CN202596676U - Cluster well field closed oil test production device - Google Patents
Cluster well field closed oil test production device Download PDFInfo
- Publication number
- CN202596676U CN202596676U CN 201220177438 CN201220177438U CN202596676U CN 202596676 U CN202596676 U CN 202596676U CN 201220177438 CN201220177438 CN 201220177438 CN 201220177438 U CN201220177438 U CN 201220177438U CN 202596676 U CN202596676 U CN 202596676U
- Authority
- CN
- China
- Prior art keywords
- oil
- fire hose
- eliminator
- airtight
- reserve tank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Loading And Unloading Of Fuel Tanks Or Ships (AREA)
- Feeding And Controlling Fuel (AREA)
Abstract
The utility model discloses a cluster well field closed oil test production device which is applicable to oil production in an oil field. An outlet of an oil well oil production tree is connected with a throttle cut-off vent valve and a pipe thread joint of a wellhead device, the pipe thread joint is connected with a first lined fire hose, the other end of the first lined fire hose is connected with an inlet of a skid-mounted closed separator, an oil outlet of the skid-mounted closed separator is connected with a second lined fire hose, the other end of the second lined fire hose is connected with the inlet of an oil storage tank, and the oil storage tank is connected with an oil storage tank vent pipeline, an oil storage tank loading pipeline and an oil storage tank sewage drain pipeline. The cluster well field closed oil test production device has the advantages that oil buffer, gas-liquid separation and back-washing functions can be realized, oil-gas totally-closed gathering and transportation can be realized, and fire hazards of fluid spraying during swabbing liquid drainage and production relief liquid drainage in the oil test production process are reduced.
Description
Technical field
The utility model relates to oil recovery technique field, oil field, and particularly the device of well site formation testing operation is the device that the airtight formation testing in a kind of cluster well field is gone into operation.
Background technology
At present, along with the development of technology, the cluster well development technique is low because of investing, floor space is little, management point is few etc., and many advantages are popularized in an all-round way in oilfield construction.Cluster well is promptly built several mouthfuls of oil wells in 1 well site, is generally 3~5 mouthfuls, and well group output is high.It is through to multiple modes such as oil well perforation, tubing flow displacement, induced flow that the well site formation testing is gone into operation, and makes the fluid in the stratum get into pit shaft, flows out ground.And in this process, obtain the data such as pressure variation in the character of formation fluid, various fluid-withdrawal rate, strata pressure and the process fluid flow; And through the analysis of these data and the various physical parameters on processing acquisition stratum; The stratum is estimated, and prepared for oil well crude oil gets into surface technology flow process input ordinary production state.
Before the oil well access process, it is 20~30m that liquid measure is discharged in well site formation testing operation operation
3Cluster well field formation testing is at present gone into operation and is adopted open flow process; The liquid that the operation formation testing produces directly enters interim contaminated-oil basin or horizontal fuel tank; Associated gas directly discharges the entering atmosphere; There was certain disaster hidden-trouble in the generation jet fluid when particularly at present the pumping discharge opeing was with the discharge opeing of operation open flow in the activities.
The utility model content
The purpose of the utility model is: a kind of cluster well field device that airtight formation testing is gone into operation is provided; Eliminated cluster well field, oil field before not being connected into flow process; The disaster hidden-trouble of produced fluid improves oil-gas closed rate when pumping discharge opeing and the discharge opeing of operation open flow, to reach the reduction security risk.
The technical scheme that the utility model adopts is: the device that the airtight formation testing in cluster well field is gone into operation comprises that each well recovery tree 1, the wellhead assembly 2, first in the cluster well group has lining fire hose 3, sledge to adorn airtight eliminator 4 and fuel reserve tank 5; It is characterized in that: the outlet of well recovery tree 1 connects the throttling of wellhead assembly 2 by atmospheric valve 7, and throttling is by the tube tooth interface 6 of the other end connection wellhead assembly 2 of atmospheric valve 7, and tube tooth interface 6 connects first has lining fire hose 3; First has the other end of lining fire hose 3 to connect the inlet that sledge is adorned airtight eliminator 4; Eliminator blow-down pipe 9 is arranged at the top that sledge is adorned airtight eliminator 4; The bottom that sledge is adorned airtight eliminator 4 is connected with eliminator blowdown pipeline 8 and backwash pipeline 10; The oil export that sledge is adorned airtight eliminator 4 is connected with second has lining fire hose 14, the second to have the other end of lining fire hose 14 to connect the inlet of fuel reserve tank 5; Fuel reserve tank 5 is connected with fuel reserve tank blow-down pipe 11, fuel reserve tank entrucking pipeline 12 and fuel reserve tank blowdown pipeline 13.
