CN202609783U - Universal mechanism of three/four multiplying power operation of grab bucket - Google Patents
Universal mechanism of three/four multiplying power operation of grab bucket Download PDFInfo
- Publication number
- CN202609783U CN202609783U CN 201220200053 CN201220200053U CN202609783U CN 202609783 U CN202609783 U CN 202609783U CN 201220200053 CN201220200053 CN 201220200053 CN 201220200053 U CN201220200053 U CN 201220200053U CN 202609783 U CN202609783 U CN 202609783U
- Authority
- CN
- China
- Prior art keywords
- bearing beam
- guide wheel
- multiplying power
- grab bucket
- power operation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model relates to a universal mechanism of a three/four multiplying power operation of a grab bucket, in particular to a mechanism used for the three/four multiplying power operation of the grab bucket, belonging to the technical field of crane equipment. The universal mechanism mainly comprises an upper bearing beam, a lower bearing beam, a supporting rod, a bucket body, an open/close rope, a guide wheel, an upper pulley block and a lower pulley block, wherein the upper bearing beam is hinged with the upper end of the supporting rod, and the lower end of the supporting rod is hinged with the side surface of the bucket body; the upper end of the bucket body is hinged with the lower bearing beam; the upper pulley block is arranged in the upper bearing beam, and two upper pulleys which are symmetrically distributed left and right are arranged in the upper pulley block and sleeved on upper pin shafts; the lower pulley block is arranged in the lower bearing beam, and four lower pulleys which are symmetrically distributed left and right are arranged in the lower pulley block and sleeved on lower pin shafts; the upper end of the upper bearing beam is connected with the guide wheel, and the guide wheel of the upper bearing beam is connected with the open/close rope; and an upper bearing beam wedge sleeve is arranged in the upper bearing beam, and a lower bearing beam wedge sleeve is arranged in the lower bearing beam. The universal mechanism has the advantages of simple, compact and reasonable structure, can be used for achieving the purposes of obtaining better grabbing effects during grabbing different materials, improving the working efficiency of the grab bucket and meeting the operation requirement of three/four multiplying powers and is convenient to operate, and the cost of the equipment is reduced.
Description
Technical field
The utility model relates to a kind of grab bucket three or four multiplying power operation current mechanisms, the general operation of three or four multiplying powers that specifically is used to grab bucket, belong to the crane facility technical field.
Background technology
In prior art, when three multiplying power Working mechanism operations were used in grab bucket, the work efficiency that grasps material was higher, but the closing force of when grasping some materials, grabbing bucket is not enough, and the grab bucket closing period is short, causes grip relatively poor.When four multiplying power Working mechanism operations were used in grab bucket, the closing force of grab bucket was enough, and closing period is also longer, and grip is better, but work efficiency is not high when grasping some materials.
Summary of the invention
The purpose of the utility model is to overcome above-mentioned weak point; Thereby a kind of grab bucket three or four multiplying power operation current mechanisms are provided, can when grasping different material, obtain grip preferably, can improve the work efficiency of grab bucket again; Satisfy three or four multiplying power job requirements simultaneously; Simple in structure, easy to operate, reduced the cost of equipment.
The technical scheme that provides according to the utility model; Three or the four multiplying power operation current mechanisms of grabbing bucket mainly comprise deck beam, through beam, strut, bucket body, switching rope, guide wheel, top sheave group and downslide wheels; Said deck beam and strut upper end are articulated and connected, and strut lower end and bucket body side are articulated and connected.Said bucket body upper end is articulated and connected with through beam.
Be provided with the top sheave group in the said deck beam, comprise the top sheave that two left-right symmetric distribute in the top sheave group, two top sheaves are set on the upper pin.Be provided with the downslide wheels in the said through beam, comprise the lower sheave that four left-right symmetric distribute in the downslide wheels, four lower sheaves are set on the lower bearing pin.Said deck beam upper end connects guide wheel.
In deck beam, be provided with the deck beam cover of wedge, be provided with the through beam cover of wedge in the through beam.
Connect the up-down rope on the said deck beam, connect the switching rope on the guide wheel of deck beam.
Three multiplying power operation windings of grab bucket are to open and close rope to get into a lower sheave in the downslide wheels through guide wheel, and then get into top sheave, are connected at last on the through beam cover of wedge.Four multiplying power operation windings of grab bucket are to open and close rope to get into a lower sheave in the downslide wheels through guide wheel, and then get into another lower sheave in the downslide wheels through top sheave, are connected at last on the deck beam cover of wedge.
