CN202543267U - Heat treatment system for hot-rolling seamless steel pipe - Google Patents

Heat treatment system for hot-rolling seamless steel pipe Download PDF

Info

Publication number
CN202543267U
CN202543267U CN2012200572401U CN201220057240U CN202543267U CN 202543267 U CN202543267 U CN 202543267U CN 2012200572401 U CN2012200572401 U CN 2012200572401U CN 201220057240 U CN201220057240 U CN 201220057240U CN 202543267 U CN202543267 U CN 202543267U
Authority
CN
China
Prior art keywords
quenching
heat treatment
steel pipe
treatment system
bridging table
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN2012200572401U
Other languages
Chinese (zh)
Inventor
吕庆功
石杰
李亚欣
王红炜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinomet Technologies Co Ltd University Of Science & Technology Beijing
Original Assignee
Sinomet Technologies Co Ltd University Of Science & Technology Beijing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinomet Technologies Co Ltd University Of Science & Technology Beijing filed Critical Sinomet Technologies Co Ltd University Of Science & Technology Beijing
Priority to CN2012200572401U priority Critical patent/CN202543267U/en
Application granted granted Critical
Publication of CN202543267U publication Critical patent/CN202543267U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Heat Treatment Of Articles (AREA)

Abstract

The utility model discloses a heat treatment system for a hot-rolling seamless steel pipe. The heat treatment system comprises a charging rack (1), a transporting roller way (2), a quenching furnace (3), a high pressure water descaling device (4), a quenching device (5), a controlled water transition rack (6), a tempering furnace (7), a first transition chain bed (8a), a second transition chain bed (8b), a straightening machine (9), a cooling bed (10), an ash blowing device (11), a straightness inspection working station (12), a first transition rack (13a), a second transition rack (13b), an ultrasonic flaw detection device (14), a band saw (15), a semi-finished product collection rack (16) and a finished product collection rack (17). A fuel stepping beam type heating furnace is adopted as the quenching furnace (3), a tunnel water quenching is adopted as the quenching device (5), and another fuel stepping beam type heating furnace is adopted as the tempering furnace (7). A steel pipe is subjected to quenching heating and tempering heating by the fuel stepping beam type heating furnaces, so that the steel pipe is heated uniformly, and the steel pipe subjected to the heat treatment is good in structure property; and the system carries out quenching by utilizing a tunnel water quenching mode, so that the water supply volume is reduced, energy sources are saved, the production is safe, and the equipment maintenance is simple.

