CN202666802U - Control device for flow velocity - Google Patents

Control device for flow velocity Download PDF

Info

Publication number
CN202666802U
CN202666802U CN 201220288992 CN201220288992U CN202666802U CN 202666802 U CN202666802 U CN 202666802U CN 201220288992 CN201220288992 CN 201220288992 CN 201220288992 U CN201220288992 U CN 201220288992U CN 202666802 U CN202666802 U CN 202666802U
Authority
CN
China
Prior art keywords
control valve
pipeline
visor
dropwise adding
flange
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220288992
Other languages
Chinese (zh)
Inventor
韩烨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongying Tianzheng Chemical & Industrial Co Ltd
Original Assignee
Dongying Tianzheng Chemical & Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongying Tianzheng Chemical & Industrial Co Ltd filed Critical Dongying Tianzheng Chemical & Industrial Co Ltd
Priority to CN 201220288992 priority Critical patent/CN202666802U/en
Application granted granted Critical
Publication of CN202666802U publication Critical patent/CN202666802U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a control device for a flow velocity, which is mainly composed of an overhead tank 1, a first control valve 2, a dropwise adding view mirror 3, a second control valve 4, a reaction kettle 5 and pipelines 6, 7, 8 and 9, wherein the overhead tank 1 is connected with the first control valve 2 through the pipeline 6; the first control valve 2 is connected with the dropwise adding view mirror 3 through the pipeline 7; the tail end of the pipeline 7 is inserted into the dropwise adding view mirror 3; the dropwise adding view mirror 3 is connected with the second control valve 4 through the pipeline 8; the second control valve 4 is connected with a feeding port of the reaction kettle 5 through the pipeline 9; the dropwise adding view mirror 3 is composed of a flange view mirror 10 and a dropwise adding jar 11; and one end of the dropwise adding jar 11 is only connected with one flange view mirror 10 or the two ends of the dropwise adding jar 11 are connected with two flange view mirrors 10. Through the control device for the flow velocity, the product quality and the production efficiency are increased while the stability of the product is effectively increased.

Description

Current velocity controller
Technical field:
The utility model relates to a kind of control device of Chemical Manufacture, particularly the current velocity controller in the Chemical Manufacture.
Background technology:
In the existing Chemical Manufacture, head tank directly is connected to the charging aperture of reactor by pipeline, the flow velocity of the material in the bad like this control head tank, thus having affected subsequent production, product stability is poor, and product quality is not high.
The utility model content:
The utility model is exactly for above-mentioned the problems of the prior art, and a kind of current velocity controller simple in structure, reasonable in design is provided.
The technical solution of the utility model is: current velocity controller, mainly by head tank 1, the first control valve 2 drips visor 3, the second control valves 4, reactor 5 and pipeline 6,7,8,9 consist of, head tank 1 connects the first control valve 2, the first control valves 2 by pipeline 6 and connects dropping visor 3 by pipeline 7, and pipeline 7 terminal insertions drip in the visor 3, drip visor 3 and be connected with the second control valve 4 by pipeline 8, the second control valve 4 is connected to the charging aperture of reactor 5 by pipeline 9.
Described dropping visor 3 is made of flange visor 10 and dropping tank 11, and described dropping tank 11 1 ends only connect a flange visor 10 or two ends connect two flange visors 10.Can regulate the first control valve 2 according to need of production by observe the material flow of pipeline 7 to the flange visor 10 that drips visor 3, reach the purpose of regulating material flow.
By the utility model, the beneficial effect of obtaining is: can improve product quality and production efficiency, simultaneously the stability of energy Effective Raise product.
Description of drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the dropping visor 3 plan structure schematic diagrames of two the flange visors 10 in two ends among Fig. 1;
Fig. 3 is the dropping visor 3 plan structure schematic diagrames of a flange visor 10 of an end among Fig. 1;
Wherein, head tank 1; The first control valve 2; Drip visor 3; The second control valve 4; Reactor 5; Pipeline 6,7,8,9, flange visor 10; Drip tank 11.
The specific embodiment:
Embodiment 1:
As shown in Figure 1 and Figure 2, current velocity controller is mainly by head tank 1, the first control valve 2, drip visor 3, the second control valve 4, reactor 5 and pipeline 6,7,8,9 consist of, and head tank 1 connects the first control valve 2 by pipeline 6, the first control valve 2 connects dropping visor 3 by pipeline 7, and pipeline 7 terminal insertions drip in the visor 3, drip visor 3 and are connected with the second control valve 4 by pipeline 8, and the second control valve 4 is connected to the charging aperture of reactor 5 by pipeline 9.
Described dropping visor 3 is made of flange visor 10 and dropping tank 11, and described dropping tank 11 two ends connect two flange visors 10.During use, can according to need of production, regulate the first control valve 2 by the material flow in the flange visor 10 observation pipelines 7 that drip visor 3, can reach the purpose of control material flow.
Embodiment 2:
Such as Fig. 1, shown in Figure 3, only connect a flange visor 10 at dropping tank 11 1 ends, other are with embodiment 1.
By the technical program, can improve the quality of products the stability of Effective Raise product.

