CN202611262U - Deviation-rectifying sleeve of embedded bolt of concrete foundation - Google Patents

Deviation-rectifying sleeve of embedded bolt of concrete foundation Download PDF

Info

Publication number
CN202611262U
CN202611262U CN 201220162615 CN201220162615U CN202611262U CN 202611262 U CN202611262 U CN 202611262U CN 201220162615 CN201220162615 CN 201220162615 CN 201220162615 U CN201220162615 U CN 201220162615U CN 202611262 U CN202611262 U CN 202611262U
Authority
CN
China
Prior art keywords
embedded bolt
overcoat
deviation
concrete foundation
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220162615
Other languages
Chinese (zh)
Inventor
连贺
伍兵
周飞
龙维良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN 201220162615 priority Critical patent/CN202611262U/en
Application granted granted Critical
Publication of CN202611262U publication Critical patent/CN202611262U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a deviation-rectifying sleeve of an embedded bolt of a concrete foundation and relates to the field of construction device of the concrete foundations of buildings. The deviation-rectifying sleeve comprises an outer sleeve and a metal framework, wherein the outer sleeve is barrel-shaped and is provided with a vertical through hole, and the embedded bolt can penetrate through the through hole. The metal framework is fixed inside an outer sleeve wall, the upper end of the metal framework extends out of the upper portion of the outer sleeve, and the extended portion of the upper end of the metal framework is provided with a pulling connection point for pulling the outer sleeve with external force. The deviation-rectifying sleeve can solve the problem of difficult adjustment of the embedded bolt due to concrete setting, enable the embedded bolt to be finely adjusted in the front direction, the back direction, the left direction and the right direction, improve the embedding accuracy of the embedded bolt, enable a bolt to be embedded in one time and improve the work efficiency.

Description

Concrete foundation pre-embedded bolt correction cover
Technical field
The utility model relates to the concrete foundation construction equipment of building, particularly concrete foundation pre-embedded bolt correction cover.
Background technology
Along with the fast development of Chinese national economy, all kinds of large industry equipments are installed and the large-scale steel structure factory building constantly increases, and the pre-buried quantity of pre-embedded bolt of all kinds of concrete foundations (especially large industry equipment concrete foundation) is more and more huger.In the prior art, concrete foundation erection bolt mode mainly contains two kinds: one of which, and the prepared screw-bolt hole erection bolt, this kind mode receives the construction quality factor affecting more, and back yard industry equipment is taked this mode more; Its two, pre-embedded bolt, large industry equipment vibrations are big, quality is big, rotating speed is high, generally adopts pre-embedded bolt.Large equipment base pre-embedded bolt specification is many, quantity is big and construction precision requires highly, has produced bigger deviation and will influence directly that equipment is installed, operation in case indivedual bolt is pre-buried, influences installation progress and production time.
In the pre-buried process of bolt, usually run into following problem: after having built concrete, find that pre-embedded bolt has little deviation; In order to guarantee pre-buried precision; Minimizing is done over again because of the installation that pre-buried precision problem brings, and people urgently hope after concrete final set, can also finely tune bolt.
The utility model content
The technical problem that the utility model will solve is to above-mentioned deficiency of the prior art; A kind of concrete foundation pre-embedded bolt correction cover is provided; This correction cover can be eliminated the adjusting difficulty because of pre-embedded bolt after the concrete setting, makes pre-embedded bolt can carry out the fine setting of front, rear, left and right four direction, and can improve the pre-buried precision of pre-embedded bolt; The pre-buried once one-tenth of bolt is lived, increase work efficiency.
For solving the problems of the technologies described above, the technical scheme of the utility model is: a kind of concrete foundation pre-embedded bolt correction cover comprises overcoat and metallic framework; Overcoat is tubular, is provided with the through hole of up/down perforation, and pre-embedded bolt can pass from this through hole; Metallic framework is fixed in the overcoat wall, and extend out to the overcoat top on the metallic framework, and this metallic framework upper end extension is provided with and is used for socketing a little of external force pulling overcoat.
The beneficial effect of the utility model is: in concrete pouring construction, pre-embedded bolt is put carry out concreting again after correction is overlapped earlier, after concrete final set; A little pull out overcoat through socketing of metallic framework of external force pulling; If the pre-embedded bolt precision has deviation, can realize the fine setting of the horizontal front, rear, left and right of pre-embedded bolt four direction, if the pre-embedded bolt precision meets the demands; Then gap between pre-embedded bolt and the concrete (being the shared volume of overcoat) grouting is filled and handle; Thereby the utility model can improve the pre-buried precision of pre-embedded bolt, makes that bolt is pre-buried once to be become to live, and increases work efficiency.
Description of drawings
Below in conjunction with the accompanying drawing and the specific embodiment the utility model is done further detailed explanation.
Fig. 1 is the overall structure sketch map of the utility model.
Fig. 2 combines the user mode sketch map of pre-embedded bolt in concrete for the utility model.
Among the figure, 1. correction is overlapped; 11. overcoat; 12. metallic framework; 121. socket a little; 13. through hole; 2. pre-embedded bolt; 3. concrete.
The specific embodiment
As depicted in figs. 1 and 2, concrete foundation pre-embedded bolt correction cover 1 comprises overcoat 11 and metallic framework 12; Overcoat 11 is tubular, is provided with the through hole 13 of up/down perforation, and pre-embedded bolt 2 can pass from this through hole 13; Metallic framework 12 is fixed in overcoat 11 walls, and metallic framework 12 upper ends extend out to overcoat 11 tops, these metallic framework 12 upper end extensions be provided be used for external force pulling overcoat 11 socket a little 121.
As depicted in figs. 1 and 2, in technique scheme, the shape of metallic framework 12 is spring shape.
As the optimal way of technique scheme, said overcoat 11 is preferably rubber sleeve, said metal
Skeleton 12 is preferably steel frame.
As shown in Figure 2; In concrete 3 pouring constructions, earlier pre-embedded bolt 2 is put and carry out concrete 3 again behind the correction cover 1 and build, after concrete 3 final set; 121 pull out overcoat 11 through socketing a little of metallic framework 12 of external force pulling; With after these overcoat 11 taking-ups pre-embedded bolt 2 being measured,, can carry out the fine setting (laterally pulling pre-embedded bolt 2) of forward and backward, left, the swollen four direction of level to pre-embedded bolt 2 if pre-embedded bolt 2 precision have deviation; If pre-embedded bolt 2 precision meet the demands, then gap between pre-embedded bolt 2 and the concrete 3 (being overcoat 11 shared volumes) grouting is filled and handle.
The above only is the utility model preferred embodiments, and every any trickle modification, equivalent variations and modification of above embodiment being done according to the technical scheme of the utility model all belongs in the scope of the utility model technical scheme.

