CN202649918U CN 201220228629 CN201220228629U CN202649918U CN 202649918 U CN202649918 U CN 202649918U CN 201220228629 CN201220228629 CN 201220228629 CN 201220228629 U CN201220228629 U CN 201220228629U CN 202649918 U CN202649918 U CN 202649918U
Authority
CN
China
Prior art keywords
power
host computer
control device
control system
electric
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220228629
Other languages
Chinese (zh)
Inventor
李秋明
何伟杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IECONT TECHNOLOGY Inc
Original Assignee
IECONT TECHNOLOGY Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IECONT TECHNOLOGY Inc filed Critical IECONT TECHNOLOGY Inc
Priority to CN 201220228629 priority Critical patent/CN202649918U/en
Application granted granted Critical
Publication of CN202649918U publication Critical patent/CN202649918U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a remote power control device for hosts. A control system of the power control device is respectively electrically connected with an input unit, a time calculator, a memory, a power controller and a signal transmission interface by the aid of a central processing unit, wherein the input unit is capable of inputting command signals, the time calculator is used for controlling time, the memory is used for recording various electronic signals, the power controller is capable of controlling power conversion, and the signal transmission interface is electrically connected to a central control system and used for transmitting the control command signals, the electronic signals and the like. The power controller is provided with an AC-DC power converter, the AC-DC power converter is electrically connected to a power controller of a power supply system, the power controller of the power supply system is provided with power receiving interfaces in an extending manner, the power receiving interfaces are electrically connected with an external power supply, a power supply interface is connected with a plurality of preset hosts, and the preset hosts are respectively connected to the central control system, so that unused time of the hosts and power-off time of the power control device are controlled by the aid of the central control system.

