CN202661545U - Three-phase electric energy meter - Google Patents

Three-phase electric energy meter Download PDF

Info

Publication number
CN202661545U
CN202661545U CN 201220283871 CN201220283871U CN202661545U CN 202661545 U CN202661545 U CN 202661545U CN 201220283871 CN201220283871 CN 201220283871 CN 201220283871 U CN201220283871 U CN 201220283871U CN 202661545 U CN202661545 U CN 202661545U
Authority
CN
China
Prior art keywords
electric energy
energy meter
phase electric
microprocessor
computation chip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220283871
Other languages
Chinese (zh)
Inventor
胡志刚
刘其君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Sanxing Medical and Electric Co Ltd
Original Assignee
Ningbo Sanxing Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Sanxing Electric Co Ltd filed Critical Ningbo Sanxing Electric Co Ltd
Priority to CN 201220283871 priority Critical patent/CN202661545U/en
Application granted granted Critical
Publication of CN202661545U publication Critical patent/CN202661545U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Measuring Phase Differences (AREA)

Abstract

The utility model discloses a three-phase electric energy meter which comprises a first metering chip, a microprocessor, a communication module and an internal memory. An input end of the first metering chip is electrically connected with three-phase alternating current; an output end of the first metering chip, the communication module and the internal memory are connected with the microprocessor respectively; the three-phase electric energy meter further comprises a second metering chip; an input end of the second metering chip is connected with the three-phase alternating current; and an output end of the second metering chip is connected with the microprocessor. The working reliability of the three-phase electric meter is high.

Description

Three-phase electric energy meter
Technical field
The utility model relates to the electric energy meter technical field, specifically is a kind of three-phase electric energy meter.
Background technology
The three-phase electric energy meter of prior art comprises computation chip, microprocessor, communication module and internal memory, and the input end of described computation chip is electrically connected with three-phase alternating current, and the output terminal of described computation chip, communication module, internal memory all are connected with microprocessor.There is following defective in the three-phase electric energy meter of said structure in the use procedure of reality: because the three-phase electric energy meter of prior art adopts the metering of single metering chip, therefore when this computation chip damages, can stop gage work, thereby cause the functional reliability of the three-phase electric energy meter of prior art to reduce.In addition, owing to adopt the metering of single metering chip, therefore can cause the measuring accuracy of three-phase electric energy meter lower.
The utility model content
The technical problems to be solved in the utility model is, overcomes the defective of above prior art, and a kind of functional reliability height and the high three-phase electric energy meter of measuring accuracy are provided.
The technical solution of the utility model is, a kind of three-phase electric energy meter is provided, comprise the first computation chip, microprocessor, communication module and internal memory, the input end of described the first computation chip is electrically connected with three-phase alternating current, the output terminal of described the first computation chip, communication module, internal memory all are connected with microprocessor, described three-phase electric energy meter also comprises the second computation chip, and the input end of described the second computation chip is electrically connected with three-phase alternating current, and the output terminal of described the second computation chip is connected with microprocessor.
After adopting above structure, the utility model compared with prior art has the following advantages:
The utility model three-phase electric energy meter adopts two computation chips meterings, and namely therefore double-loop metering can also adopt the metering of another one computation chip when a computation chip damages, thereby so that the functional reliability of the three-phase electric energy meter of prior art increase.Simultaneously, owing to adopt two circuit two computation chips metering, can analyze, compare the data error of two chips by the output Data Comparison of two chips, thereby measuring accuracy is drawn accurate an analysis.Therefore the measuring accuracy of the utility model three-phase electric energy meter is high.
Description of drawings
Accompanying drawing is the structural representation of the utility model three-phase electric energy meter.
Embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.
As shown in drawings, a kind of three-phase electric energy meter of the utility model, comprise the first computation chip, microprocessor, communication module and internal memory, the input end of described the first computation chip is electrically connected with three-phase alternating current, the output terminal of described the first computation chip, communication module, internal memory all are connected with microprocessor, wherein the first computation chip, communication module and the transmission of microprocessor one-way data, internal memory and microprocessor are bidirectional data transfers.Described three-phase electric energy meter also comprises the second computation chip, and the input end of described the second computation chip is electrically connected with three-phase alternating current, and the output terminal of described the second computation chip is connected with microprocessor.
The utility model proposes and adopt two-way independently voltage, current sampling circuit and computation chip/metering module, adopt the way to manage of similar Source of Gateway Meter " major-minor table ": major and minor loop all through calibration, and has independently calibration pulse output before dispatching from the factory; The electrical energy pulse that microprocessor can provide according to major and minor loop/electric energy equivalent adds up respectively, and regularly judges the measurement deviation (when not surpassing setting value, microprocessor can not add up the energy of subloop) in major and minor loop; When surpassing setting value, the electric energy meter automatic alarm also adds up respectively the electric energy added value of major and minor loop when surpassing setting value, thereby has improved measuring accuracy and the functional reliability of three-phase electric energy meter.
Below only be described with regard to most preferred embodiment of the present utility model, but can not be interpreted as it is limitations on claims.The utility model is not limited only to above embodiment, and its concrete structure allows to change.In every case the various variations of doing in the protection domain of the utility model independent claims are all in protection domain of the present utility model.