Compared with present technology the utility model has the following advantages:
The utility model is simple, compact and reasonable for structure; Can when grasping different material, obtain grip preferably, can improve the work efficiency of grab bucket again, satisfy three or four multiplying power job requirements simultaneously; Easy to operate, reduced the cost of equipment.
Description of drawings
Fig. 1 is the utility model front view.
Fig. 2 is the utility model lateral plan.
Fig. 3 is the deck beam structural representation.
Fig. 4 is the through beam structural representation.
Fig. 5 is for opening and closing rope three multiplying power windings.
Fig. 6 is for opening and closing rope four multiplying power windings.
Description of reference numerals: 1-deck beam, 2-through beam, 3-strut, 4-bucket body, 5-up-down rope, 6-open and close rope, 7-guide wheel, 8-top sheave group, 9-downslide wheels, 10-deck beam cover of wedge, 11-through beam cover of wedge, 12-upper pin, 13-lower bearing pin, 14-top sheave, 15-lower sheave.
The specific embodiment
Following the utility model will combine the embodiment in the accompanying drawing to further describe:
Shown in Fig. 1 ~ 2; The utility model mainly comprises deck beam 1, through beam 2, strut 3, bucket body 4, opens and closes rope 6, guide wheel 7, top sheave group 8 and downslide wheels 9; Said deck beam 1 is articulated and connected with strut 3 upper ends, and strut 3 lower ends and bucket body 4 sides are articulated and connected.Said bucket body 4 upper ends and through beam 2 are articulated and connected.
Be provided with top sheave group 8 in the said deck beam 1, comprise in the top sheave group 8 that 14, two top sheaves 14 of top sheave that two left-right symmetric distribute are set on the upper pin 12.Be provided with downslide wheels 9 in the said through beam 2, comprise in the downslide wheels 9 that 15, four lower sheaves 15 of lower sheave that four left-right symmetric distribute are set on the lower bearing pin 13.Said deck beam 1 upper end connects guide wheel 7.
Shown in Fig. 3 ~ 4, in deck beam 1, be provided with deck beam cover of wedge 10, be provided with through beam cover of wedge 11 in the through beam 2.
Connect up-down rope 5 on the said deck beam 1, connect switching rope 6 on the guide wheel 7 of deck beam 1.
Shown in Fig. 5 ~ 6, three multiplying power operation windings of grab bucket are to open and close the lower sheave 15 that rope 6 gets in the downslide wheels 9 through guide wheel 7, and then get into top sheave 14, are connected at last on the through beam cover of wedge 11.Four multiplying power operation windings of grab bucket are to open and close the lower sheave 15 that rope 6 gets in the downslide wheels 9 through guide wheel 7, and then through another lower sheave 15 that top sheave 14 gets in the downslide wheels 9, are connected at last on the deck beam cover of wedge 10.
The principle of work of the utility model is: in use, if the material ratio that grasps is easier to grasp, need the grab bucket efficiency operation, then take three multiplying power operation windings.Every opens and closes the lower sheave 15 that rope 6 gets in the downslide wheels 9 through guide wheel 7, and then gets into top sheave 14, is connected at last on the through beam cover of wedge 11, and two other lower sheave 15 in the downslide wheels 9 is inoperative.Grab bucket just can realize the high-efficiency homework of three multiplying powers when operation.If during the difficult extracting of the material that grasps, just need take four multiplying power operation windings.Every opens and closes the lower sheave 15 that rope 6 gets in the downslide wheels 9 through guide wheel 7, and then through another top sheave 14 that top sheave 14 gets in the downslide wheels 9, is connected at last on the deck beam cover of wedge 10.After taking four multiplying power operation windings, the closing force of grab bucket is enough, and closing period is also longer, and grip is better.
In same grab bucket, realize three or four multiplying power operations, can when grasping different material, obtain grip preferably, can improve the work efficiency of grab bucket again, easy to operate, reduced the cost of equipment.
Claims (4)
- One kind the grab bucket three or four multiplying power operation current mechanisms; It is characterized in that: comprise deck beam (1), through beam (2), strut (3), bucket body (4), open and close rope (6), guide wheel (7), top sheave group (8) and downslide wheels (9); Said deck beam (1) is articulated and connected with strut (3) upper end, and strut (3) lower end and bucket body (4) side are articulated and connected; Said bucket body (4) upper end is articulated and connected with through beam (2); Be provided with top sheave group (8) in the said deck beam (1), comprise the top sheave (14) that two left-right symmetric distribute in the top sheave group (8), two top sheaves (14) are set on the upper pin (12); Be provided with downslide wheels (9) in the said through beam (2), comprise the lower sheave (15) that four left-right symmetric distribute in the downslide wheels (9), four lower sheaves (15) are set on the lower bearing pin (13); Said deck beam (1) upper end connects guide wheel (7), and the guide wheel (7) of deck beam (1) is gone up to connect and opened and closed rope (6); Be provided with deck beam cover of wedge (10) in the said deck beam (1), be provided with through beam cover of wedge (11) in the through beam (2).
