CN202658479U - U-shaped bolt cement road tie - Google Patents

U-shaped bolt cement road tie Download PDF

Info

Publication number
CN202658479U
CN202658479U CN 201220339507 CN201220339507U CN202658479U CN 202658479 U CN202658479 U CN 202658479U CN 201220339507 CN201220339507 CN 201220339507 CN 201220339507 U CN201220339507 U CN 201220339507U CN 202658479 U CN202658479 U CN 202658479U
Authority
CN
China
Prior art keywords
road
road tie
shaped bolt
bolt
pillow body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220339507
Other languages
Chinese (zh)
Inventor
冷政华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201220339507 priority Critical patent/CN202658479U/en
Application granted granted Critical
Publication of CN202658479U publication Critical patent/CN202658479U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a U-shaped bolt cement road tie, which belongs to the field of railway fittings and is used for solving the problem of severe potential safety accident hazard caused by unreasonable structural connection of the conventional cement road tie. The U-shaped bolt cement road tie comprises a road tie body, a U-shaped bolt, a nut and a pressure plate, wherein the road tie body is made by pouring reinforced concrete; the U-shaped bolt and the nut are used for connecting the road tie body; the pressure plate is used for fixing; two pairs of through holes perforated from top to bottom are formed transversely in the upper part of the road tie body; the two pairs of through holes are symmetrically distributed along the longitudinal central line of the road tie body; the pressure plate is arranged on the upper part of the road tie body; and the U-shaped bolt passes through the through holes and the pressure plate in sequence from the bottom of the road tie body, and is connected and fixed with the nut. The U-shaped bolt cement road tie has the advantages of simple structure, low price, convenience in using, great improvement on the safety performance of the connection between the road tie body and a railway, reusability and great saving in the production maintenance cost.

