CN202614283U CN 201220205588 CN201220205588U CN202614283U CN 202614283 U CN202614283 U CN 202614283U CN 201220205588 CN201220205588 CN 201220205588 CN 201220205588 U CN201220205588 U CN 201220205588U CN 202614283 U CN202614283 U CN 202614283U
Authority
CN
China
Prior art keywords
data
natural gas
workstation
acquisition unit
gas metering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220205588
Other languages
Chinese (zh)
Inventor
周文奇
李典基
李因东
黄彩琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Huahan Electronic Co Ltd
Original Assignee
JINAN HUAHAN ELECTRIC TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JINAN HUAHAN ELECTRIC TECHNOLOGY Co Ltd filed Critical JINAN HUAHAN ELECTRIC TECHNOLOGY Co Ltd
Priority to CN 201220205588 priority Critical patent/CN202614283U/en
Application granted granted Critical
Publication of CN202614283U publication Critical patent/CN202614283U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model discloses a building natural gas supervisory system. The building natural gas supervisory system is characterized by comprising a group of natural gas metering devices. Each natural gas metering device is connected with a gateway which is connected with a data communication network. The data communication network is connected with a data acquisition unit which is connected with a data server and a workstation. The data server is connected with a web server and the workstation. According to the building natural gas supervisory system, the natural gas metering devices are utilized for collection of natural gas use amount information which is stored in a data base through the data acquisition unit to facilitate inquiry of the workstation at any time and provide original data and information for a decision analysis system of the workstation. The data acquisition unit is mainly responsible for collecting data from the natural gas metering devices, decoding and processing the data, and transmitting control data, time data or other required data from the system to a front end natural gas metering device.

Description

A kind of buildings rock gas supervisory systems
Technical field
The utility model relates to a kind of rock gas supervisory systems, specifically, relates to a kind of buildings rock gas supervisory systems.
Background technology
China is energy big country, but energy consumption big country especially.With abroad compare, China's economic growth at a high speed is based upon on high energy consumption, the heavily contaminated basis, thereby develops a circular economy, it is extremely urgent to build a resource-conserving society.Colleges and universities are that resource is occupied and major power consumer, and annual charges for water and electricity spending also has millions of units at least all in up to ten million units, and saving has a high potential.All in emphasical energy-conservation today, the best technological, the talent that colleges and universities converge collects the important task of cultivation and education, more should advocate the wind of energy savings resource, to the greatest extent the duty of energy savings resource in the whole world.
The Ministry of Education has issued in May, 2008 specially: " about advancing the construction of institution of higher education economizing type campus; Further strengthen the suggestion of institution of higher education's energy-saving and water-saving work " file and " institution of higher education's economizing type campus implementation management and technological guide rule ", instruct the energy-saving and emission-reduction work of colleges and universities.
Carry out colleges and universities' energy-saving and emission-reduction work; It is crucial doing energy measurement work well; But colleges and universities do not reach the requirement of administration of energy conservation as yet at the gage work of aspects such as water, electricity, heating mostly; Because can not putting in place of gage work, corresponding energy consumption analysis and efficiency analytical work just can't be implemented.Remove the problem of metering facility aspect, key still is that disappearance and supervision, supervisor's work of system is not in place.Also water meter has been installed except operational department by some school, office building, and water meter is not adorned in classroom and laboratory etc., and dwelling house for staff and workers water power table damages and can not in time change, and causes school and the dual waste of country at the energy, resource and fund aspect at last.This is the weak point of prior art.
The utility model content
The technical matters that the utility model will solve provides a kind of buildings rock gas supervisory systems, and the water consumption of buildings is measured, and is convenient to control and management.
The utility model adopts following technological means to realize goal of the invention:
A kind of buildings rock gas supervisory systems; It is characterized in that: comprise one group of gas metering instrument; Said each gas metering instrument connects gateway, and said gateway is connected to data communication network, and said data communication network is connected to data acquisition unit; Said data acquisition unit connects data server and workstation, and said data server connects WEB server and said workstation.
As the further qualification to the present technique scheme, said workstation is a microcomputer, and said microcomputer is provided with large screen display, internal storage and external memory storage.
Compared with prior art; The advantage and the good effect of the utility model are: the utility model utilizes gas metering instrument to collect rock gas consumption information; Be archived to data database through data acquisition unit; Being convenient to workstation inquires about at any time; For the decision analysis system of workstation provides raw data and information, data acquisition unit is mainly born system from gas metering instrument to collect data, decoding, process data, from system, takes control data, time data or other to require data to send in the front end gas metering instrument.Workstation has the stronger information processing function and high performance figure, image processing function and network savvy; Through patterned interface supervisory control system running situation; Browse in real time and historical data, curve; Through workstation clearly display frame and historical record, so that the staff analyzes timely and handles.
Description of drawings
Fig. 1 is the functional-block diagram of the utility model preferred embodiment.
Embodiment
Below in conjunction with accompanying drawing and preferred embodiment the utility model is made detailed description further.
Referring to Fig. 1; The utility model comprises gas metering instrument, gateway, data acquisition unit, data server, workstation and WEB server; Said gas metering instrument is connected to data acquisition unit through data communication network; Said data acquisition unit connects data server and workstation, and said data server connects WEB server and said workstation.
Said workstation is a microcomputer, and said microcomputer is provided with large screen display, internal storage and external memory storage.
The utility model utilizes gas metering instrument to collect water consumption information; Be archived to data database through data acquisition unit; Being convenient to workstation inquires about at any time; For the decision analysis system of workstation provides raw data and information, data acquisition unit is mainly born system from water gauge image data, decoding, process data, from system, takes control data, time data or other to require data to send in the front end water gauge.Workstation has the stronger information processing function and high performance figure, image processing function and network savvy; Through patterned interface supervisory control system running situation; Browse in real time and historical data, curve; Through workstation clearly display frame and historical record, so that the staff analyzes timely and handles.
Certainly; Above-mentioned explanation is not the restriction to the utility model; The utility model also be not limited only to above-mentioned for example, variation, remodeling, interpolation or replacement that those skilled in the art are made in the essential scope of the utility model also belong to the protection domain of the utility model.

