CN202579059U - 大功率离岸型风力发电机增速齿轮箱 - Google Patents
大功率离岸型风力发电机增速齿轮箱 Download PDFInfo
- Publication number
- CN202579059U CN202579059U CN2012201947113U CN201220194711U CN202579059U CN 202579059 U CN202579059 U CN 202579059U CN 2012201947113 U CN2012201947113 U CN 2012201947113U CN 201220194711 U CN201220194711 U CN 201220194711U CN 202579059 U CN202579059 U CN 202579059U
- Authority
- CN
- China
- Prior art keywords
- shaft
- planetary gear
- gear train
- box
- planet carrier
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000010687 lubricating oil Substances 0.000 claims description 24
- 239000003921 oil Substances 0.000 claims description 15
- 238000009434 installation Methods 0.000 claims description 10
- 238000001816 cooling Methods 0.000 claims description 6
- 230000001050 lubricating effect Effects 0.000 claims 5
- 239000000428 dust Substances 0.000 claims 1
- 238000005461 lubrication Methods 0.000 abstract description 10
- 238000007789 sealing Methods 0.000 abstract description 5
- 230000000295 complement effect Effects 0.000 description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 5
- 238000010248 power generation Methods 0.000 description 4
- 230000008901 benefit Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16H—GEARING
- F16H37/00—Combinations of mechanical gearings, not provided for in groups F16H1/00 - F16H35/00
- F16H37/02—Combinations of mechanical gearings, not provided for in groups F16H1/00 - F16H35/00 comprising essentially only toothed or friction gearings
- F16H37/04—Combinations of toothed gearings only
- F16H37/041—Combinations of toothed gearings only for conveying rotary motion with constant gear ratio
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
Landscapes
- General Details Of Gearings (AREA)
- Retarders (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2012201947113U CN202579059U (zh) | 2012-05-03 | 2012-05-03 | 大功率离岸型风力发电机增速齿轮箱 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2012201947113U CN202579059U (zh) | 2012-05-03 | 2012-05-03 | 大功率离岸型风力发电机增速齿轮箱 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN202579059U true CN202579059U (zh) | 2012-12-05 |
Family
ID=47248477
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2012201947113U Expired - Lifetime CN202579059U (zh) | 2012-05-03 | 2012-05-03 | 大功率离岸型风力发电机增速齿轮箱 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN202579059U (zh) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2015003706A1 (de) * | 2013-07-12 | 2015-01-15 | Schaeffler Technologies Gmbh & Co. Kg | Lageranordnung für ein planetengetriebe einer windkraftanlage |
| WO2015055188A1 (de) * | 2013-10-17 | 2015-04-23 | Schaeffler Technologies AG & Co. KG | Lageranordnung für ein planetengetriebe einer windkraftanlage |
| CN104832378A (zh) * | 2015-04-20 | 2015-08-12 | 三一重型能源装备有限公司 | 风力发电机传动系统、传动链及风力发电机 |
| CN105257787A (zh) * | 2015-10-26 | 2016-01-20 | 重庆望江工业有限公司 | 用于风电机组的功率分流式齿轮箱结构 |
| CN106837703A (zh) * | 2017-04-13 | 2017-06-13 | 泗阳高传电机制造有限公司 | 半直驱风力发电机 |
| CN110671485A (zh) * | 2019-11-06 | 2020-01-10 | 南京高速齿轮制造有限公司 | 一种风电齿轮箱太阳轮轴与花键轴的装配结构 |
| WO2025020079A1 (en) * | 2023-07-25 | 2025-01-30 | Envision Energy Co., Ltd. | A drivetrain for a wind turbine and a wind turbine |
-
2012
