CN202572319U - Pipeline fixator - Google Patents

Pipeline fixator Download PDF

Info

Publication number
CN202572319U
CN202572319U CN 201220275104 CN201220275104U CN202572319U CN 202572319 U CN202572319 U CN 202572319U CN 201220275104 CN201220275104 CN 201220275104 CN 201220275104 U CN201220275104 U CN 201220275104U CN 202572319 U CN202572319 U CN 202572319U
Authority
CN
China
Prior art keywords
threaded
chute
secondary bar
rod
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220275104
Other languages
Chinese (zh)
Inventor
郑增豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WENZHOU DONGOU CONSTRUCTION GROUP CO Ltd
Original Assignee
WENZHOU DONGOU CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WENZHOU DONGOU CONSTRUCTION GROUP CO Ltd filed Critical WENZHOU DONGOU CONSTRUCTION GROUP CO Ltd
Priority to CN 201220275104 priority Critical patent/CN202572319U/en
Application granted granted Critical
Publication of CN202572319U publication Critical patent/CN202572319U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Surgical Instruments (AREA)

Abstract

The utility model discloses a pipeline fixator which comprises a main rod. The rod is provided with a threaded through hole. A fixed threaded rod penetrates through the threaded through hole. A sleeve pipe fixing clamp for clamping a sleeve pipe is disposed on the lower portion of the main rod. A hinge point on the main rod is respectively hinged with a left subsidiary rod and a right subsidiary rod. The left subsidiary rod and the right subsidiary rod are respectively provided with a sliding groove. A threaded rod piece penetrates through the sliding groove and is connected with a fixture. A first clamp groove is disposed on the lower end of the fixture. The upper portion of the threaded rod piece above the sliding groove is connected with a first nut. A base is disposed on the lower portion of the threaded rod piece below the sliding groove. The pipeline fixator is simple in structure and convenient to operate, and has higher accuracy.

Description

The pipeline fixator
Technical field
The utility model relates in a kind of construction operation, is used for the pipeline fixator at the outer tube targeted duct.
Background technology
In the traditional architecture industry, many relate to the operation that pipeline is set in sleeve pipe, because the location of pipeline difficulty relatively, it is more therefore to expend man-hour, and occurs easily causing doing over again than mistake.
Summary of the invention
The utility model technical problem to be solved provides a kind of simple in structure, easy to operate and pipeline fixator that precision is higher.
For this reason, the pipeline fixator that the utility model provides comprises mobile jib; Be threaded through hole in the mobile jib, standing screw passes tapped through hole, but the mobile jib bottom has the cover pipe clip of gripping sleeve; Be hinged with left secondary bar and right secondary bar on the pin joint on the mobile jib respectively; All offer chute on secondary bar in a left side and the right secondary bar, screw thread member passes chute and is connected with anchor clamps, and the anchor clamps lower end has first draw-in groove; Screw thread member top, chute top first nut that has been threaded, the chute below of screw thread member bottom is provided with base.
In the pipeline fixator that the utility model provides; But the cover pipe clip sleeve of mobile jib bottom turns standing screw then and makes the leading section of screw thread member can withstand middle pipeline on sleeve pipe, through fine setting pipeline is positioned at the center; Again with the first draw-in groove sleeve on the anchor clamps on sleeve pipe; Swing left secondary bar and right secondary bar then, screw thread member is slided in chute, secondary bar and the tight pipeline of right secondary bar cramp up to a left side; Tighten first nut at last, the outer end of left secondary bar and right secondary bar is fixed on the sleeve pipe.Said process has been accomplished the pipeline location, and its operation is very easy, and positioning accuracy is high, and the pipeline fixer structure that relates to is also simpler.
Description of drawings
The structural plan sketch map of the pipeline fixator that Fig. 1 provides for the utility model;
Fig. 2 is the structural plan sketch map of the screw thread member that has anchor clamps among Fig. 1;
Fig. 3 is the structural plan sketch map of the cover pipe clip among Fig. 1.
The specific embodiment
Like Fig. 1, Fig. 2, shown in Figure 3, the pipeline fixator that the utility model provides comprises mobile jib 1; Be threaded through hole 2 in the mobile jib 1, standing screw 3 passes tapped through hole 2, screw rod 3 rear portions, tapped through hole 2 rears second nut 14 that has been threaded; But mobile jib 1 bottom has the cover pipe clip 12 of gripping sleeve; Cover pipe clip 12 bottoms have second draw-in groove 15 that can block the sleeve pipe edge, are hinged with left secondary bar 5 and right secondary bar 6 on the pin joint 4 on the mobile jib 1 respectively, all offer chute 7 on left secondary bar 5 and the right secondary bar 6; Screw thread member 10 passes chute 7 and is connected with anchor clamps 8; Anchor clamps 8 lower ends have first draw-in groove 13, screw thread member 10 tops, chute 7 tops first nut 9 that has been threaded, and chute 7 belows of screw thread member 10 bottoms are provided with base 11.
As shown in Figure 1, on the basis of the foregoing description, be hinged with clamping bar 16 on the left secondary bar 5, have positioning screw 17 on the clamping bar 16, positioning screw 17 inserts in the chute 7 of right secondary bar 6, positioning screw 17 bottom chutes 7 belows the 3rd nut 18 that has been threaded.In the present embodiment, after the secondary bar 5 in a left side is had good positioning with right secondary bar 6, if swing clamping bar 16, with tightening the 3rd nut 18 after the pipeline clamping, at this point can be with more firm the having good positioning of pipeline.