Description

The far end supply control device of host computer
Technical field
The utility model relates to a kind of far end supply control device of host computer, espespecially can be subjected to central managing and control system to control the power control of the unused time of host computer, configuration by control system and electric power system, in the supply of the time of central management and control default internal cutting off power supply, reach control host computer and the purpose of power control electricity consumption time.
Background technology
Along with advancing by leaps and bounds of Technology Times, the innovation of electronics information, development, in living environment, can touch electronics, electric relevant product, not only in daily life, during work or go to school or amusement and recreation etc., more or less all can be applied to electronics, electric product, wherein again with computer and people's life, work or the daily work and rest such as go to school are the most relevant, add the boundless unbounded of world-wide web, be not subjected to the time, the restriction in space, also without hindrance, as long as can finish many work by computer, therefore many work all utilize computer to fulfil assignment, also cause the degree that relies on computer more and more darker, but because the convenience of computer, rapidly, the advantage such as accurately, then tend to produce and be difficult for management and control, the defective such as can't grasp service time, especially in the working environment of large enterprises, easily tens of or the upward application of tuber of stemona computer, in management, quite bother especially, finish in the working time, when computer must shut down rest, need inspect the whether really shutdown of all computers, namely to check for each computer one by one, not only quite consuming time, take a lot of work, all must repeat every day to check, when actual practicing, still there are many defectives and inconvenience:
(1) in the environment of most computer operations, must confirm behind end-of-job whether each computer shuts down, cause inconvenience and puzzlement on the management operations.
(2) the employed computer of most enterprise all can carry out the line of network, if computer does not shut down at unused state, is easily invaded or steal data.
(3) computer is after use, must shut down and generate heat to avoid the energising of host computer or screen or peripheral equipment, easily causes overheated and damages.
(4) host computer still electrically is plugged in commercial power socket with power lead after using, and has the power consumption of stand-by electric, and causes host computer heating, reduction of service life.
(5) use the environment of computer for majority, such as office, library or place to operate schools etc., and the service time that can't manage each computer fully, the situation of the overtime use of computer occurs easily, form the leak of management.
Therefore, how to solve in the present work most computers after use, close problem and the puzzlement of machine check inconvenience, computer does not shut down the defective and inconvenience that cause thermal damage, data easily are stolen or destroy also easily occured, and is the relevant manufacturer that is engaged in the industry and desires most ardently the direction place that research improves.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned defective of the prior art, a kind of far end supply control device of host computer is proposed, with the unused time of effective management and control host computer, the power-off time of power control, reach the purpose of certain management and control shut down of computer, outage.
A kind of far end supply control device of host computer comprises control system, electric power system, wherein:
Described control system is provided with processes the central processing unit of controlling signal, and be electrically connected respectively with central processing unit input block, the time calculator in control time, recording instruction signal and the control signal of input instruction signal memory body, control power supply conversion power supply management and control device and transmit the signal transport interface of electronic signal, and the signal transport interface is the central managing and control system that is electrically connected at transmission management and control command signal, and power supply management and control device then is provided with the AC/DC power converter;
The interchange that described electric power system is electrically connected at control system turns direct current transducer, be provided with and be electrically connected exchange the power-supply controller of electric that turns direct current transducer, and extended respectively to be provided with by power-supply controller of electric and be electrically connected being subjected to electric interface, the power supply base of power supply in default host computer being provided of external power source.
The far end supply control device of the host computer that the utility model proposes, wherein, the input block that the central processing unit of described control system is connected with is keyboard, mouse, telepilot or push switch.
The far end supply control device of the host computer that the utility model proposes, wherein, the signal transport interface of described control system is RJ-45 type connector, fiber-optic signal connector, cable connector, wireless signal, radio frequency signal transmission, ZigBee, BT or Wifi.
The far end supply control device of the host computer that the utility model proposes, wherein, the time calculator of described control system is electrically connected at built-in battery, and described built-in battery is dry cell, lithium battery or rechargeable battery.
The far end supply control device of the host computer that the utility model proposes, wherein, described electric power system be subjected to electric interface, be electrically peg graft attaching plug or the socket of civil power.
The far end supply control device of the host computer that the utility model proposes, wherein, the confession electric interface of described electric power system is socket or the elongation line socket of pegging graft for default computer host power supply line.
The beneficial effects of the utility model are, the control system of the far end supply control device that the utility model proposes, can reach the effect that unused time, the power supply of controlling host computer by the distal center managing and control system control the device power-off time, can really shut down in predetermined time, really cut off the power supply when not using with the management and control host computer.In addition, the power control that the utility model proposes can be cut off the electricity supply after a plurality of default host computers sequentially shut down, a plurality of default host computers can not produce the power consumption situation of stand-by electric, and can really control the Applicative time of all computers, reach good supervisor status.
Description of drawings
