CN202541805U - Bidirectional scaffold supporting and clamping device - Google Patents

Bidirectional scaffold supporting and clamping device Download PDF

Info

Publication number
CN202541805U
CN202541805U CN2012200727332U CN201220072733U CN202541805U CN 202541805 U CN202541805 U CN 202541805U CN 2012200727332 U CN2012200727332 U CN 2012200727332U CN 201220072733 U CN201220072733 U CN 201220072733U CN 202541805 U CN202541805 U CN 202541805U
Authority
CN
China
Prior art keywords
fastening
horizontal direction
mounting board
vertical direction
clamping plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200727332U
Other languages
Chinese (zh)
Inventor
伍平平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHOUSHAN COSCO-SHIPYARD GROUP CO LTD
Original Assignee
ZHOUSHAN COSCO-SHIPYARD GROUP CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHOUSHAN COSCO-SHIPYARD GROUP CO LTD filed Critical ZHOUSHAN COSCO-SHIPYARD GROUP CO LTD
Priority to CN2012200727332U priority Critical patent/CN202541805U/en
Application granted granted Critical
Publication of CN202541805U publication Critical patent/CN202541805U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a bidirectional scaffold supporting and clamping device, which comprises a vertical fastening clamp, a horizontal fastening clamp, a scaffold steel pipe and two fasteners, wherein the lower end of the vertical fastening clamp is open and the horizontal fastening clamp is open towards a left side, so that a C-shaped clamp which is matched with the thickness of the free size of a steel plate required to be applied with force; the right side of the horizontal fastening clamp is fixedly connected with the upper end of the vertical fastening clamp; one end of the scaffold steel pipe is fixed on the upper part of the horizontal fastening clamp; and the two fasteners are arranged on the vertical fastening clamp and the horizontal fastening clamp respectively. Due to the adoption of the bidirectional scaffold supporting and clamping device, the problem of installation of a scaffold support on the free edge of any steel plate is solved, welding and grinding are not required, operation is easy, and repeatability, safety and environment friendliness are realized; and moreover, the bidirectional scaffold supporting and clamping device can be connected in the horizontal direction and the vertical direction, is simple in structure, is easy to manufacture, is easy for daily maintenance, is light in weight, and is low in manufacturing cost.