Claims (5)

1. pipeline fixator; Comprise mobile jib (1); Be threaded through hole (2) in the mobile jib (1), standing screw (3) passes tapped through hole (2), said mobile jib (1) but the bottom has the cover pipe clip (12) of gripping sleeve; Be hinged with left secondary bar (5) and right secondary bar (6) on the pin joint (4) on the said mobile jib (1) respectively; All offer chute (7) on secondary bar in a said left side (5) and the right secondary bar (6), screw thread member (10) passes chute (7) and is connected with anchor clamps (8), and anchor clamps (8) lower end has first draw-in groove (13); Said screw thread member (10) top, chute (7) top first nut (9) that has been threaded, chute (7) below of said screw thread member (10) bottom is provided with base (11).
2. pipeline fixator according to claim 1 is characterized in that: said screw rod (3) rear portion, tapped through hole (2) rear second nut (14) that has been threaded.
3. pipeline fixator according to claim 1 and 2 is characterized in that: said cover pipe clip (12) bottom has second draw-in groove (15) that can block the sleeve pipe edge.
4. pipeline fixator according to claim 1 and 2; It is characterized in that: be hinged with clamping bar (16) on the secondary bar in a said left side (5); Have positioning screw (17) on the clamping bar (16); Positioning screw (17) inserts in the chute (7) of right secondary bar (6), and the 3rd nut (18) has been threaded below said positioning screw (17) the bottom chute (7).
5. pipeline fixator according to claim 3; It is characterized in that: be hinged with clamping bar (16) on the secondary bar in a said left side (5); Have positioning screw (17) on the clamping bar (16); Positioning screw (17) inserts in the chute (7) of right secondary bar (6), and the 3rd nut (18) has been threaded below said positioning screw (17) the bottom chute (7).
CN 201220275104 2012-06-12 2012-06-12 Pipeline fixator Expired - Fee Related CN202572319U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220275104 CN202572319U (en) 2012-06-12 2012-06-12 Pipeline fixator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220275104 CN202572319U (en) 2012-06-12 2012-06-12 Pipeline fixator

Publications (1)

Publication Number Publication Date
CN202572319U true CN202572319U (en) 2012-12-05

Family

ID=47241770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220275104 Expired - Fee Related CN202572319U (en) 2012-06-12 2012-06-12 Pipeline fixator

Country Status (1)

Country Link
CN (1) CN202572319U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102699870A (en) * 2012-06-12 2012-10-03 温州东瓯建设集团有限公司 Pipeline fixer

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102699870A (en) * 2012-06-12 2012-10-03 温州东瓯建设集团有限公司 Pipeline fixer

Similar Documents

Publication Publication Date Title
CN104589231A (en) Sliding type positioning clamp
CN103753241A (en) Location clamp for rocker arm shaft
CN202572319U (en) Pipeline fixator
CN102699870A (en) Pipeline fixer
CN202507090U (en) Auxiliary clamp for pipe fitting machining
CN104165802A (en) Fixture for tensile test for tensile machine
CN202200196U (en) Bidirectional F clip
CN205835196U (en) A kind of insertion and puller
CN201645348U (en) Tweezers with positioning device
CN204449748U (en) A kind of Flight Vehicle Structure part welding positioning clamp
CN201791996U (en) Connecting rod flat end surface clamp with included angle
CN204277833U (en) A kind of Quick push/pull fixture
CN203758393U (en) Micrometer stand with universal joint
CN204724196U (en) A kind of iron stand cross clamp
CN204075789U (en) Adapter end milling fixture
CN209175602U (en) A kind of tubular element centralising device
CN209380290U (en) A kind of tube bending jig
CN105225821A (en) A kind of instrument transformer C shape iron core clamp for machining
CN203784468U (en) Pipe clamp
CN203696817U (en) Clamping mechanism fastening piece
CN203527325U (en) Bending manifold detecting and positioning device
CN202580351U (en) Oil pipe assembly
CN202592052U (en) Clamp used for elbow groove process
CN203285042U (en) Clamping groove type connecting piece used for scaffold
CN206356932U (en) A kind of fast fixture

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121205

Termination date: 20160612