- 2012-05-03 CN CN2012201947113U patent/CN202579059U/zh not_active Expired - Lifetime
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2015003706A1 (de) * | 2013-07-12 | 2015-01-15 | Schaeffler Technologies Gmbh & Co. Kg | Lageranordnung für ein planetengetriebe einer windkraftanlage |
| WO2015055188A1 (de) * | 2013-10-17 | 2015-04-23 | Schaeffler Technologies AG & Co. KG | Lageranordnung für ein planetengetriebe einer windkraftanlage |
| CN104832378A (zh) * | 2015-04-20 | 2015-08-12 | 三一重型能源装备有限公司 | 风力发电机传动系统、传动链及风力发电机 |
| CN104832378B (zh) * | 2015-04-20 | 2017-12-08 | 三一重型能源装备有限公司 | 风力发电机传动系统、传动链及风力发电机 |
| CN105257787A (zh) * | 2015-10-26 | 2016-01-20 | 重庆望江工业有限公司 | 用于风电机组的功率分流式齿轮箱结构 |
| CN106837703A (zh) * | 2017-04-13 | 2017-06-13 | 泗阳高传电机制造有限公司 | 半直驱风力发电机 |
| CN106837703B (zh) * | 2017-04-13 | 2019-12-10 | 南京高传机电自动控制设备有限公司 | 半直驱风力发电机 |
| CN110671485A (zh) * | 2019-11-06 | 2020-01-10 | 南京高速齿轮制造有限公司 | 一种风电齿轮箱太阳轮轴与花键轴的装配结构 |
| WO2025020079A1 (en) * | 2023-07-25 | 2025-01-30 | Envision Energy Co., Ltd. | A drivetrain for a wind turbine and a wind turbine |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202579059U (zh) | 大功率离岸型风力发电机增速齿轮箱 | |
| CN100507307C (zh) | 混合驱动型风力发电机增速齿轮箱 | |
| CN202579057U (zh) | 大功率风力发电机增速齿轮箱 | |
| CN201714592U (zh) | 大功率风力发电机用增速齿轮箱 | |
| CN201090683Y (zh) | 风力发电变桨减速齿轮箱 | |
| CN201714590U (zh) | 风力发电机用增速齿轮箱 | |
| CN202579058U (zh) | 2.5兆瓦以上风力发电机用增速齿轮箱 | |
| CN101363407A (zh) | 一种风力发电机组 | |
| CN202040282U (zh) | 大功率风力发电机用增速齿轮箱 | |
| CN201367991Y (zh) | 上风向型风力发电机增速齿轮箱 | |
| CN203686002U (zh) | 差动式紧凑型半直驱风电齿轮箱 | |
| CN103742607A (zh) | 一体化的半直驱风力发电机传动链及其所用齿轮箱 | |
| CN201367988Y (zh) | 下风向型风力发电机增速齿轮箱 | |
| CN202194785U (zh) | 一种水平轴风力机组及其齿轮箱装置 | |
| CN101649816A (zh) | 风力发电偏航减速装置 | |
| CN202531361U (zh) | 紧凑型风力发电增速齿轮箱 | |
| CN201129406Y (zh) | 风力发电机用增速齿轮箱 | |
| CN201129405Y (zh) | 用于风力发电机的增速齿轮箱 | |
| CN104776202A (zh) | 一种用于6~8mw半直驱风电机组的功率分流式增速齿轮箱 | |
| CN201381953Y (zh) | 一种半直驱风力发电机组增速箱 | |
| CN201747913U (zh) | 风力发电机组增速齿轮箱 | |
| CN201367989Y (zh) | 大功率风力发电机增速齿轮箱 | |
| CN201666335U (zh) | 风力发电机增速齿轮箱 | |
| CN201461259U (zh) | 大功率风力发电机增速齿轮箱 | |
| CN201348010Y (zh) | 半直驱风力发电增速箱 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20191008 Address after: No. 30 Houjiao Road, Jiangning District, Nanjing, Jiangsu Province, 210000 (Jiangning High-tech Park) Co-patentee after: Nanjing High Precision Transmission Equipment Manufacturing Group Co., Ltd. Patentee after: Nanjing High Speed Gear Manufacturing Co., Ltd. Address before: 211100 No. 1 East Tianyuan Road, Jiangning Science Park, Nanjing, Jiangsu Patentee before: Nanjing High Speed Gear Manufacturing Co., Ltd. |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20200514 Address after: No. 30 Houjiao Road, Jiangning District, Nanjing, Jiangsu Province, 210000 (Jiangning High-tech Park) Patentee after: NANJING HIGH SPEED GEAR MANUFACTURING Co.,Ltd. Address before: No. 30 Houjiao Road, Jiangning District, Nanjing, Jiangsu Province, 210000 (Jiangning High-tech Park) Co-patentee before: Nanjing High Precision Transmission Equipment Manufacturing Group Co., Ltd. Patentee before: NANJING HIGH SPEED GEAR MANUFACTURING Co.,Ltd. |
|
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20121205 |