Claims (1)

1. three-phase electric energy meter, comprise the first computation chip, microprocessor, communication module and internal memory, the input end of described the first computation chip is electrically connected with three-phase alternating current, the output terminal of described the first computation chip, communication module, internal memory all are connected with microprocessor, it is characterized in that: described three-phase electric energy meter also comprises the second computation chip, the input end of described the second computation chip is electrically connected with three-phase alternating current, and the output terminal of described the second computation chip is connected with microprocessor.
CN 201220283871 2012-06-15 2012-06-15 Three-phase electric energy meter Expired - Lifetime CN202661545U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220283871 CN202661545U (en) 2012-06-15 2012-06-15 Three-phase electric energy meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220283871 CN202661545U (en) 2012-06-15 2012-06-15 Three-phase electric energy meter

Publications (1)

Publication Number Publication Date
CN202661545U true CN202661545U (en) 2013-01-09

Family

ID=47456443

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220283871 Expired - Lifetime CN202661545U (en) 2012-06-15 2012-06-15 Three-phase electric energy meter

Country Status (1)

Country Link
CN (1) CN202661545U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103698598A (en) * 2013-12-26 2014-04-02 华立仪表集团股份有限公司 Ammeter and low-error pulse output method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103698598A (en) * 2013-12-26 2014-04-02 华立仪表集团股份有限公司 Ammeter and low-error pulse output method thereof

Similar Documents

Publication Publication Date Title
CN202661545U (en) Three-phase electric energy meter
CN103217581B (en) The method and system of line parameter circuit value identification is realized based on stable state telemetry
CN202998167U (en) Protocol converter
CN202018506U (en) On-site check meter for electric energy metering device
CN103605105B (en) Calibration device for digital electric energy meter of intelligent substation
CN102998651B (en) Error calibration device and system and error transfer system and method of full digital electric energy meter
CN202837528U (en) Error detector for detection of electric energy meter
CN202649318U (en) Multifunctional electric power meter with voltage phase sequence detection function
CN204241617U (en) Energy-saving transmission line malfunction monitoring system
CN203422793U (en) Three-phase local charge-controlled intelligent ammeter
CN202840692U (en) Intelligent grid collection terminal function detection system
CN203732624U (en) Single-phase digital frequency measuring instrument based on AT89C52 chip
CN202177662U (en) High-precision three-phase intelligent electric energy meter
CN204945213U (en) A kind of networking multifunction instrument
CN203054121U (en) Current calibration system for sinusoidal AC motor protector
CN203037706U (en) Multi-rate single-phase electric energy meter
CN203037733U (en) Single-phase electric energy meter realized by and based on ADE7755
CN202362364U (en) Multi-user electric energy meter
CN202929374U (en) Voltage monitor time calibration circuit
CN204177949U (en) A kind of light digital relay protection tester pick-up unit
CN201302594Y (en) Resistance testing device
CN202330551U (en) Metering circuit of single-phase three-wire keyboard electric energy meter
CN203672934U (en) Intelligent single-phase charge-control electric energy meter
CN203224565U (en) A metering apparatus of an electric energy data verifying tool
CN202421327U (en) Three-phase four-wire multi-rate remote electric energy meter

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 315191 Yinzhou Industrial Park, Zhejiang, Ningbo, Yinzhou District, Ningbo

Patentee after: NINGBO SANXING MEDICAL ELECTRIC CO., LTD.

Address before: 315131, AUX Industrial Park, Mingguang North Road, Jiangshan Town, Ningbo, Yinzhou District, Zhejiang 1166, China

Patentee before: Ningbo Sanxing Electric Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130109