Description

Two-way scaffold propclip card device
Technical field
The utility model relates to a kind of propclip card device, particularly, relates to a kind of two-way scaffold propclip card device.
Background technology
In the existing Marine engineering, no matter shiprepair, shipbuilding for the construction of various specialized engineerings, need set up the scaffold operation platform on a large scale, high frequency time.The mode of setting up of the tradition landing stage of scaffold is to select ground or deck/platform as putting forth effort the strong point, upwards sets up scaffold needs construction until arrival height from level to level from bottom.Though this way has guaranteed scaffold and has had the firmly sturdy strong point of putting forth effort, and wastes great amount of manpower and material resources and man-hour, also need set up a lot of scaffolds for any little quantities of high-altitude sometimes.Another kind of comparatively improved mode is at the height and position place that needs engineering construction; At the hull steel body structure surface eye thimble that freezes; Pierce into steel pipe scaffold and fix fastening side in the eye thimble, can damage the hull steel body structure surface to a certain extent like this, operation is comparatively complicated; And degree of stability is also not high enough, therefore needs to do to improve further.
The utility model content
The problem that the utility model will solve is: to the problem of above-mentioned existence provide a kind of put forth effort to be fastened on any steel plate free edge, set up two-way easily and fast scaffold propclip card device.
The technical scheme that the utility model adopted is: a kind of two-way scaffold propclip card device is provided; Comprise the fastening mounting board of vertical direction, the fastening mounting board of horizontal direction, scaffolding steel pipe and two fasteners; The fastening mounting board lower ending opening of said vertical direction forms the C type mounting board that cooperates the steel plate free edge thickness that need put forth effort; Opening forms the C type mounting board that cooperates the steel plate free edge thickness that need put forth effort to the fastening mounting board of said horizontal direction towards the left side; Captive joint with the upper end of the fastening mounting board of said vertical direction court in the right side of the fastening mounting board of said horizontal direction court; One end of said scaffolding steel pipe is fixed on the top of the fastening mounting board of said horizontal direction, and said two fasteners are contained in respectively on fastening mounting board of said vertical direction and the fastening mounting board of horizontal direction.
Particularly; The fastening mounting board of said vertical direction comprises fastening left clamping plate of vertical direction and the fastening right clamping plate of vertical direction; The fastening mounting board of said horizontal direction comprises fastening train wheel bridge of horizontal direction and the fastening lower plate of horizontal direction; Fastening left clamping plate of said vertical direction and the fastening right clamping plate of vertical direction are slightly larger than the steel plate free edge thickness that need put forth effort to be separated by distance is provided with formation C type mounting board; Fastening left clamping plate of said vertical direction and the fastening right clamping plate of vertical direction all are fixed on the downside of the fastening train wheel bridge of said horizontal direction; Fastening external splint train wheel bridge of said horizontal direction and the fastening lower plate of horizontal direction are slightly larger than the steel plate free edge thickness that need put forth effort to be separated by distance is provided with formation C type mounting board; The fastening lower plate of said horizontal direction is fixed on the left side of the fastening right clamping plate of said vertical direction, and an end of said scaffolding steel pipe is fixed on the upside of the fastening train wheel bridge of said horizontal direction.
Preferably; Said fastener comprises two bolts and two nuts; Fastening left clamping plate of said vertical direction and the fastening train wheel bridge of horizontal direction are provided with perforate, and said two nuts dress is welded in the perforate of the fastening left clamping plate of vertical direction or the tapping of the fastening train wheel bridge of horizontal direction, reaches fastening purpose thereby withstand the steel plate free edge that need put forth effort through the bolt of screwing; And increased the screw-in thickness of bolt, strengthened the squareness and the fastening ability of control bolt.
Further, the junction of said scaffolding steel pipe and the fastening mounting board of said horizontal direction also is provided with deep bracket, has strengthened the constant intensity to scaffolding steel pipe.
Preferably; Said deep bracket comprises the L type deep bracket and the first triangle deep bracket; Said L type deep bracket and the fastening mounting board of said vertical direction and the fastening mounting board of horizontal direction are all fixing, and said first triangle deep bracket and said horizontal direction binding clip fasten.
Compared with prior art; The two-way scaffold propclip card device that the utility model provides has solved scaffold and has been supported on a difficult problem of installing on any steel plate free edge; Need not the welding polishing, simple to operate, can reuse; Safety and environmental protection is set up the tradition of landing scaffold or freezing eye thimble in midair in a large number before having changed and is set up the scaffold pattern; And two-way scaffold propclip card device can be connected with vertical direction in the horizontal direction, and is simple in structure, is easy to make, and daily attention is simple, and is in light weight, and cost of manufacture is low.
Description of drawings
Fig. 1 shows the schematic perspective view of the two-way scaffold propclip card device that provides among the utility model embodiment.
Fig. 2 shows the front elevation of the two-way scaffold propclip card device among the utility model embodiment.
Fig. 3 shows the lateral plan of the two-way scaffold propclip card device among the utility model embodiment.
Use scheme drawing when Fig. 4 shows the vertical coupled condition of two-way scaffold propclip card device among the utility model embodiment.
Use scheme drawing when Fig. 5 shows the vertical coupled condition of two-way scaffold propclip card device among the utility model embodiment.
The specific embodiment
Embodiment describes in further detail the utility model below in conjunction with accompanying drawing:
Embodiment: extremely shown in Figure 5 like Fig. 1; Two-way scaffold propclip card device in the present embodiment; Comprise the fastening mounting board of vertical direction, the fastening mounting board of horizontal direction, scaffolding steel pipe 9 and two fasteners; Be to set up the propclip card device that scaffold is used in a kind of Marine engineering; Can put forth effort to be fastened on the free edge of any steel plate (comprise landing slab, deck plate, bulkhead wallboard, girder web, band steel web, bulb flat web, T section bar panel, T section bar web etc. in length and breadth) in length and breadth, avoid welding, can direct convenience set up scaffold apace at the high empty position of required construction.