The course of work of the device that the airtight formation testing in summary cluster well field is gone into operation.Consult Fig. 1.When formation testing or operation; The gas mixture that each well recovery is set 1 extraction gets into wellhead assembly 2; Have lining fire hose 3 to get into sledges through first fast and adorn airtight eliminator 4, have lining fire hose 14 to get into fuel reserve tanks 5 through separating back crude oil through second, sledge is adorned airtight eliminator 4 isolated associated gases and is drained into through blow-down pipe 9 and release flare; Sledge is adorned airtight eliminator 4 also can carry out backwash through backwash pipeline 10; Sewage drains into the well site sewage reservoir through blowdown pipeline 8, and fuel reserve tank 5, drains into gas through fuel reserve tank blow-down pipe 11 and to release flare the oil article vehicle outward transport through fuel reserve tank entrucking pipeline 12; Through fuel reserve tank blowdown pipeline 13 sewage in the fuel reserve tank 5 is drained into the well site sewage reservoir.
The beneficial effect of the utility model: the device that the airtight formation testing in the utility model cluster well field is gone into operation; Can realize oily buffering, gas-liquid separating function, backwashing function; Can realize that oil gas totally-enclosed collection is defeated, the disaster hidden-trouble of output jet fluid when having reduced pumping discharge opeing and the discharge opeing of operation open flow in the formation testing operation process.
Description of drawings
Fig. 1 is the device sketch map that the airtight formation testing in the utility model cluster well field is gone into operation.
Among the figure, the 1-production tree, the 2-wellhead assembly, 3-first has the lining fire hose; The 4-sledge is adorned airtight eliminator, the 5-fuel reserve tank, and the 6-tube tooth interface, the 7-throttling is by atmospheric valve; 8-eliminator blowdown pipeline, 9-eliminator blow-down pipe, 10-backwash pipeline, 11-fuel reserve tank blow-down pipe; 12-fuel reserve tank entrucking pipeline, 13-fuel reserve tank blowdown pipeline, 14-second has the lining fire hose.
The specific embodiment
Embodiment 1: consult Fig. 1.The device that the airtight formation testing in the utility model cluster well field is gone into operation comprises that each well recovery tree 1, the wellhead assembly 2, first in the cluster well group has lining fire hose 3, sledge to adorn airtight eliminator 4 and fuel reserve tank 5.
The throttling that production tree 1 outlet of three mouthfuls of oil wells connects wellhead assembly 2 respectively is by atmospheric valve 7, and throttling is by the tube tooth interface 6 of the other end connection wellhead assembly 2 of atmospheric valve 7, and tube tooth interface 6 connects first has lining fire hose 3.Three first have the other end of lining fire hose 3 to connect the inlet that sledge is adorned airtight eliminator 4 respectively.An eliminator blow-down pipe 9 is arranged at the top that sledge is adorned airtight eliminator 4, and the bottom that sledge is adorned airtight eliminator 4 is connected with an eliminator blowdown pipeline 8 and a backwash pipeline 10.The oil export that sledge is adorned airtight eliminator 4 is connected with the inlet that one second other end that has lining fire hose 14, the second that lining fire hose 14 is arranged connects fuel reserve tank 5.Fuel reserve tank 5 is connected with a fuel reserve tank blow-down pipe 11, a fuel reserve tank entrucking pipeline 12 and a fuel reserve tank blowdown pipeline 13.