Fig. 1 is simple circuit calcspar of the present utility model.
Fig. 2 is the simple circuit calcspar of the utility model preferred embodiment.
Description of reference numerals: 1-power control; The 11-control system; The 111-central processing unit; The 112-input block; The 113-time calculator; The 1131-battery; The 114-memory body; 115-signal transport interface; 116-power supply management and control device; 117-exchanges and turns direct current transducer; The 12-electric power system; The 121-power-supply controller of electric; 122-is subjected to electric interface; 123-is for electric interface; 2-central authorities managing and control system; The 21-delivery interface; The 3-host computer; The 31-linkage interface; 32-power delivery interface.
Embodiment
For reaching above-mentioned purpose and effect, the technological means that the utility model adopts and structure thereof, hereby drawing illustrates in detail that with regard to preferred embodiment of the present utility model its features and functions is as follows, in order to understanding fully.
See also Fig. 1 shown in Figure 2, be the simple circuit calcspar of simple circuit calcspar of the present utility model, preferred embodiment, find out by knowing among the figure, power control 1 of the present utility model comprises control system 11, electric power system 12, wherein:
The control system 11 of this power control 1, be comprise central processing unit (MCU) 111, with input block 112, time calculator 113, memory body 114, signal transport interface 115 and power supply management and control device 116 that central processing unit 111 is electrically connected, recycling power supply management and control device 116 is electrically connected AC/DC converters 117.
The electric power system 12 of this power control 1, comprise power-supply controller of electric 121, with power-supply controller of electric 121 be electrically connected be subjected to electric interface 122 and for electric interface 123.
The control system 11 of above-mentioned power control 1, for be electrically connected at the power-supply controller of electric 121 of electric power system 12 by AC/DC converter 117, and utilize the electric interface 122 that is subjected to of electric power system 12 to be electrically connected at external power source (as: commercial power socket, generator or accumulator etc.), and namely be electrically connected with default host computer 3 for electric interface 123, pass through in addition the signal transport interface 115 of control system 11, be electrically connected at the delivery interface 21 of distal center managing and control system 2, central authorities' managing and control system 2 other delivery interface 21 of recycling, be electrically connected the linkage interface 31 of default host computer 3, can reach the unused time (shutdown after for example setting 5 or 10 minutes) of utilizing the default host computer 3 of central managing and control system 2 controls, and set the power-off time (outage after for example setting 10 or 15 minutes) of power controls 1 by distal center managing and control system 2, and before the unused time, again remind the operation of a plurality of default host computer 3 wishs shutdown, then when default host computer 3 after setting-up time shutdown, the control system 11 of power control 1, the power supply unit 121 of controlling electric power system 12 by central processing unit 111 forms outage, and the power supply that is subjected to electric interface 122 can't be resent to for electric interface 123, after reaching default host computer 3 shutdown, also cut off the power supply for electric interface 123, finish the outage purpose of the utility model power control 1.
The control system 11 of above-mentioned power control 1, its central processing unit 111(MCU) also can be wafer or single-chip etc.; 112 of input blocks can be keyboard, mouse or telepilot or push switch or change-over switch etc., can control or input relevent information to power control 1; Can be electrically connected built-in battery 1131 as for time calculator 113, and battery 1131 namely can be dry cell, lithium battery or rechargeable battery etc.; Signal transport interface 115 then can be RJ-45 pattern connector, fiber-optic signal connector or cable connector etc.; Again, the plug that can be by electric interface 122 to connect civil power of electric power system 12 or socket etc.; Be supply socket or elongation line socket etc. for electric interface 123.
And power control 1 of the present utility model, can be electrically connected a default host computer 3, can utilize distal center managing and control system 2 to be connected with a plurality of power controls 1, default host computer 3 by transmission line or wireless transmission (also can transmit [ RF ], ZigBee, BT or Wifi etc. by wireless signal, the radio frequency signal of wireless transmission) respectively, reach the purpose of management and control.
And utilize a plurality of for electric interface 123 of power control 1, be electrically connected at respectively a plurality of default host computers 3 power delivery interfaces 32, pass through again the linkage interface 31 of a plurality of default host computers 3, the signal transport interface 115 of power control 1, be connected to each delivery interface 21 of distal center managing and control system 2, distal center managing and control system 2 and can be middle control host computer or servomechanism main frame etc., so that a plurality of default host computers 3, a plurality of power controls 1, all be subject to controlling of distal center managing and control system 2, namely by a plurality of default host computers 3 of distal center managing and control system 2 centralized control, a plurality of power controls 1, needn't inspect one by one most default host computers 3, and default host computer 3 also is difficult for being invaded or steal data, reaches to save time, the effect of saving of labor and security protection; And central managing and control system 2 and a plurality of default host computer 3 have the program [ such as Microsoft's operating system ] of operating system in all, can be for carrying out various controlling and document processing.
A plurality of default host computers 3, for being electrically connected respectively power control 1, when each default host computer 3 normal operation, the electric power system 12 of power control 1 is with power-supply controller of electric 121, control and be subjected to electric interface 122 to connect external power source (can be civil power or generator etc.) power supply, again by being sent to default host computer 3 for electric interface 123, the required electric energy of default host computer 3 runnings of supply; And power control 1 is at required electric energy of when running, can be by being subjected to electric interface 122 to obtain outside power supply, and after power-supply controller of electric 121 is sent to AC/DC converter 117 and carries out current conversion, with the required electric energy of direct current supply power control 1.