The fastening mounting board lower ending opening of vertical direction forms the C type mounting board that cooperates the steel plate 11 free edge thickness that need put forth effort; The fastening mounting board of vertical direction comprises fastening left clamping plate 1 of vertical direction and the fastening right clamping plate 2 of vertical direction; Size is 150mm length * 100mm, and wide * 12mm is thick, and fastening left clamping plate 1 of vertical direction and the fastening right clamping plate 2 of vertical direction are slightly larger than the steel plate 11 free edge thickness that need put forth effort to be separated by (40mm) distance is provided with formation C type mounting board.The all fixing dress of fastening left clamping plate 1 of vertical direction and the fastening right clamping plate 2 of vertical direction is welded in the downside of the fastening train wheel bridge 3 of horizontal direction, forms " F " shape structure.The fastening left clamping plate 1 of vertical direction the height center, about apart from the edge 1/4 extension position place, offer each 1 in Φ (diameter) 23mm bolt-through hole, each one on the nut of the M22 that freezes above, the maintenance of the center of nut and perforate center is concentric.
Opening forms the C type mounting board that cooperates the steel plate 11 free edge thickness that need put forth effort to the fastening mounting board of horizontal direction towards the left side, captives joint with the upper end of the fastening mounting board of vertical direction court in the right side of the fastening mounting board of horizontal direction court.The fastening mounting board of horizontal direction comprises fastening train wheel bridge 3 of horizontal direction and the fastening lower plate 4 of horizontal direction; The size of fastening train wheel bridge 3 of horizontal direction and the fastening lower plate 4 of horizontal direction is respectively that 150mm length * 164mm * 12mm is thick, 150mm is long * and 100mm * 12mm is thick; Fastening external splint train wheel bridge 3 of horizontal direction and the fastening lower plate 4 of horizontal direction are slightly larger than the steel plate 11 free edge thickness that need put forth effort to be separated by (40mm) distance is provided with formation C type mounting board, and the fastening lower plate 4 fixing dresses of horizontal direction are welded in the left sides of the fastening right clamping plate 2 of vertical direction.The fastening train wheel bridge 3 of horizontal direction about 50mm offers the position each 1 in Φ 23mm bolt-through hole far from the edge 1/4 extension position place, front and back apart from the edge, each one on the nut of the M22 that freezes above, the maintenance of the center of nut and perforate center is concentric.
Scaffolding steel pipe is the thick solid drawn pipe of conventional model Φ 51mm * 3.5mm, long 1000mm.One end of scaffolding steel pipe 9 is fixedly welded on the upside of the fastening train wheel bridge 3 of horizontal direction.Scaffolding steel pipe 9 is reinforced through deep bracket, and deep bracket comprises L type deep bracket 5 and two triangle deep brackets.L type deep bracket 5 is all fixing with fastening mounting board of vertical direction and the fastening mounting board of horizontal direction, and that L type deep bracket 5 is of a size of 200mm length * 80mm is wide * and 12mm is thick.The first triangle deep bracket, 6 dresses are soldered to the junction of fastening train wheel bridge 3 of horizontal direction and scaffolding steel pipe 9; Triangle deep bracket 10 dress is soldered to the junction of fastening right clamping plate 2 of vertical direction and the fastening lower plate 4 of horizontal direction, and the first triangle deep bracket 6 and triangle deep bracket 10 sizes are respectively 110mm length * 60mm wide * 12mm is thick and 80mm length * 40mm is wide * and 12mm is thick.
Two fasteners are contained in respectively on fastening mounting board of vertical direction and the fastening mounting board of horizontal direction.Each fastener comprises two M22 * 100 bolts 7 and two nuts 8; Withstand the purpose that steel plate 11 free edge that need put forth effort reach steel plate 11 free edge that fastening need put forth effort through the bolt 7 of screwing; Fastening left clamping plate 1 of vertical direction and the fastening train wheel bridge 3 of horizontal direction are provided with perforate; Two nut 8 dresses are welded in the perforate of the fastening left clamping plate 1 of vertical direction or the tapping of the fastening train wheel bridge 3 of horizontal direction, have increased the screw-in thickness of bolt 7, strengthen the squareness and the fastening ability of control bolt 7.
During making, at first the fastening train wheel bridge 3 of the horizontal direction of a perforate as the basis, on the vertical fastening train wheel bridge 3 of horizontal direction that is welded and assemblied on perforate of fastening right clamping plate of the vertical direction of fastening left clamping plate 1 of the vertical direction of perforate and not perforate 2; On the fastening right clamping plate 2 of vertical direction that vertically are assembled to not perforate to the fastening lower plate 4 of the horizontal direction of not perforate again; Be soldered to scaffolding steel pipe 9 dresses on the fastening train wheel bridge 3 of horizontal direction of perforate then; Be soldered to the first triangle deep bracket, 6 dresses on the fastening train wheel bridge 3 of horizontal direction and scaffolding steel pipe 9 of perforate again; Be soldered to " L " shape deep bracket 5 dress on the fastening train wheel bridge 3 of horizontal direction and scaffolding steel pipe 9 of the fastening left clamping plate of the vertical direction of perforate 1, perforate, be soldered to triangle deep bracket 10 dresses on the fastening lower plate 4 of horizontal direction of the fastening right clamping plate 2 of vertical direction and not perforate of not perforate then; Be soldered to 2 M22 nut dresses on the fastening train wheel bridge 3 of horizontal direction of perforate again; Be soldered to 2 M22 nuts, 8 dresses on the fastening left clamping plate 1 of vertical direction of perforate then; Be tightened on 4 M22 * 100 bolts 7 respectively on the M22 nut 8 at last.
During use; Position according to hull steel structural steel and iron free edge; The folder mouth between the fastening right clamping plate 2 of vertical direction of the fastening left clamping plate 1 of vertical direction and not perforate of perforate is selected in decision for use; Or the folder mouth between the fastening lower plate 4 of horizontal direction of fastening train wheel bridge 3 of the horizontal direction of selecting perforate for use and not perforate, unscrew 2 M22 * 100 bolts 7 that selected direction is pressed from both sides mouth, make steel plate 11 free edge put in the utility model folder mouth; These 2 M22 * 100 bolts 7 of screwing reach the purpose of fastening steel plate 11 free edge.