Description

A kind of heat treatment system of hotrolling seamless pipe
Technical field
The utility model relates to the heat treatment system of hotrolling seamless pipe, belongs to steel pipe heat treatment technics field, the thermal treatment that also can be used for thickening tubing and casing and drilling rod.
Background technology
In the existing hotrolling seamless pipe process of thermal treatment, mainly comprise operations such as quenching heat treated, quenching, tempering heating, aligning, cold bed cooling, flaw detection, collection of finished products.In the quenching heat-treatment process; What use was many at present is that the electricity consumption ruhmkorff coil carries out heat treated to steel pipe; This method exists soaking time to be restricted; The poor temperature uniformity of steel pipe integral, and when handling end-thickened oil pipe and drilling rod, the temperature of steel tube end part reinforcement and the temperature of body have certain difference can cause problems such as structural state and the mechanical property of pipe end and body be variant; In addition, the required installed capacity of the method for electricity consumption ruhmkorff coil heating steel pipe is very big, and the current consumption height causes the day-to-day operation cost higher.Quench treatment is carried out Water Quenching with the outer internal spray quenching apparatus that drenches to steel pipe usually, needs a large amount of water, has increased the consumption of the water resources and the energy.
Summary of the invention
The purpose of the utility model is to overcome the deficiency of above-mentioned technology; A kind of heat treatment system of hotrolling seamless pipe is provided, adopts the combustion gas walking beam heating furnace that steel pipe is quenched and heat and the tempering heating, make the steel pipe more even heating; Steel pipe structure property after the heat treated is good, and power consumption is few.Adopt tunnel like shrend mode to quench simultaneously, water consumption is few, cut down the consumption of energy, production safety, maintenance of the equipment are simple.This heat treatment system can be used for the tubing and casing of end upsetting and drilling rod are heat-treated simultaneously.
A kind of heat treatment system of hotrolling seamless pipe comprises: feeding skid, conveyor roller, quenching furnance, high pressure water descaling device, quenching device, control water bridging table, tempering stove, the first transition chain bed, the second transition chain bed, straightener, cold bed, pressure-vaccum apparatus for ash, straight degree inspection station, first bridging table, second bridging table, ultrasonic flaw detecting device, band saw, work in-process collecting frame, collection of finished products stand.Wherein, quenching furnance adopts the combustion gas walking beam heating furnace, and quenching device adopts the tunnel like granulating unit, and tempering stove adopts the combustion gas walking beam heating furnace.Feeding skid, quenching furnance, quenching device, control water bridging table, tempering stove, straightener, cold bed, straight degree inspection station, ultrasonic flaw detecting device are linked in sequence through conveyor roller successively, and steel pipe is carried on conveyor roller.Be provided with high pressure water descaling device between quenching furnance and the quenching device.The first transition chain bed is set between tempering stove and the straightener, between cold bed and the straight degree inspection station the second transition chain bed is set, and the pressure-vaccum apparatus for ash is set at the material loading end of the second transition chain bed.Between straight degree inspection station and the ultrasonic flaw detecting device first bridging table is set, ultrasonic flaw detecting device connects second bridging table through conveyor roller.Detecting flawless steel pipe through ultrasonic flaw detecting device collects on the collection of finished products stand.Defective steel pipe is delivered on the work in-process collecting frame after reconditioning, the overproof part of band saw excision wall thickness and collects.
The beneficial effect of the utility model: adopt the combustion gas walking beam heating furnace to quench and heat and the tempering heating; Make the steel pipe more even heating, even the oil pipe of end upsetting and drilling rod, steel pipe total length temperature deviation can reach≤and 5 ℃; Thereby make the steel pipe structure property better, and power consumption is few.Adopt before the shrend high-pressure water descaling to remove the iron scale on surface, can reduce iron scale and get into the inconvenience in the cleaning that quenching device brings, also make the quenching steel tube performance more even.Adopt the tunnel like granulating unit to quench, water consumption is few, cut down the consumption of energy, environmental protection, safety, maintenance of the equipment are simple.
Description of drawings
Fig. 1 is the synoptic diagram of the utility model hotrolling seamless pipe heat treatment system.
Wherein: 1, feeding skid; 2, conveyor roller; 3, quenching furnance; 4, high pressure water descaling device; 5, quenching device; 6, control water bridging table; 7, tempering stove; 8a, the first transition chain bed; 8b, the second transition chain bed; 9, straightener; 10, cold bed; 11, pressure-vaccum apparatus for ash; 12, straight degree inspection station; 13a, first bridging table; 13b, second bridging table; 14, ultrasonic flaw detecting device; 15, band saw; 16, work in-process collecting frame; 17, collection of finished products stand.
Embodiment
Below in conjunction with accompanying drawing, the utility model is further described.
The heat treatment system of hotrolling seamless pipe comprises: feeding skid 1, conveyor roller 2, quenching furnance 3, high pressure water descaling device 4, quenching device 5, control water bridging table 6, tempering stove 7, the first transition chain bed 8a, the second transition chain bed 8b, straightener 9, cold bed 10, pressure-vaccum apparatus for ash 11, straight degree inspection station 12, the first bridging table 13a, the second bridging table 13b, ultrasonic flaw detecting device 14, band saw 15, work in-process collecting frame 16, collection of finished products stand 17.Wherein, quenching furnance 3 adopts the combustion gas walking beam heating furnace, and quenching device 5 adopts the tunnel like granulating unit, and tempering stove 7 adopts the combustion gas walking beam heating furnace.
Feeding skid 1, quenching furnance 3, quenching device 5, control water bridging table 6, tempering stove 7, straightener 9, cold bed 10, straight degree inspection station 12, ultrasonic flaw detecting device 14 are linked in sequence through conveyor roller 2 successively, and steel pipe is carried on conveyor roller 2.Be provided with high pressure water descaling device 4 between quenching furnance 3 and the quenching device 5.Be provided with the first transition chain bed 8a between tempering stove 7 and the straightener 9, between cold bed 10 and the straight degree inspection station 12 the second transition chain bed 8b be set, and pressure-vaccum apparatus for ash 11 be set at the material loading end of the second transition chain bed 8b.Between straight degree inspection station 12 and the ultrasonic flaw detecting device 14 the first bridging table 13a is set, ultrasonic flaw detecting device 14 connects the second bridging table 13b through conveyor roller 2.The underproof steel pipe of straight degree is done marked, on the first bridging table 13a, pick out production line.Detecting flawless steel pipe through ultrasonic flaw detecting device 14 collects on collection of finished products stand 17.The defectiveness pipe is by the definite position of manual work with portable ultrasonic flaw detecting device inspection defective; And carry out reconditioning; The wall thickness of reconditioning place is used portable ultrasound examination again, and the overproof part of wall thickness is excised by band saw 15, and the steel pipe after the processing is collected on work in-process collecting frame 16.