Claims (2)

1. buildings rock gas supervisory systems; It is characterized in that: comprise one group of gas metering instrument; Said each gas metering instrument connects gateway, and said gateway is connected to data communication network, and said data communication network is connected to data acquisition unit; Said data acquisition unit connects data server and workstation, and said data server connects WEB server and said workstation.
2. according to the said buildings rock gas of claim 1 supervisory systems, it is characterized in that: said workstation is a microcomputer, and said microcomputer is provided with large screen display, internal storage and external memory storage.
CN 201220205588 2012-05-09 2012-05-09 Building natural gas supervisory system Expired - Lifetime CN202614283U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220205588 CN202614283U (en) 2012-05-09 2012-05-09 Building natural gas supervisory system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220205588 CN202614283U (en) 2012-05-09 2012-05-09 Building natural gas supervisory system

Publications (1)

Publication Number Publication Date
CN202614283U true CN202614283U (en) 2012-12-19

Family

ID=47347973

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220205588 Expired - Lifetime CN202614283U (en) 2012-05-09 2012-05-09 Building natural gas supervisory system

Country Status (1)

Country Link
CN (1) CN202614283U (en)

Similar Documents

Publication Publication Date Title
CN102969796B (en) Near-real-time electric quantity monitoring and dispatching management system for rural power grid
CN105373971A (en) Method of building energy efficiency management on the basis of big data
CN103268115A (en) Power demand side monitoring system and method
CN204145547U (en) A kind of building energy consumption management system for monitoring
CN202522906U (en) Comprehensive electric energy information collector based on photovoltaic power station information system
CN202166890U (en) Environment online automatic monitoring intelligent data collection instrument
CN202614283U (en) Building natural gas supervisory system
CN204270121U (en) A kind of multifunctional data acquiring terminal
CN202939473U (en) Energy-saving technology modification and water-saving project information management system for enterprise
CN202615456U (en) Building water energy monitoring system
CN203811206U (en) Enterprise carbon discharge metering and analysis device
CN202205394U (en) Practical training device for building energy conservation and energy consumption data acquisition
CN205102859U (en) With ability safety monitoring and optimizing system
CN202617168U (en) Building electricity monitoring system
CN204271740U (en) A kind of data collection station of duplicate supply input
CN103309302A (en) TD-LET (Time Division-Long Term Evolution) network-based environment monitoring system
CN203337211U (en) Power-saving underground water level monitoring system used in field
CN203259855U (en) TD-LTE network-based environment monitoring system
CN203706409U (en) Data acquisition and remote transmission equipment applied to multiple external interfaces
Zhao et al. Building energy consumption monitoring system in the application of conservation-oriented campus
CN202495141U (en) Multipurpose meter reading concentrator
CN104460616A (en) Multifunctional data collection terminal
CN204332043U (en) A kind of sewage on-line monitoring system
CN204065201U (en) A kind of electric energy meter remaining sum display device
CN103927690A (en) Remote energy efficiency assessment system and method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: Room 409-414, 4th floor, Building A, Shandong Institute of Information and Communication, No. 1768 Xinlu Street, Jinan High-tech Zone, Shandong Province, 250101

Patentee after: Shandong HUAHAN Electronic Co. Ltd.

Address before: Room 001 and 002, Block C, 4th floor, 747 Shunhua Road, Jinan High-tech Zone, Shandong Province, 250101

Patentee before: Jinan Huahan Electric Technology Co., Ltd.

CP03 Change of name, title or address
CX01 Expiry of patent term

Granted publication date: 20121219

CX01 Expiry of patent term