CN202586095U - Multifunctional electric energy metering cabinet - Google Patents
Multifunctional electric energy metering cabinet Download PDFInfo
- Publication number
- CN202586095U CN202586095U CN 201220111927 CN201220111927U CN202586095U CN 202586095 U CN202586095 U CN 202586095U CN 201220111927 CN201220111927 CN 201220111927 CN 201220111927 U CN201220111927 U CN 201220111927U CN 202586095 U CN202586095 U CN 202586095U
- Authority
- CN
- China
- Prior art keywords
- electric energy
- energy metering
- multifunctional electric
- load control
- cabinet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000013642 negative control Substances 0.000 claims description 16
- 238000009434 installation Methods 0.000 claims description 8
- 238000007789 sealing Methods 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
Images
Landscapes
- Patch Boards (AREA)
Abstract
Provided is a multifunctional electric energy metering cabinet, comprising a carrier cabinet body. The multifunctional electric energy metering cabinet is special in that: the carrier cabinet body is internally provided with a metering chamber for installing an electric energy metering device and a load control chamber for installing a load control terminal apparatus, wherein the metering chamber and the load control chamber are respectively provided with a terminal installing plate. The metering chamber and the load control chamber are arranged in a left-to-right manner, or the load control chamber and the metering chamber are arranged in an up-and-down manner. The multifunctional electric energy metering cabinet of the utility model simplifies the installing connection of the electric energy metering device and the load control terminal apparatus, reduces the wrong wiring rate of the apparatus, raises the standardization management level of the apparatus, and reduces the apparatus construction investment and the operation expense.
Description
Technical field
The utility model relates to the carrier cabinet of electric power meter and load control terminal device, particularly a kind of multifunctional electric energy metering cabinet.
Background technology
Electric power meter is installed in respectively in the carrier cabinet separately with load control terminal device usually; Be electric energy metrical cabinet and load control casing, treat that electric power meter and load control terminal device are installed respectively after, between is arranged wiring again; In this case; Installation process is comparatively complicated, is easy to generate the mis-wired phenomenon, has a strong impact on electric power meter and normally moves with load control terminal device.
Summary of the invention
The utility model technical problem to be solved provides a kind of multifunctional electric energy metering cabinet; Simplify electric power meter and the wiring of load control terminal Unit Installation; Reduce device mis-wired probability, improve device standardized management level, reduce plant construction investment and operation expense.
The technical scheme of the utility model is: this multifunctional electric energy metering cabinet; Comprise carrier cabinet body; Its special character is: the negative control chamber that utilizes enclosed baffle to be provided with the measuring room of installation electric power meter and load control terminal device is installed in the described carrier cabinet body, described measuring room is controlled the indoor terminal mounting panel that is respectively equipped with bearing.
Described measuring room is arranged with left and right mode with negative control chamber.
Described negative control chamber and measuring room are arranged with the upper and lower formula.
Described carrier cabinet bodies top also is provided with the sealing control room, and carrier cabinet body bottom is provided with voltage and current transformer installation room.
Described measuring room rear side is installed voltage transformer and current transformer, and the instrument transformer upper and lower part is installed bus row respectively.
The beneficial effect of the utility model is: owing in same carrier cabinet, be provided with measuring room and negative control chamber simultaneously; Electric power meter and load control terminal device are installed respectively; Existing electric energy metrical cabinet and load control casing are integrated, have the advantage of multi-use.In addition, the distance of stream oriented device furthers and has saved the wiring cost, is provided with the terminal mounting panel in this carrier cabinet, is convenient to the wiring between the stream oriented device, makes the wiring simple and fast that becomes, and has reduced the mis-wired probability.
Description of drawings
Fig. 1 is the structural representation (corresponding embodiment 1) of the utility model;
Fig. 2 is the end view of Fig. 1, removes the side plate of carrier cabinet body;
Fig. 3 is the structural representation (corresponding embodiment 2) of the utility model;
Fig. 4 is the end view of Fig. 3, removes the side plate of carrier cabinet body.
Sequence number explanation among the figure: 1-carrier cabinet body, 2-voltage and current transformer installation room, 3-measuring room, 4-metering lock, the negative control of 5-chamber, 6-sealing control room, 7-terminal mounting panel, 8-enclosed baffle, 9-bus row, 10-voltage transformer, 11-current transformer.
Embodiment
Embodiment 1:
Like Fig. 1, shown in Figure 2; This multifunctional electric energy metering cabinet; Comprise carrier cabinet body 1, wherein: utilize enclosed baffle 8 to be provided with the measuring room 3 of installation electric power meter, the negative control chamber 5 that load control terminal device is installed in the carrier cabinet body 1, measuring room 3 is arranged with left and right mode arranged side by side with the negative chamber 5 of controlling; Measuring room 3 is respectively equipped with terminal mounting panel 7 with negative the control in the chamber 5, so that arrange wiring.Carrier cabinet body 1 top also is provided with sealing control room 6, and carrier cabinet body 1 bottom is provided with voltage and current transformer installation room 2, and measuring room 3 is respectively equipped with metering lock 4 with negative control 5 outsides, chamber.This metering cabinet is applicable to the low-voltage cabinet requirement.
