utility model, can repeated multiple timesly take out sand, sand grains is kept at the sand loading cylinder, liquid is counter to be discharged in the pit shaft, inhales sand effective, drags for the sand amount large, success rate is high, the low example structure of the present utility model of operating cost is reliable, and long service life can effectively be abolished the cementing and small falling object of gravel.
Although the disclosed embodiment of the utility model as above, the embodiment that described content just adopts for the ease of understanding the utility model is not to limit the utility model.Those of skill in the art under any the utility model; under the prerequisite that does not break away from the disclosed spirit and scope of the utility model; can do any modification and variation in the details that reaches of implementing in form; but scope of patent protection of the present utility model still must be as the criterion with the scope that appending claims was defined.

Claims (6)

1. a sand bucket pipe string is characterized in that, comprises sliding sleeve (2), upper ball-and-seat (3), sand bucket (4), sand loading cylinder (5) and lower ball-and-seat (6) that order links to each other, wherein:
Sliding sleeve (2) includes opening, links by opening and outside; The pressure of upper ball-and-seat (3) in sand bucket (4) and sand loading cylinder (5) is closed during less than external pressure, opens during greater than external pressure; The pressure of lower ball-and-seat (6) in sand bucket (4) and sand loading cylinder (5) is closed during greater than external pressure, opens during less than external pressure; The sand loading cylinder (5) that serves as counterweight comprises the multiple-tubing string that is connected.
2. sand bucket pipe string according to claim 1 is characterized in that,
Sand loading cylinder (5) comprises six roots of sensation standard oil pipe.
3. sand bucket pipe string according to claim 1 is characterized in that, this sand bucket pipe string comprises,
Guide shoe (7) is connected to the two ends of lower ball-and-seat (6) with sand loading cylinder (5).
4. sand bucket pipe string according to claim 1 is characterized in that, sand bucket (4) comprises,
Stack shell (9) and be enclosed within the inner push rod (8) of stack shell (9), the endoporus of stack shell (9) is hexagonal cross-section, push rod (8) is the body of rod of hexagonal cross-section.
5. sand bucket pipe string according to claim 1 is characterized in that, in the sand bucket (4),
Be enclosed within on the piston (10) in the stack shell (9) wear ring (11) is installed.
6. sand bucket pipe string according to claim 1 is characterized in that,
Sliding sleeve (2) one ends connect upper ball-and-seat (3), other end connected pipes pipe nipple (1).
CN 201220236247 2012-05-24 2012-05-24 Sand pump pipe string Expired - Lifetime CN202673215U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220236247 CN202673215U (en) 2012-05-24 2012-05-24 Sand pump pipe string

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220236247 CN202673215U (en) 2012-05-24 2012-05-24 Sand pump pipe string

Publications (1)

Publication Number Publication Date
CN202673215U true CN202673215U (en) 2013-01-16

Family

ID=47494126

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220236247 Expired - Lifetime CN202673215U (en) 2012-05-24 2012-05-24 Sand pump pipe string

Country Status (1)

Country Link
CN (1) CN202673215U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661579A (en) * 2017-03-27 2018-10-16 中国石油化工股份有限公司 A kind of Telescopic continuous flushing device and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661579A (en) * 2017-03-27 2018-10-16 中国石油化工股份有限公司 A kind of Telescopic continuous flushing device and method
CN108661579B (en) * 2017-03-27 2023-12-12 中国石油化工股份有限公司 Telescopic continuous sand washing device and method

Similar Documents

Publication Publication Date Title
CN108266173B (en) Method for segmented reconstruction of well completion
CN206071845U (en) A kind of Anti-sway wear-pump oil pump
CN107762444B (en) Integrated tubular column for well cementation and sand prevention and use method
CN205778731U (en) A kind of sliding sleeve switch bridging plug
CN206053921U (en) A kind of self-unsealing successively sand washing layered fracturing pipe string
CN201730822U (en) Novel torque transmission bailing pump
CN202673215U (en) Sand pump pipe string
RU2432456C1 (en) Device for development of well with swabbing
RU2440491C1 (en) Device for well formation swabbing development
CN201180521Y (en) System used for horizontal well sand pumping
RU2527433C1 (en) Method for borehole bottom flushing
CN103573207A (en) Injection-compression packer
CN101250991B (en) Oil well horizontal sand-pumping device as well as sand-pumping method thereof
CN207437009U (en) It is a kind of to integrate the pit shaft fettling installation for rinsing fishing sand
CN211230399U (en) Shale gas composite discharging and mining process pipe column
CN201276993Y (en) Novel anti-propping slips
CN206600153U (en) A kind of Telescopic continuous flushing device
CN201180523Y (en) System used for oil well sand pumping
CN206592107U (en) Down-hole oil production elastic expansion plunger
CN208236394U (en) A kind of sand control flow string
CN1184406C (en) Vacum tube-type bailing process and its borehole tool
CN202064862U (en) Continuous sand washing device of immobile well head
CN204082117U (en) A kind of new-type waterpower swab
CN114542011B (en) Acidizing ball seat suitable for ultra-deep carbonate gas reservoir and use method thereof
CN201292801Y (en) Suspension type oil layer protection packer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee after: CHINA OILFIELD SERVICES Ltd.

Patentee after: China Offshore Oil Group Co., Ltd.

Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee before: CHINA OILFIELD SERVICES Ltd.

Patentee before: CHINA NATIONAL OFFSHORE OIL Corp.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130116