- 2. grab bucket three or four multiplying power operation current mechanisms as claimed in claim 1; It is characterized in that: said switching rope (6) gets into the lower sheave (15) in the downslide wheels (9) through guide wheel (7); And then get into top sheave (14), be connected at last on the through beam cover of wedge (11).
- 3. grab bucket three or four multiplying power operation current mechanisms as claimed in claim 1; It is characterized in that: said switching rope (6) gets into the lower sheave (15) in the downslide wheels (9) through guide wheel (7); And then, be connected at last on the deck beam cover of wedge (10) through another lower sheave (15) in top sheave (14) the entering downslide wheels (9).
- 4. grab bucket three or four multiplying power operation current mechanisms as claimed in claim 1 is characterized in that: said deck beam (1) is gone up and is connected up-down rope (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220200053 CN202609783U (en) | 2012-05-05 | 2012-05-05 | Universal mechanism of three/four multiplying power operation of grab bucket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220200053 CN202609783U (en) | 2012-05-05 | 2012-05-05 | Universal mechanism of three/four multiplying power operation of grab bucket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202609783U true CN202609783U (en) | 2012-12-19 |
Family
ID=47343498
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220200053 Withdrawn - After Issue CN202609783U (en) | 2012-05-05 | 2012-05-05 | Universal mechanism of three/four multiplying power operation of grab bucket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202609783U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102674150A (en) * | 2012-05-05 | 2012-09-19 | 无锡市新华起重工具有限公司 | Universal mechanism for realizing triple or quadruple operation of grab bucket |
CN103231997A (en) * | 2013-04-23 | 2013-08-07 | 北京南车时代机车车辆机械有限公司 | Deep-foundation grab crane |
-
2012
- 2012-05-05 CN CN 201220200053 patent/CN202609783U/en not_active Withdrawn - After Issue
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102674150A (en) * | 2012-05-05 | 2012-09-19 | 无锡市新华起重工具有限公司 | Universal mechanism for realizing triple or quadruple operation of grab bucket |
CN102674150B (en) * | 2012-05-05 | 2014-05-14 | 无锡市新华起重工具有限公司 | Universal mechanism for realizing triple or quadruple operation of grab bucket |
CN103231997A (en) * | 2013-04-23 | 2013-08-07 | 北京南车时代机车车辆机械有限公司 | Deep-foundation grab crane |
CN103231997B (en) * | 2013-04-23 | 2016-08-31 | 北京中车重工机械有限公司 | A kind of Deep-foundation grab crane |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2008040349A8 (en) | Hoisting device | |
CN202609783U (en) | Universal mechanism of three/four multiplying power operation of grab bucket | |
CN102674150A (en) | Universal mechanism for realizing triple or quadruple operation of grab bucket | |
CN204847910U (en) | Weather proof gantry crane | |
CN201424337Y (en) | Wood gripping apparatus | |
CN204057797U (en) | cable cover hoisting device | |
CN205973447U (en) | Hoist of loading and unloading screw -thread steel | |
CN213976661U (en) | Hydraulic scrap steel gripping device | |
CN201924361U (en) | Cable traction pile extractor | |
CN203284098U (en) | Disassembled and assembled part self-lifting device for tower crane | |
CN203033661U (en) | Double-connection wood grab bucket | |
CN203345936U (en) | Multipurpose closed type hydraulic gripper | |
CN103466440B (en) | Water surface slag is grabbed bucket | |
CN203295046U (en) | Wireless remote control grab bucket | |
CN201907922U (en) | Lifting hook | |
CN202107424U (en) | Three-jaw sling | |
CN215558418U (en) | Crane grab bucket for pipeline | |
CN206203721U (en) | Driven by Solar Energy rubbish hangs | |
CN206239910U (en) | A kind of cord expander with brake apparatus | |
CN205114127U (en) | Automatic open and merge material jar at end | |
CN205275025U (en) | Clamp grab bucket structure | |
CN217676377U (en) | Multifunctional telescopic lifting appliance | |
CN209352478U (en) | A kind of road and bridge construction tool fast lifting equipment | |
CN202214144U (en) | 25-ton four-cable raw wood grab bucket for loading and unloading gantry crane | |
CN203877735U (en) | Fixed type double lifting hook |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20121219 Effective date of abandoning: 20140514 |
|
RGAV | Abandon patent right to avoid regrant |