CN202657866U - A-framed derrick for hoisting heavy object - Google Patents

A-framed derrick for hoisting heavy object Download PDF

Info

Publication number
CN202657866U
CN202657866U CN 201220166386 CN201220166386U CN202657866U CN 202657866 U CN202657866 U CN 202657866U CN 201220166386 CN201220166386 CN 201220166386 CN 201220166386 U CN201220166386 U CN 201220166386U CN 202657866 U CN202657866 U CN 202657866U
Authority
CN
China
Prior art keywords
mobile jib
hoisting
strut
framed
derrick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220166386
Other languages
Chinese (zh)
Inventor
赵永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
CMTCC Shanghai Shisanye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd, CMTCC Shanghai Shisanye Construction Co Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN 201220166386 priority Critical patent/CN202657866U/en
Application granted granted Critical
Publication of CN202657866U publication Critical patent/CN202657866U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses an A-framed derrick for hoisting a heavy object. The A-framed derrick comprises a main rod, a supporting rod and a lifting lug, wherein the main rod is obliquely arranged; the top end of the supporting rod is arranged on the middle part of the main rod; the bottom ends of the main rod and the supporting rod are arranged on an equipment basic member through welding respectively; and the lifting lug is arranged at the top end of the main rod. The A-framed derrick has the advantages of simple structure, easiness and convenience in operation, suitability for hoisting operation of centralized hoisting work and a small movement range, capabilities of increasing the efficiency of the hoisting work and reducing the cost of the hoisting work and good economic benefit.

Description

The A-frame that is used for hoisting heavy
Technical field
The utility model relates to a kind of A-frame for hoisting heavy.
Background technology
In some construction occasion, because the camp site is narrow, large-scale elevator machinery inconvenience enters the workyard and carries out operation; Perhaps the camp site lacks other construction machinery and equipment; Or because the work capacity of lifting is few, adopting the large scale hoisting machinery cost high, alerting ability is relatively poor.Therefore field fabrication is convenient and simple, and installation and removal is easy to suspender can remedy the shortcoming that the large scale hoisting machinery cost is high, manoevreability is not enough.
Summary of the invention
Technical problem to be solved in the utility model provides a kind of A-frame for hoisting heavy, this herringbone gin pole is simple in structure, easy and simple to handle, the hoisting operation that applicable crane lifting service is concentrated, moving range is little, improved lifting operation efficient, reduced the cost of lifting operation, have good economic benefit.
For solving the problems of the technologies described above, the A-frame that the utility model is used for hoisting heavy comprises mobile jib, strut and hanger, described mobile jib is obliquely installed, described mobile jib middle part is located on described strut top, the bottom of described mobile jib and strut is located on the Equipment Foundations member by welding respectively, and described hanger is located at described mobile jib top.
Further, this herringbone gin pole also comprises base, and the bottom of described mobile jib and strut is located on the described base by welding respectively.
Further, connect by full weld respectively between above-mentioned mobile jib, strut, base and the hanger.
Because being used for the A-frame of hoisting heavy, the utility model adopted technique scheme, be that this herringbone gin pole comprises mobile jib, strut and hanger, mobile jib is obliquely installed, the mobile jib middle part is located on the strut top, the bottom of mobile jib and strut is located on the Equipment Foundations member by welding respectively, and hanger is located at described mobile jib top.This herringbone gin pole is simple in structure, and is easy and simple to handle, the hoisting operation that applicable crane lifting service is concentrated, moving range is little, improved lifting operation efficient, reduced the cost of lifting operation, have good economic benefit.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and embodiments:
Fig. 1 is the structural representation that the utility model is used for the A-frame of hoisting heavy.
The specific embodiment
As shown in Figure 1, the A-frame that the utility model is used for hoisting heavy comprises mobile jib 1, strut 2 and hanger 3, described mobile jib 1 is obliquely installed, described mobile jib 1 middle part is located on described strut 2 tops, the bottom of described mobile jib 1 and strut 2 is located on the Equipment Foundations member by welding respectively, and described hanger 3 is located at described mobile jib 1 top.
Further, this herringbone gin pole also comprises base 4, and the bottom of described mobile jib 1 and strut 2 is located on the described base 4 by welding respectively.The movement of this herringbone gin pole is convenient in the setting of base, can as required A-frame be arranged at the correct position of weight lifting.
Further, connect by full weld respectively between above-mentioned mobile jib 1, strut 2, base 4 and the hanger 3, guarantee the reliability that each parts of this herringbone gin pole connect, improve whole rigidity.
This herringbone gin pole is simple in structure, easy to operate, each parts can be gathered materials on the spot in the production scene, get the solid drawn pipe of one section diameter 80mm, 3 meters of length, wall thickness 3.5mm as mobile jib, as strut, hanger of mobile jib top solder is cut the mobile jib top open at one section straight length that cuts oblique groove of this section pipe middle point vertical welding, hanger is mounted to the mobile jib top, then adopts full weld to connect; Base can adopt I-beam section and two block plates to be welded to form, and two block plate balanced weldings consist of the Steady base that supports mobile jib and strut on the edge of a wing at I-beam section two ends.When this herringbone gin pole uses jack is hung on the hanger on mobile jib top, utilize jack to get final product lifting heavy; Can adopt a plurality of gin pole combined hangings for the greater weight object.This herringbone gin pole has higher alerting ability, and at narrow space, in the lifting operation that crane can't be realized, A-frame can replace crane, gives jack with the place of taking root; When some place jack is affiliated to nowhere, then take up an area the suspension centre that less A-frame can provide weight, have stronger practicality; The operating costs of large-scale hoisting machinery has been saved in the simultaneously utilization of this herringbone gin pole, has reduced the cost of lifting operation.
This herringbone gin pole is applied to certain Power Plant and sets up in flue gas desulfur device, the former flue Steel Structure Installation of the improvement engineering process, because former flue Steel Structure Installation is the old support of part utilization, and connection steel structure pillar above the former old flue, top Steel Structure Installation can't realize with crane at all, adopt this herringbone gin pole to take root at steel column, the hoisting steel structure is implemented to install, the problem that releasing can't be installed without the suspender steel structure, greatly improved installation rate, duration has shifted to an earlier date 20 days, saved simultaneously very large manpower, financial resources, material resources.Facts have proved that this herringbone gin pole uses simple, maneuverability, be convenient to move, efficient is high.