Claims (1)

1. current velocity controller, mainly by head tank, the first control valve drips visor, the second control valve, reactor and pipeline consist of, it is characterized in that: head tank connects the first control valve by pipeline, and the first control valve connects the dropping visor by pipeline, and end of line is inserted in the dropping visor, drip visor and be connected with the second control valve by pipeline, the second control valve is connected to the charging aperture of reactor by pipeline.
2, current velocity controller as claimed in claim 1 is characterized in that: described dropping visor is made of flange visor and dropping tank, and described dropping tank one end only connects a flange visor or two ends connect two flange visors.
CN 201220288992 2012-06-19 2012-06-19 Control device for flow velocity Expired - Fee Related CN202666802U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220288992 CN202666802U (en) 2012-06-19 2012-06-19 Control device for flow velocity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220288992 CN202666802U (en) 2012-06-19 2012-06-19 Control device for flow velocity

Publications (1)

Publication Number Publication Date
CN202666802U true CN202666802U (en) 2013-01-16

Family

ID=47487736

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220288992 Expired - Fee Related CN202666802U (en) 2012-06-19 2012-06-19 Control device for flow velocity

Country Status (1)

Country Link
CN (1) CN202666802U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103143301A (en) * 2013-03-13 2013-06-12 安徽省虹升生物科技有限公司 Material dropping device of reaction kettle

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103143301A (en) * 2013-03-13 2013-06-12 安徽省虹升生物科技有限公司 Material dropping device of reaction kettle

Similar Documents

Publication Publication Date Title
CN202666802U (en) Control device for flow velocity
CN203379864U (en) Raw material dropping device for continuously producing bromoethane
CN201588139U (en) Adjustable wire separator
CN203208901U (en) Reverse osmosis system
CN202715262U (en) Device for adjusting temperature of top of fractionating tower
CN204292020U (en) A kind of aquaculture heat supply oxygen supply mechanism
CN202955219U (en) Hydraulic water storage equipment
CN204380643U (en) Reactor discharging bottom valve
CN202128950U (en) Defoaming device for crystallizing tank
CN202954043U (en) Pressure-stabilizing type biogas generating device
CN204325468U (en) A kind of network transformer tin plated clamp
CN203349659U (en) Heat-preserving furnace inlet pouring nozzle
CN202820555U (en) Flower vase convenient to change water
CN202064008U (en) Electrolytic device
CN202715263U (en) Fractionating tower cutting point regulation control device
CN205575661U (en) Polycrystalline silicon side's silicon core
CN202902936U (en) Novel cooling device for automatic silicone sealant production line
CN204325194U (en) A kind of MTBE desulfurization production device of improvement
CN202513729U (en) Outlet box for motor
CN201922175U (en) Single-soldering-station heating plate for photovoltaic components
CN204173927U (en) A kind of gas, liquid, solid phase reactor with removable nozzle
CN203002021U (en) Extraction tower for benzene hydrogenation device
CN203904005U (en) Ammonia still ammonia gas stabilizing device
CN202655593U (en) Lead furnace crystallizer protecting sleeve
CN203918173U (en) A kind of cutter combined type feeder

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130116

Termination date: 20180619

CF01 Termination of patent right due to non-payment of annual fee