Claims (1)
1. the device that the airtight formation testing in cluster well field is gone into operation comprises that each well recovery tree (1), the wellhead assembly (2), first in the cluster well group has lining fire hose (3), sledge to adorn airtight eliminator (4) and fuel reserve tank (5); It is characterized in that: the outlet of well recovery tree (1) connects the throttling of wellhead assembly (2) by atmospheric valve (7), and throttling is by the tube tooth interface (6) of the other end connection wellhead assembly (2) of atmospheric valve (7), and tube tooth interface (6) connects first has lining fire hose (3); First has the other end of lining fire hose (3) to connect the inlet that sledge is adorned airtight eliminator (4); Eliminator blow-down pipe (9) is arranged at the top that sledge is adorned airtight eliminator (4); The bottom that sledge is adorned airtight eliminator (4) is connected with eliminator blowdown pipeline (8) and backwash pipeline (10); The oil export that sledge is adorned airtight eliminator (4) is connected with second has lining fire hose (14), and second has the other end of lining fire hose (14) to connect the inlet of fuel reserve tank (5); Fuel reserve tank (5) is connected with fuel reserve tank blow-down pipe (11), fuel reserve tank entrucking pipeline (12) and fuel reserve tank blowdown pipeline (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220177438 CN202596676U (en) | 2012-04-24 | 2012-04-24 | Cluster well field closed oil test production device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220177438 CN202596676U (en) | 2012-04-24 | 2012-04-24 | Cluster well field closed oil test production device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202596676U true CN202596676U (en) | 2012-12-12 |
Family
ID=47314223
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220177438 Expired - Fee Related CN202596676U (en) | 2012-04-24 | 2012-04-24 | Cluster well field closed oil test production device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202596676U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104213889A (en) * | 2013-06-04 | 2014-12-17 | 王传奇 | Pumping well wellhead oil charging device with ZYQ buffer |
CN108894759A (en) * | 2018-07-27 | 2018-11-27 | 中国石油天然气股份有限公司 | The note of downhole oil-water separation based on electric pulse adopts integrated device and its application method |
CN115234198A (en) * | 2022-07-19 | 2022-10-25 | 天津海渤谊油科技发展有限公司 | Airtight drain of oil gas well |
-
2012
- 2012-04-24 CN CN 201220177438 patent/CN202596676U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104213889A (en) * | 2013-06-04 | 2014-12-17 | 王传奇 | Pumping well wellhead oil charging device with ZYQ buffer |
CN108894759A (en) * | 2018-07-27 | 2018-11-27 | 中国石油天然气股份有限公司 | The note of downhole oil-water separation based on electric pulse adopts integrated device and its application method |
CN108894759B (en) * | 2018-07-27 | 2023-09-26 | 中国石油天然气股份有限公司 | Underground oil-water separation injection and production integrated device based on electric pulse and application method thereof |
CN115234198A (en) * | 2022-07-19 | 2022-10-25 | 天津海渤谊油科技发展有限公司 | Airtight drain of oil gas well |
CN115234198B (en) * | 2022-07-19 | 2024-01-12 | 天津海渤谊油科技发展有限公司 | Sealed liquid discharging device for oil and gas well |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104453839B (en) | Large-discharge-capacity oil-water separation automatically flowing water injection system | |
CN103821494A (en) | Large-flow offshore downhole oil-water separator provided with lifting tubing | |
CN109415930A (en) | Submarine methane produces component | |
CN108222914B (en) | Membrane material underground oil-water separation device, production pipe column and oil-water separation method | |
CN103883305B (en) | Deepwater seabed oil and water separation and reinjection device | |
CN103742124A (en) | Method for re-separating produced liquid of underground oil-water separation co-well injection and production well | |
CN203702122U (en) | Large-flow underground oil-water separator used at sea and equipped with lifting oil tubes | |
CN202596676U (en) | Cluster well field closed oil test production device | |
CN107503714A (en) | A kind of parallel sea-bottom shallow gas hydrates in-situ separating device | |
CN104791610B (en) | A kind of automatic draining device of skid-mounted type emptying liquid-separation | |
CN112081559A (en) | Device and method for extracting natural gas hydrate by depressurization and double-pipe injection of modified fluid | |
CN104179477A (en) | Electric pump oil production technology pipe column utilizing continuous oil pipe suspension | |
CN211448630U (en) | Device for extracting natural gas hydrate by depressurization and double-pipe injection of modified fluid | |
CN203488154U (en) | Portable oil well casing gas recovery device | |
CN205297469U (en) | Device is flowed in oil jacket management and control | |
CN103244077B (en) | Crude oil solution gas underground collection device | |
CN103573194A (en) | Production string optimization device for oil well in case of electric submersible pump gas-locking | |
CN216894366U (en) | Unconventional gas well mouth continuous automatic water discharging device | |
CN207296973U (en) | A kind of parallel sea-bottom shallow gas hydrates in-situ separating device | |
CN206220948U (en) | A kind of downhole oil-water separation device with booster-type hydrocyclone | |
CN206111115U (en) | Coiled tubing underbalance sand washing device | |
CN212417088U (en) | Oil gas water pipe type separator | |
CN113445970A (en) | Ground production increase auxiliary device of coal bed gas single well tolerance | |
CN204419156U (en) | A kind of boring for the natural gas well grinds the gas-liquid separation device that bridging plug returns drainage journey | |
RU129551U1 (en) | WELL CONSTRUCTION |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121212 Termination date: 20210424 |