And distal center managing and control system 2 wants to control a plurality of default host computers 3, during a plurality of power control 1, utilize distal center managing and control system 2 through delivery interface 21, linkage interface 31 is controlled a plurality of default host computers 3, set respectively the unused time (such as 5 minutes or 8 minutes or other times etc.) of each default host computer 3, again by delivery interface 21, signal transport interface 115, set respectively a plurality of power controls 1, via signal transport interface 115 power-off time (such as 10 minutes or 15 minutes etc.) is sent to time calculator 113 and memory body 114 by central processing unit 111, and before the unused time arrives, power supply control device 1 again the information of issue shutdown to each host computer 3, really to reach the preparation work of proposing province's shutdown; Namely after arriving default power-off time, time calculator 11
3 transfer to central processing unit 111 with signal, pass through power supply management and control device 116 for central processing unit 111, AC/DC converter 117, power-supply controller of electric 121 to electric power system 12 is controlled, make and be subjected to electric interface 122 no longer to send electricity to supplying electric interface 123, so that supply again supplying power for outside of electric interface 123, form off-position, can guarantee after a plurality of default host computer 3 shutdown, what a plurality of default host computers 3 were electrically connected respectively also cuts off the power supply for electric interface 123, no longer to a plurality of default host computer 3 power supplies, avoid a plurality of default host computers 3 because of the connection power supply source, and form the standby power consumption situation that continues to consume electric energy; And a plurality of power controls 1, also can supply respectively the peripheral equipment (as: screen, scanner, printer or action storage device or multimedia memory apparatus etc.) of a plurality of default host computers 3, then after power control 1 outage, each peripheral equipment also is off-position, can not form the consumption stand-by electric, can avoid waste of energy, and for also unlikely generation standby power consumption and generate heat and can increase the service life of a plurality of default host computers 3 outage heat radiations, peripheral equipment, guarantee that a plurality of default host computers 3 can cool off, dispel the heat with peripheral equipment.
Therefore, the above only is preferred embodiment of the present utility model, non-so limit to claim of the present utility model, power control 1 of the present utility model, central processing unit 111 by control system 11, the power-supply controller of electric 121 of control electric power system 12, receive the power-off time signal of distal center managing and control system 2 with signal transport interface 115 when the control system 11 of power control 1, transmit signals to time calculator 113 and memory body 114, and control a plurality of default host computers 3 in distal center managing and control system 2, sequentially shutdown after the schedule time, and before unused time arrival, remind shutdown that time is nearly up by 1 pair of each default host computer 3 of power control, and by the time calculator 113 of control system 11 after receiving signal time and arriving, by central processing unit 111 through power supply management and control device 116, AC/DC converter 117, power-supply controller of electric 121 to electric power system 12 is controlled, utilize power-supply controller of electric 121 controls to be subjected to electric interface 122, no longer send electricity to supplying electric interface 123, to default host computer 3 outages that are electrically connected for electric interface 123, after reaching default computer machine 3 shutdown, outside power supply source also cuts off the power supply and no longer produces the purpose of standby power consumption situation, and guarantee that default host computer 3 shuts down fully, the effect that difficult quilt is invaded, therefore such as can reach the structure of aforementioned effect, device is contained by the utility model all should, the simple and easy modification of this kind and equivalent structure change, all should in like manner be contained in the claim of the present utility model, close and give Chen Ming.
The far end supply control device of above-mentioned host computer of the present utility model can have following advantage when reality is used, as:
(1) after default computer machine 3 shutdown, cut off power supply source by power control 1 again, really default host computer 3 or peripheral equipment etc. do not produce standby power consumption, namely unlikelyly cause fever phenomenon, serviceable life also longer.
(2) after default host computer 3 shutdown, also cut off the electricity supply by power control 1, then default host computer 3 namely is difficult for being invaded, be difficult for stealing data again.
(3) power control 1 and default host computer 3, all be electrically connected at distal center managing and control system 2, and by 1 outage of distal center managing and control system 2 power supply controlling control device, 3 shutdown of default host computer, do not recycle and manually inspect, have the function of time and labour saving.
(4) distal center managing and control system 2 power supply controlling control device 1 outage, 3 shutdown of default host computer, before the unused time arrived, power control 1 can be reminded default host computer 3 again, the unused time near, for the preparation work before shutting down.
Therefore; the utility model designs mainly for the power-down mode of host computer; to utilize power control to be electrically connected to respectively the distal center managing and control system; default host computer; controlling default host computer when the distal center managing and control system shut down after the schedule time; and the power supply controlling control device was cut off the electricity supply after the schedule time; and the notice of before the unused time arrives, reminding; for default host computer after the time arrives shutdown; power control also cuts off power supply; can not produce standby power consumption and can reach default host computer; really reaching the shutdown purpose is main key protection point; can be by power control and a plurality of default host computer of distal center managing and control system to being electrically connected; effectively cut off the power supply and the setting of shutting down; operation; be after only making the power control outage; the advantage of avoiding default host computer to generate heat because of standby power consumption or invaded; and effectively the pass machine operation of host computer is preset in management and control, reaches the effect of time and labour saving.
Above explanation is just illustrative for the utility model; and it is nonrestrictive; those of ordinary skills understand; in the situation that does not break away from the spirit and scope that following claims limit; can make many modifications; change, or equivalence, but all will fall in the protection domain of the present utility model.