Description

U-bolt formula cement road pillow
Technical field
The utility model relates to a kind of road pillow, specifically, relates to a kind of U-bolt formula cement road pillow.
Background technology
The road pillow claims again sleeper or sleeper, belongs to one of railway casting.Road pillow original adoption timber is made, and after the World War II, because various countries' timber lacks, the road pillow that gradually adopts concreting to form is commonly called as " cement road pillow ", and cement road pillow has economical with materials, long service life, characteristics that track stability is good.
In the hole, mine ore deposit in colliery, for the ease of carrying mineral aggregate, usually adopt middle-size and small-size railcar, correspondingly, can normally use in order to make railcar, need to lay track.Lay at present track and generally use spike-type, T-shaped bolt type, pre-buried lockpin-type road pillow etc., in use, be easy to cause security incident because long-time vibrations make bolt looseness cause track to come off; And the acid colliery water that contains free sulfuric acid that exists in the hole, mine ore deposit in colliery has corrosiveness to metal, is easy to corrode pre-buried metal fastener, can cause equally bolt looseness to come off and causes security incident.
The utility model content
The purpose of this utility model is to provide a kind of U-bolt formula cement road pillow, and the structure that solves present cement road pillow connects unreasonable and has the problem of serious security incident hidden danger.
To achieve these goals, the technical solution adopted in the utility model is as follows:
U-bolt formula cement road pillow comprises by steel concrete and builds the road pillow body that forms, and is used for connecting U-bolt and the nut of road pillow body, and is used for fixing pressing plate; The upper lateral of described road pillow body is provided with two pairs of perforations through hole up and down, two pairs of through holes are symmetrical with the longitudinal centre line of road pillow body, pressing plate is arranged at pillow body top, and U-bolt passes successively through hole and pressing plate and is connected and fixed with nut from pillow body bottom, road.
Further, be provided with the draw-in groove of being convenient to place U-bolt that is interconnected between every pair of through hole of pillow body bottom, described road.
In order to increase application life, described road is rested the head between body and the pressing plate and is equipped with pad in the draw-in groove.
For economical with materials, described pad is made by elastomeric material, and this pad adopts elastomeric material waste and old in the colliery to make usually.
Compared with prior art, the utlity model has following beneficial effect:
(1) the utility model is simple in structure, and is cheap, easy to use, is fit to apply.
(2) the utility model adopts U-bolt to be connected and fixed, the nut difficult drop-off, and the architectural characteristic of utilizing U-bolt self makes pillow body and track interfix effectively, even nut loosening, track is dropped from road pillow body, thereby greatly improved safety in utilization of the present utility model.
(3) road of the present utility model is rested the head on body and is provided with the through hole corresponding with the U-bolt shape and draw-in groove, it is stable fixing after U-bolt is installed, be difficult for sliding and break away from, further improve safety, and avoided metal fastener pre-buried in the existing road pillow easily by the shortcoming of acid colliery aqueous corrosion.
(4) the utility model utilize pressing plate with track fixing with road pillow body on, increased the degree of fixation of track, thereby improved safety.
(5) the utility model is provided with rubber sheet gasket, slows down railcar through the jerk of out-of-date generation, has improved application life, and this rubber adopts elastomeric material waste and old in the colliery usually, and raw material has been saved in twice laid.
(6) the utility model uses U-bolt directly and the road is rested the head on the body through hole and draw-in groove are fixed, metal parts by acid colliery aqueous corrosion after, only needing to change corresponding metal parts gets final product, road pillow body itself does not damage, can reuse, the manufacturing that has reduced road pillow body drops into, thereby has saved cost.
Description of drawings
Fig. 1 is the plan structure schematic diagram of pillow body in road in the utility model.
Fig. 2 is the A-A cross-sectional view of Fig. 1.
Fig. 3 is that the utility model uses view.
In the above-mentioned accompanying drawing, the component names that Reference numeral is corresponding is as follows:
1-road pillow body, 2-U type bolt, 3-nut, 4-pressing plate, 5-pad, 6-track, 11-through hole, 12-draw-in groove.
The specific embodiment
The utility model is described in further detail below in conjunction with drawings and Examples, and embodiment of the present utility model includes but not limited to the following example.
Embodiment
Shown in Fig. 1~3, U-bolt formula cement road pillow is mainly used in the delivery track in the hole, mine ore deposit in colliery, comprises by steel concrete and builds the road pillow body 1 that forms, and is used for connecting U-bolt 2 and the nut 3 of road pillow body, and is used for fixing pressing plate 4; The upper lateral of described road pillow body 1 is provided with two pairs of perforations through hole 11 up and down, two pairs of through holes are symmetrical with the longitudinal centre line of road pillow body, its spacing is corresponding with the track width on being installed on pillow, pressing plate 4 is arranged at pillow body top, and U-bolt 2 passes successively through hole and pressing plate and is connected and fixed with nut 3 from pillow body bottom, road.Be provided with the draw-in groove 12 of being convenient to place U-bolt that is interconnected between every pair of through hole of pillow body bottom, road.Described road is rested the head between body 1 and the pressing plate 4 and is equipped with pad 5 in the draw-in groove 12, and this pad is made by elastomeric material, and this pad adopts elastomeric material waste and old in colliery to make usually, and twice laid economizes in raw materials.
In the actual use procedure, a road pillow body is furnished with 2 U-bolts, 4 nuts, 4 pressing plates, 4 pads, and two tracks.Track is generally the track of I shape, the bottom surface of a track is positioned between a pair of through hole of upper surface of pillow body between be separated out, and between track and road pillow body, add Upper gasket; In the bottom surface draw-in groove of road pillow body, place pad, and the bottom surface through hole of U-bolt from road pillow body gone out to penetrate, the end of U-bolt passes from the upper surface of road pillow body, pressing plate is penetrated the U-bolt end again and pushes down the whippletree place, bottom of I shape track, and fastening nut is fixing to be got final product.
Because road pillow body is to be built by steel concrete to form, normal service life is very long, and the metal parts such as U-bolt are subject to the corrosion of acid colliery water easily in the colliery, after it damages, only need to change corresponding metal parts and get final product, realize real recycling.
According to above-described embodiment, just can realize well the utility model.