Embodiment 2:
Like Fig. 3, shown in Figure 4; This multifunctional electric energy metering cabinet; Comprise carrier cabinet body 1, wherein: utilize enclosed baffle to be provided with the measuring room 3 of installation electric power meter, the negative control chamber 5 that load control terminal device is installed in the carrier cabinet body 1, negative control chamber 5 and measuring room 3 are arranged with the upper and lower formula; Measuring room 3 is respectively equipped with terminal mounting panel 7 with negative the control in the chamber 5, so that arrange wiring.Measuring room 3 rear sides are installed voltage transformer 10 and current transformer 11, and the instrument transformer upper and lower part is installed bus row 9 respectively, and mounting panel capable of using is installed gauge table in the measuring room 3.This metering cabinet is applicable to the high-voltage board requirement.
This multifunctional electric energy metered amount taken into full account electric power meter and negative control terminal device operation principle, electric power meter and the required safe distance of negative control terminal device safe operation, electric power meter and negative control terminal device are installed, test, change many-sided factors such as convenient; Electric power meter and load control terminal device are designed in a metering cabinet; And through test and on-the-spot trial run, respond well.
Claims (5)
1. multifunctional electric energy metering cabinet; Comprise carrier cabinet body; It is characterized in that: be respectively equipped with measuring room that electric power meter is installed and the negative control chamber that load control terminal device is installed in the described carrier cabinet body, described measuring room and the indoor terminal mounting panel that is respectively equipped with of negative control.
2. multifunctional electric energy metering cabinet according to claim 1 is characterized in that: described measuring room is arranged with left and right mode with negative control chamber.
3. multifunctional electric energy metering cabinet according to claim 1 is characterized in that: described negative control chamber and measuring room are arranged with the upper and lower formula.
4. multifunctional electric energy metering cabinet according to claim 1 and 2 is characterized in that: described carrier cabinet bodies top also is provided with the sealing control room, and carrier cabinet body bottom is provided with voltage and current transformer installation room.
5. according to claim 1 or 3 described multifunctional electric energy metering cabinets, it is characterized in that: described measuring room rear side is installed voltage transformer and current transformer, and the instrument transformer upper and lower part is installed bus row respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220111927 CN202586095U (en) | 2012-03-23 | 2012-03-23 | Multifunctional electric energy metering cabinet |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220111927 CN202586095U (en) | 2012-03-23 | 2012-03-23 | Multifunctional electric energy metering cabinet |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202586095U true CN202586095U (en) | 2012-12-05 |
Family
ID=47255466
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220111927 Expired - Lifetime CN202586095U (en) | 2012-03-23 | 2012-03-23 | Multifunctional electric energy metering cabinet |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202586095U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103063912A (en) * | 2013-01-06 | 2013-04-24 | 四川省电力公司达州电业局 | Electric energy metering device |
CN103337793A (en) * | 2013-06-07 | 2013-10-02 | 国家电网公司 | Multifunctional metering cabinet |
CN104078856A (en) * | 2014-07-24 | 2014-10-01 | 国家电网公司 | Metering and negative control one-piece cabinet for transformer station |
-
2012
- 2012-03-23 CN CN 201220111927 patent/CN202586095U/en not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103063912A (en) * | 2013-01-06 | 2013-04-24 | 四川省电力公司达州电业局 | Electric energy metering device |
CN103337793A (en) * | 2013-06-07 | 2013-10-02 | 国家电网公司 | Multifunctional metering cabinet |
CN103337793B (en) * | 2013-06-07 | 2016-03-30 | 国家电网公司 | A kind of Multifunctional measuring cabinet |
CN104078856A (en) * | 2014-07-24 | 2014-10-01 | 国家电网公司 | Metering and negative control one-piece cabinet for transformer station |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202586095U (en) | Multifunctional electric energy metering cabinet | |
CN204103492U (en) | A kind of close-coupled chain type SVG power cell | |
CN204835268U (en) | Modularization meter box structure | |
CN203774811U (en) | Battery management system capable of effectively shielding electromagnetic interference | |
CN203193172U (en) | Armored movable type metal enclosed switch cabinet | |
CN203445420U (en) | Universal installation beam | |
CN208705373U (en) | One kind being based on power carrier information collecting device | |
CN205753155U (en) | A kind of gas-insulated switchgear | |
CN202678343U (en) | Solar energy frame assembly | |
CN202121328U (en) | Integrated high voltage wattless automatic compensation unit | |
CN202678342U (en) | Solar energy frame assembly | |
CN202026004U (en) | Feeder cabinet of intelligent low-voltage extraction-type distribution cabinet | |
CN203445448U (en) | Installing support of electric control cabinet | |
CN203660373U (en) | Medium voltage indoor armor movable-type alternating current metal closed switch cabinet | |
CN201260035Y (en) | Electric control cabinet capable of installing multiple functional modules | |
CN201926684U (en) | Novel installation plate for energy meter | |
CN203288951U (en) | Distribution box | |
CN202423886U (en) | Isolating device for high-voltage chamber of box-type transformer substation | |
CN201878473U (en) | Connection structure of tray sheet metal part | |
CN202838060U (en) | Control system for temperature inside switch cabinet | |
CN203742231U (en) | Remote monitoring and fixing device for inclination of power transmission tower | |
CN201774149U (en) | Electrical cubicle with interlayer | |
CN201708447U (en) | Electric isolation device | |
CN203300983U (en) | Misconnection-preventing installation device | |
CN203326395U (en) | Sign plate hanging device of low-voltage distribution cabinet |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20121205 |