CN202611334U - Connecting piece for guardrail - Google Patents
Connecting piece for guardrail Download PDFInfo
- Publication number
- CN202611334U CN202611334U CN 201120461750 CN201120461750U CN202611334U CN 202611334 U CN202611334 U CN 202611334U CN 201120461750 CN201120461750 CN 201120461750 CN 201120461750 U CN201120461750 U CN 201120461750U CN 202611334 U CN202611334 U CN 202611334U
- Authority
- CN
- China
- Prior art keywords
- guardrail
- base
- connector
- utility
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model relates to a connecting piece for a guardrail, being used for fixedly connecting a guardrail column with a guardrail crossbeam. The connecting piece is provided with a base fixed with the guardrail column, a sleeve pipe molded with the base as a whole and suitable for being sleeved onto the guardrail crossbeam; and fixing holes arranged on the base. The connecting piece for the guardrail is simple in structure and is capable of fixedly connecting the guardrail column with the guardrail crossbeam rapidly.
Description
Technical field
The utility model relates to the technical field of connector, and especially a kind of guardrail that can fast fence upright be fixedly connected with guardrail cross beams is used connector.
Background technology
Guardrail is visible everywhere in our daily life, and it mainly is used for to the protection of equipment and facilities and protection.Generally, fence upright and guardrail cross beams are welded to connect, in order to guarantee safety of construction; The process of welding generally need be carried out at special production department; Become the product cycle longer, the finished product that welding is good need be shipped to the place of use, and such transportation is obviously inconvenient; When if damaging appears in fence upright and guardrail cross beams simultaneously, repair very inconvenient.
The utility model content
The technical problem that the utility model will solve is: in order to solve the problem that proposes in the above-mentioned background technology; The utility model provides a kind of guardrail to use connector; It can be fixed together fence upright and guardrail cross beams fast, and is with short production cycle, simple in structure.
The utility model solves the technical scheme that its technical problem adopted: a kind of guardrail is used connector; Be used for fixing and connect fence upright and guardrail cross beams; Have with the fixing base of fence upright and with base one-body molded and with the sleeve pipe that the guardrail cross beams socket is complementary, offer fixing hole on the base.
Further: connector is one time punching molded by steel material.
Further: the quantity of the fixing hole of offering on the base is four.
The beneficial effect of the utility model: the guardrail of the utility model is fixedly connected with fence upright through the fixing hole on the base with the base of connector; Sleeve pipe and guardrail cross beams connect together; Connector can be fixed together fence upright and guardrail cross beams fast; The cycle of producing has shortened greatly, and connector is one time punching molded by steel material simultaneously, very simple of structure.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the utility model is further specified.
Fig. 1 is the structural representation of the utility model;
Fig. 2 is the vertical view of Fig. 1.
Among the figure 1, base, 2, sleeve pipe, 3, fixing hole.
The specific embodiment
Combine accompanying drawing that the utility model is done further detailed explanation now.These accompanying drawings are the sketch map of simplification, the basic structure of the utility model only is described in a schematic way, so it only show the formation relevant with the utility model.
Guardrail as depicted in figs. 1 and 2 is used connector, is used for fixing to connect fence upright and guardrail cross beams, have with the fixing base 1 of fence upright and with base 1 one-body molded and with the sleeve pipe 2 that the guardrail cross beams socket is complementary, offer fixing hole 3 on the base 1.Can link together fast through connector fence upright and guardrail cross beams, the production cycle shortens greatly.
Wherein connector is one time punching molded by steel material, and structure is very simple; The quantity of the fixing hole of offering on the base 13 is four, also can be two, six, eight etc.
With above-mentioned desirable embodiment according to the utility model is enlightenment, and through above-mentioned description, the related work personnel can carry out various change and modification fully in the scope that does not depart from this utility model technological thought.The technical scope of this utility model is not limited to the content on the manual, must confirm its technical scope according to the claim scope.
Claims (3)
1. a guardrail is used connector; Be used for fixing and connect fence upright and guardrail cross beams; It is characterized in that: have with the fixing base (1) of fence upright and with base (1) one-body molded and with the sleeve pipe (2) that the guardrail cross beams socket is complementary, offer fixing hole (3) on the base (1).
2. guardrail according to claim 1 is used connector, it is characterized in that: said connector is one time punching molded by steel material.
3. guardrail according to claim 1 is used connector, it is characterized in that: the quantity of the fixing hole of offering on the said base (1) (3) is four.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120461750 CN202611334U (en) | 2011-11-19 | 2011-11-19 | Connecting piece for guardrail |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120461750 CN202611334U (en) | 2011-11-19 | 2011-11-19 | Connecting piece for guardrail |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202611334U true CN202611334U (en) | 2012-12-19 |
Family
ID=47345044
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201120461750 Expired - Fee Related CN202611334U (en) | 2011-11-19 | 2011-11-19 | Connecting piece for guardrail |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202611334U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105386640A (en) * | 2015-12-14 | 2016-03-09 | 张家港博盛金属制品有限公司 | Spliced upright post |
CN112695967A (en) * | 2020-12-28 | 2021-04-23 | 广州苏记铁器装饰工程有限公司 | Assembled railing and manufacturing and assembling process thereof |
-
2011
- 2011-11-19 CN CN 201120461750 patent/CN202611334U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105386640A (en) * | 2015-12-14 | 2016-03-09 | 张家港博盛金属制品有限公司 | Spliced upright post |
CN112695967A (en) * | 2020-12-28 | 2021-04-23 | 广州苏记铁器装饰工程有限公司 | Assembled railing and manufacturing and assembling process thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105292678B (en) | A kind of pallet | |
CN202611334U (en) | Connecting piece for guardrail | |
CN202924576U (en) | Lifting tool for totally enclosed bus conductor | |
CN201655133U (en) | Transmission tower model for assembly installation training | |
CN205383424U (en) | Double pin C type structure carrier bar | |
CN203701702U (en) | Splicing type dustproof shed | |
CN203623938U (en) | Combined type standard module for ocean platform | |
CN203091609U (en) | Multifunctional steel bar hoop machining device | |
CN202450545U (en) | Foundation structure for natural gas filling station of natural gas compressor | |
CN203124797U (en) | Drilling die holder | |
CN202659238U (en) | Bolted shield tunneling starting bracket | |
CN204419469U (en) | A kind of tower cylinder connection set for Large-scale Wind Turbines | |
CN203961022U (en) | The syndeton of a kind of floor and post | |
CN203171154U (en) | Lower inner wall protection tool for final circumferential weld polishing | |
CN204160337U (en) | A kind of shot-blasting machine auxiliary mould | |
CN204800600U (en) | A support for placing rod iron raw materials | |
CN202474571U (en) | Low-voltage switch framework | |
CN205220489U (en) | Split type semi -mounted tank car | |
CN202291970U (en) | Anti-toppling device for manufacturing H-shaped steel | |
CN201744831U (en) | Device for quick removal of axile spare part | |
CN204893899U (en) | A dismantle tool for rubber injection machine | |
CN202172216U (en) | Composite grounding module | |
CN202431027U (en) | Quickly-assembled composite support stage frame | |
CN206415420U (en) | Guiding trestle for medicine core charging basket | |
CN204975196U (en) | Modular forging work platform of bending |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121219 Termination date: 20151119 |
|
EXPY | Termination of patent right or utility model |