Claims (4)

1.U type bolt type cement road pillow comprises by steel concrete and builds the road pillow body (1) that forms, and it is characterized in that, also comprises for the U-bolt (2) and the nut (3) that connect road pillow body (1), and is used for fixing pressing plate (4); The upper lateral of described road pillow body (1) is provided with two pairs of perforations through hole (11) up and down, two pairs of through holes (11) are symmetrical with the longitudinal centre line of road pillow body (1), pressing plate (4) is arranged at pillow body (1) top, and U-bolt (2) passes successively through hole (11) and pressing plate (4) and is connected and fixed with nut (3) from road pillow body (1) bottom.
2. U-bolt formula cement according to claim 1 road pillow is characterized in that, is provided with the draw-in groove of being convenient to place U-bolt (2) (12) that is interconnected between every pair of through hole (11) of described road pillow body (1) bottom.
3. U-bolt formula cement according to claim 2 road pillow is characterized in that, between described road pillow body (1) and the pressing plate (4) and be equipped with pad (5) in the draw-in groove (12).
4. U-bolt formula cement according to claim 3 road pillow is characterized in that described pad (5) is made by elastomeric material.
CN 201220339507 2012-07-13 2012-07-13 U-shaped bolt cement road tie Expired - Fee Related CN202658479U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220339507 CN202658479U (en) 2012-07-13 2012-07-13 U-shaped bolt cement road tie

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220339507 CN202658479U (en) 2012-07-13 2012-07-13 U-shaped bolt cement road tie

Publications (1)

Publication Number Publication Date
CN202658479U true CN202658479U (en) 2013-01-09

Family

ID=47453396

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220339507 Expired - Fee Related CN202658479U (en) 2012-07-13 2012-07-13 U-shaped bolt cement road tie

Country Status (1)

Country Link
CN (1) CN202658479U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147369A (en) * 2013-03-29 2013-06-12 无锡恒畅铁路轨枕有限公司 Elastic concrete sleeper
CN103603242A (en) * 2013-08-30 2014-02-26 天津二十冶建设有限公司 U-shaped bolt for fixing rail of stocker and installation method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147369A (en) * 2013-03-29 2013-06-12 无锡恒畅铁路轨枕有限公司 Elastic concrete sleeper
CN103603242A (en) * 2013-08-30 2014-02-26 天津二十冶建设有限公司 U-shaped bolt for fixing rail of stocker and installation method thereof
CN103603242B (en) * 2013-08-30 2016-04-20 天津二十冶建设有限公司 A kind of U bolt fixing for stacker track and mounting method thereof

Similar Documents

Publication Publication Date Title
CN203546532U (en) High-speed railway ballast track steel rail fastener system
CN202658479U (en) U-shaped bolt cement road tie
CN203668767U (en) Assembly rail crawling-prevention device
CN101392500B (en) Multiaspect displacement bridge retractor device
CN210481909U (en) Be used for TBM track to prevent excursion device
CN201284450Y (en) Conveniently detachable sleeper
CN202090293U (en) T-shaped beam bridge steel plate wrapping and reinforcing structure
CN201794015U (en) Reinforced concrete railway level crossing for metallurgical enterprises
CN205347892U (en) Prevent toppling whole backing plate and use its way turnout switch
CN212742025U (en) Railway track reinforcing structure
CN200996119Y (en) Iron-steel sleeper
CN203420211U (en) Connecting structure of railroad bridge open bridge floor wooden sleeper and steel beam
CN203475242U (en) Wood sleeper elastic strip fastener for meter-gauge railway
CN203229867U (en) Manipulator for replacing and demounting elastic locking strip of bridge expansion device
CN202925387U (en) Elastic strip hole seat for steel rail damping fastener
CN209428864U (en) A kind of fixation device of rail and bridge junction
CN2147259Y (en) Assemble type steel track sleepers
CN203229868U (en) Manipulator for replacing and demounting waterproof strip of bridge expansion device
CN103510432A (en) Wood sleeper elastic strip fastener used for meter gage
CN202006804U (en) Simple locomotive coupler buffer
CN205242183U (en) WS type concrete sleeper
CN216474278U (en) Fastener for tramcar
CN217710163U (en) Railway crossing plate structure based on steel rail
CN216338770U (en) Alloy steel combined frog for engineering machinery
CN205676736U (en) Direct press type sleeper

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130109

Termination date: 20150713

EXPY Termination of patent right or utility model