Claims (3)

1. A-frame that is used for hoisting heavy, it is characterized in that: this herringbone gin pole comprises mobile jib, strut and hanger, described mobile jib is obliquely installed, described mobile jib middle part is located on described strut top, the bottom of described mobile jib and strut is located on the Equipment Foundations member by welding respectively, and described hanger is located at described mobile jib top.
2. the A-frame for hoisting heavy according to claim 1, it is characterized in that: this herringbone gin pole also comprises base, the bottom of described mobile jib and strut is located on the described base by welding respectively.
3. the A-frame for hoisting heavy according to claim 2 is characterized in that: connect by full weld respectively between described mobile jib, strut, base and the hanger.
CN 201220166386 2012-04-19 2012-04-19 A-framed derrick for hoisting heavy object Expired - Fee Related CN202657866U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220166386 CN202657866U (en) 2012-04-19 2012-04-19 A-framed derrick for hoisting heavy object

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220166386 CN202657866U (en) 2012-04-19 2012-04-19 A-framed derrick for hoisting heavy object

Publications (1)

Publication Number Publication Date
CN202657866U true CN202657866U (en) 2013-01-09

Family

ID=47452787

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220166386 Expired - Fee Related CN202657866U (en) 2012-04-19 2012-04-19 A-framed derrick for hoisting heavy object

Country Status (1)

Country Link
CN (1) CN202657866U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106315425A (en) * 2016-10-12 2017-01-11 上海市政建设有限公司 Reverse buckling type lifting machine and use method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106315425A (en) * 2016-10-12 2017-01-11 上海市政建设有限公司 Reverse buckling type lifting machine and use method thereof

Similar Documents

Publication Publication Date Title
CN203654299U (en) Steel support loose end
CN203795829U (en) Hoop assembly
CN211143305U (en) Steel structure building
CN202899159U (en) Outer hanging type construction elevator foundation
CN202575670U (en) Prefabricated member hoisting tool type lifting beam
CN202564850U (en) Replacement and lifting tool for tubular bus pillar insulator
CN202657866U (en) A-framed derrick for hoisting heavy object
CN202017352U (en) Combined supporting pillar
CN201793330U (en) Gantry hanger frame device
CN204975847U (en) Middle cantilever crane group is to frock tip location support
CN204418658U (en) Integrated hydraulic creeping formwork periphery protection unit
CN203213137U (en) Steel raft foundation for installing steel structure roof
CN202544399U (en) Supporting frame for overhang floor slab with steel structure
CN204896828U (en) Scraper blade is claw for reclaimer
CN201746222U (en) Installation lifting device of cooling wall of furnace shell
CN201794305U (en) Supporting device for elevator shaft mold
CN204173802U (en) Adhesion type mast-up
CN204265208U (en) A kind of segment lifting appliance
CN203728442U (en) Hanging and moving device of prestress tension hydraulic jack
CN203393721U (en) Inner support main purlin component
CN208361754U (en) A kind of derrick crane base steel plinth suspension mounting structure
CN205222519U (en) Simple and easy rotatory bull ladle device
CN204681017U (en) A kind of joist steel upright base
CN202450693U (en) Novel steel truss
CN204221033U (en) The boring fixture of liner plate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: MCC TIANGONG GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: MCC TIANGONG GROUP Corp.,Ltd.

Patentee after: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: CMTCC Shanghai 13th Construction Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20200511

Address after: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Co-patentee after: CHINA MCC20 GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130109

Termination date: 20200419

CF01 Termination of patent right due to non-payment of annual fee