Claims (6)

1. the heat treatment system of a hotrolling seamless pipe; Comprise: feeding skid (1), conveyor roller (2), quenching furnance (3), high pressure water descaling device (4), quenching device (5), control water bridging table (6), tempering stove (7), the first transition chain bed (8a), the second transition chain bed (8b), straightener (9), cold bed (10), pressure-vaccum apparatus for ash (11), straight degree inspection station (12), first bridging table (13a), second bridging table (13b), ultrasonic flaw detecting device (14), band saw (15), work in-process collecting frame (16), collection of finished products stand (17); It is characterized in that: quenching furnance (3) adopts the combustion gas walking beam heating furnace; Quenching device (5) adopts the tunnel like granulating unit, and tempering stove (7) adopts the combustion gas walking beam heating furnace.
2. the heat treatment system of hotrolling seamless pipe according to claim 1; It is characterized in that: feeding skid (1), quenching furnance (3), quenching device (5), control water bridging table (6), tempering stove (7), straightener (9), cold bed (10), straight degree inspection station (12), ultrasonic flaw detecting device (14) are linked in sequence through conveyor roller (2) successively, and steel pipe is gone up at conveyor roller (2) and carried.
3. the heat treatment system of hotrolling seamless pipe according to claim 1 is characterized in that: be provided with high pressure water descaling device (4) between quenching furnance (3) and the quenching device (5).
4. the heat treatment system of hotrolling seamless pipe according to claim 1; It is characterized in that: the first transition chain bed (8a) is set between tempering stove (7) and the straightener (9); Between cold bed (10) and the straight degree inspection station (12) the second transition chain bed (8b) is set, and pressure-vaccum apparatus for ash (11) is set at the material loading end of the second transition chain bed (8b).
5. the heat treatment system of hotrolling seamless pipe according to claim 1; It is characterized in that: between straight degree inspection station (12) and the ultrasonic flaw detecting device (14) first bridging table (13a) is set; Ultrasonic flaw detecting device (14) connects second bridging table (13b) through conveyor roller (2), directly spends underproof steel pipe and on first bridging table (13a), picks out production line.
6. the heat treatment system of hotrolling seamless pipe according to claim 1; It is characterized in that: detect flawless steel pipe through ultrasonic flaw detecting device (14) and on collection of finished products stand (17), collect, defective steel pipe is delivered on the work in-process collecting frame (16) after reconditioning, the overproof part of band saw (15) excision wall thickness and collects.
CN2012200572401U 2012-02-22 2012-02-22 Heat treatment system for hot-rolling seamless steel pipe Withdrawn - After Issue CN202543267U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200572401U CN202543267U (en) 2012-02-22 2012-02-22 Heat treatment system for hot-rolling seamless steel pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200572401U CN202543267U (en) 2012-02-22 2012-02-22 Heat treatment system for hot-rolling seamless steel pipe