Claims (4)

1. concrete foundation pre-embedded bolt correction cover is characterized in that: comprise overcoat and metallic framework; Overcoat is tubular, is provided with the through hole of up/down perforation, and pre-embedded bolt can pass from this through hole; Metallic framework is fixed in the overcoat wall, and extend out to the overcoat top on the metallic framework, and this metallic framework upper end extension is provided with and is used for socketing a little of external force pulling overcoat.
2. concrete foundation pre-embedded bolt correction cover according to claim 1, it is characterized in that: the shape of said metallic framework is spring shape.
3. concrete foundation pre-embedded bolt correction cover according to claim 1 is characterized in that: said
Overcoat is a rubber sleeve.
4. according to claim 1 or 2 or 3 described concrete foundation pre-embedded bolt correction covers, it is characterized in that: said metallic framework is a steel frame.
CN 201220162615 2012-04-17 2012-04-17 Deviation-rectifying sleeve of embedded bolt of concrete foundation Expired - Fee Related CN202611262U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220162615 CN202611262U (en) 2012-04-17 2012-04-17 Deviation-rectifying sleeve of embedded bolt of concrete foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220162615 CN202611262U (en) 2012-04-17 2012-04-17 Deviation-rectifying sleeve of embedded bolt of concrete foundation

Publications (1)

Publication Number Publication Date
CN202611262U true CN202611262U (en) 2012-12-19

Family

ID=47344972

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220162615 Expired - Fee Related CN202611262U (en) 2012-04-17 2012-04-17 Deviation-rectifying sleeve of embedded bolt of concrete foundation

Country Status (1)

Country Link
CN (1) CN202611262U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113006288A (en) * 2021-03-03 2021-06-22 重庆科技学院 Integral positioning device for embedded counter-force ground anchor and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113006288A (en) * 2021-03-03 2021-06-22 重庆科技学院 Integral positioning device for embedded counter-force ground anchor and construction method
CN113006288B (en) * 2021-03-03 2022-09-23 重庆科技学院 Integral positioning device for embedded counter-force ground anchor and construction method

Similar Documents

Publication Publication Date Title
CN205735482U (en) A kind of structure of fixing built-in fitting
CN203270599U (en) Foundation bolt pre-buried die
CN204645333U (en) Fabricated shear wall levels syndeton
CN202611262U (en) Deviation-rectifying sleeve of embedded bolt of concrete foundation
CN204098489U (en) A kind of mould making concrete floorslab preformed hole
CN204212442U (en) A kind of hi-Fix guiding device
CN103031892B (en) Steel truss brace and manufacturing method for steel truss platform
CN205421321U (en) Precast reinforced concrete base
CN202689029U (en) Anchor rod foundation of photovoltaic module support
CN204098487U (en) Gear-like curved wall pilaster template
CN203347247U (en) Preinstallation floor type support for brick masonry inner wire box
CN102653947B (en) Underground embedded steel component limiting straightening construction method
CN203008232U (en) Steel truss strut
CN204139619U (en) For the support that huge post lifting is installed
CN204001214U (en) High accuracy capital embedded board
CN204531575U (en) Cement pole Reinforcement Reinforced Concrete Structure
CN204356793U (en) A kind of assembling hollow reinforced concrete independent foundation
CN204898711U (en) Assembled retaining wall
CN204510688U (en) A kind of temporary fixing structure of precast wall panel
CN204435421U (en) A kind of assembling manhole
CN203080540U (en) Iron tower foundation of power transmission line
CN203603470U (en) Special tool for reinforcing independent concrete beam plate formwork
CN203594051U (en) Steel pipe pillar positioner supporting frame device used for cover and cut top-down method
CN206110163U (en) Steel frame quick -mounting tower structure
CN207794320U (en) A kind of wall connecting system up and down of installation precast facade

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121219

Termination date: 20160417

CF01 Termination of patent right due to non-payment of annual fee