Claims (6)

1. the far end supply control device of a host computer is characterized in that, comprises control system, electric power system, wherein:
Described control system is provided with processes the central processing unit of controlling signal, and be electrically connected respectively with central processing unit input block, the time calculator in control time, recording instruction signal and the control signal of input instruction signal memory body, control power supply conversion power supply management and control device and transmit the signal transport interface of electronic signal, and the signal transport interface is the central managing and control system that is electrically connected at transmission management and control command signal, and power supply management and control device then is provided with the AC/DC power converter;
The interchange that described electric power system is electrically connected at control system turns direct current transducer, be provided with and be electrically connected exchange the power-supply controller of electric that turns direct current transducer, and extended respectively to be provided with by power-supply controller of electric and be electrically connected being subjected to electric interface, the power supply base of power supply in default host computer being provided of external power source.
2. the far end supply control device of host computer according to claim 1 is characterized in that, the input block that the central processing unit of described control system is connected with is keyboard, mouse, telepilot or push switch.
3. the far end supply control device of host computer according to claim 1, it is characterized in that, the signal transport interface of described control system is RJ-45 type connector, fiber-optic signal connector, cable connector, wireless signal, radio frequency signal transmission, ZigBee, BT or Wifi
4. the far end supply control device of host computer according to claim 1 is characterized in that, the time calculator of described control system is electrically connected at built-in battery, and described built-in battery is dry cell, lithium battery or rechargeable battery.
5. the far end supply control device of host computer according to claim 1 is characterized in that, described electric power system be subjected to electric interface, be electrically peg graft attaching plug or the socket of civil power.
6. the far end supply control device of host computer according to claim 1 is characterized in that, the confession electric interface of described electric power system is socket or the elongation line socket of pegging graft for default computer host power supply line
CN 201220228629 2012-05-21 2012-05-21 Remote power control device for hosts Expired - Fee Related CN202649918U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220228629 CN202649918U (en) 2012-05-21 2012-05-21 Remote power control device for hosts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220228629 CN202649918U (en) 2012-05-21 2012-05-21 Remote power control device for hosts

Publications (1)

Publication Number Publication Date
CN202649918U true CN202649918U (en) 2013-01-02

Family

ID=47419000

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220228629 Expired - Fee Related CN202649918U (en) 2012-05-21 2012-05-21 Remote power control device for hosts

Country Status (1)

Country Link
CN (1) CN202649918U (en)

Similar Documents

Publication Publication Date Title
TWI420295B (en) Power saving apparatus and power saving method thereof
TWI309765B (en) Method and apparatus for controlling power supply in a computer system
US8862916B2 (en) Wireless control of power sockets based on host and signal quality
JP4980735B2 (en) Power supply apparatus and power supply system
CN104953694B (en) Power distribution system
CN103645686A (en) An electric appliance remote control system based on a cloud platform and a method
CN104520783A (en) Standby power interception apparatus for computer and computer peripheral device
WO2018157689A1 (en) Method for implementing low power consumption on standby for bluetooth security device and bluetooth security device
CN201503967U (en) Power supply and network connecting wire integrated control device of extension line socket
CN102437917B (en) A kind of network wake-up method, network wake-up device and computer
CN202077124U (en) Television and standby control circuit thereof
CN201174090Y (en) Electricity supplying adapter for notebook type computer
CN202649918U (en) Remote power control device for hosts
CN201345558Y (en) Off-line UPS
CN105320905B (en) A kind of multi-function device for ensureing Computer Data Security
CN201876687U (en) Automatic power-off control system
CN107911876A (en) There is the solar energy auxiliary power supply wireless access point of reference record
CN102314152B (en) Energy saving device and energy saving method thereof
CN208572452U (en) A kind of super low-power consumption wifi- serial ports transparent transmission conversion module
CN205450174U (en) A communication protocol conversion equipment for fault indicator maintenance
US20130339768A1 (en) Ip power controller
CN100378606C (en) Integrated multi-and single-machine system power supply control apparatus and method thereof
CN102811128B (en) The power-economizing method of power-supply controller of electric, power control and power control
CN205177006U (en) MBUS mode intelligence water gauge hander
CN201674070U (en) Energy-saving power supply flashboard device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130102

Termination date: 20140521