Publications (1)

Publication Number Publication Date
CN202543267U true CN202543267U (en) 2012-11-21

Family

ID=47163932

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200572401U Withdrawn - After Issue CN202543267U (en) 2012-02-22 2012-02-22 Heat treatment system for hot-rolling seamless steel pipe

Country Status (1)

Country Link
CN (1) CN202543267U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102560057A (en) * 2012-02-22 2012-07-11 北京科大中冶技术发展有限公司 Heat treatment process method and system for hot rolled seamless steel tubes
CN105834248A (en) * 2016-04-06 2016-08-10 内蒙古包钢钢联股份有限公司 Flaw detection system device for steel pipe finishing line and flaw detection method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102560057A (en) * 2012-02-22 2012-07-11 北京科大中冶技术发展有限公司 Heat treatment process method and system for hot rolled seamless steel tubes
CN102560057B (en) * 2012-02-22 2014-04-16 北京科大中冶技术发展有限公司 Heat treatment process method and system for hot rolled seamless steel tubes
CN105834248A (en) * 2016-04-06 2016-08-10 内蒙古包钢钢联股份有限公司 Flaw detection system device for steel pipe finishing line and flaw detection method
CN105834248B (en) * 2016-04-06 2017-09-22 内蒙古包钢钢联股份有限公司 Steel-tube finishing line fault detection system device and method of detection

Similar Documents

Publication Publication Date Title
CN102560057B (en) Heat treatment process method and system for hot rolled seamless steel tubes
CN103103333B (en) Intermediate frequency quenching and tempering heat treatment process and special equipment for pin shaft
CN202543267U (en) Heat treatment system for hot-rolling seamless steel pipe
CN104862593A (en) Ferritic stainless steel seamless steel tube and preparation method thereof
CN201361788Y (en) Novel production equipment for titanic or titanium alloy pipe
CN201842865U (en) Straightening and quenching device for seamless steel pipe
CN201744485U (en) System for producing wide and heavy plate products
CN108531920A (en) A kind of pre-treating technology of hydraulic plunger workpiece
CN204918672U (en) Heat treating marquenching complete sets
CN201862638U (en) Hot charging system for continuous casting round billet of hot-rolled steel pipe
CN101768659B (en) Heat treatment technology of ultra-long mandrel
CN201713549U (en) Automatic heating and feeding device for hot heading ball billet of wind power steel ball
CN204058549U (en) A kind of hot rolled strip annealing furnace by-pass collar
CN207685320U (en) A kind of steel pipe intermediate frequency quenching and tempering device
CN204385238U (en) A kind of medium and small bar of quenched and tempered steel or tubing continuous refining heat treatment production line device
CN209368316U (en) A kind of seamless pipe bright annealing device
CN201183811Y (en) Steel tube, petroleum oil well pipe and drill rod intermediate frequency induction heating heat-treating apparatus
CN101591726B (en) Cold drawing method for medium-carbon steel bar
CN101811171A (en) Wind power steel ball hot-blocking blank automatic heating and feeding device
CN102864293B (en) Large-diameter steel pipe on-line bulk heat treatment system
CN205223301U (en) Quenching device
CN108559830A (en) A kind of system that hydraulic plunger workpiece is heat-treated
CN108588727B (en) A kind of surface processing technique of hydraulic plunger workpiece
CN203282172U (en) Novel automatic production line of pipeline elbows
CN205974581U (en) Thermal treatment heat sink with cold fast controllable and pressure detection mechanism

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20121121

Effective date of abandoning: 20140416

RGAV Abandon patent right to avoid regrant
DD01 Delivery of document by public notice

Addressee: Shi Jie

Document name: Notification that Application Deemed not to be Proposed