Claims (5)

1. two-way scaffold propclip card device; It is characterized in that: comprise the fastening mounting board of vertical direction, the fastening mounting board of horizontal direction, scaffolding steel pipe (9) and two fasteners; The fastening mounting board lower ending opening of said vertical direction forms the C type mounting board that cooperates steel plate (11) the free edge thickness that need put forth effort; Opening forms the C type mounting board that cooperates steel plate (11) the free edge thickness that need put forth effort to the fastening mounting board of said horizontal direction towards the left side; Captive joint with the upper end of the fastening mounting board of said vertical direction court in the right side of the fastening mounting board of said horizontal direction court; One end of said scaffolding steel pipe (9) is fixed on the top of the fastening mounting board of said horizontal direction, and said two fasteners are contained in respectively on fastening mounting board of said vertical direction and the fastening mounting board of horizontal direction.
2. two-way scaffold propclip card device according to claim 1; It is characterized in that: the fastening mounting board of said vertical direction comprises fastening left clamping plate of vertical direction (1) and the fastening right clamping plate of vertical direction (2); The fastening mounting board of said horizontal direction comprises fastening train wheel bridge of horizontal direction (3) and the fastening lower plate of horizontal direction (4); The fastening right clamping plate of fastening left clamping plate of said vertical direction (1) and vertical direction (2) are slightly larger than steel plate (11) the free edge thickness that need put forth effort to be separated by distance is provided with formation C type mounting board; The fastening right clamping plate of fastening left clamping plate of said vertical direction (1) and vertical direction (2) all are fixed on the downside of the fastening train wheel bridge of said horizontal direction (3); Fastening external splint train wheel bridge of said horizontal direction (3) and the fastening lower plate of horizontal direction (4) are slightly larger than steel plate (11) the free edge thickness that need put forth effort to be separated by distance is provided with formation C type mounting board; The fastening lower plate of said horizontal direction (4) is fixed on the left side of the fastening right clamping plate of said vertical direction (2), and an end of said scaffolding steel pipe (9) is fixed on the upside of the fastening train wheel bridge of said horizontal direction (3).
3. two-way scaffold propclip card device according to claim 2; It is characterized in that: said fastener comprises two bolts (7) and two nuts (8); Fastening left clamping plate of said vertical direction (1) and the fastening train wheel bridge of horizontal direction (3) are provided with perforate, and said two nuts (8) dress is welded in the perforate of the fastening left clamping plate of vertical direction (1) or the tapping of the fastening train wheel bridge of horizontal direction (3).
4. according to claim 1 or 2 or 3 described two-way scaffold propclip card devices, it is characterized in that: said scaffolding steel pipe (9) also is provided with deep bracket with the junction of the fastening mounting board of said horizontal direction.
5. two-way scaffold propclip card device according to claim 4; It is characterized in that: said deep bracket comprises the L type deep bracket (5) and the first triangle deep bracket (6); Said L type deep bracket (5) is all fixing with fastening mounting board of said vertical direction and the fastening mounting board of horizontal direction, and the said first triangle deep bracket (6) fastens with said horizontal direction binding clip.
CN2012200727332U 2012-03-01 2012-03-01 Bidirectional scaffold supporting and clamping device Expired - Fee Related CN202541805U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200727332U CN202541805U (en) 2012-03-01 2012-03-01 Bidirectional scaffold supporting and clamping device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200727332U CN202541805U (en) 2012-03-01 2012-03-01 Bidirectional scaffold supporting and clamping device

Publications (1)

Publication Number Publication Date
CN202541805U true CN202541805U (en) 2012-11-21

Family

ID=47162476

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200727332U Expired - Fee Related CN202541805U (en) 2012-03-01 2012-03-01 Bidirectional scaffold supporting and clamping device

Country Status (1)

Country Link
CN (1) CN202541805U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104590507A (en) * 2015-01-29 2015-05-06 上海外高桥造船海洋工程有限公司 Scaffold used on ship
CN109537919A (en) * 2018-09-29 2019-03-29 沪东中华造船(集团)有限公司 A kind of quick erection method being segmented tongue and groove fence

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104590507A (en) * 2015-01-29 2015-05-06 上海外高桥造船海洋工程有限公司 Scaffold used on ship
CN109537919A (en) * 2018-09-29 2019-03-29 沪东中华造船(集团)有限公司 A kind of quick erection method being segmented tongue and groove fence
CN109537919B (en) * 2018-09-29 2021-06-01 沪东中华造船(集团)有限公司 Quick erecting method of segmented tongue-and-groove fence

Similar Documents

Publication Publication Date Title
CN207728795U (en) Crane span structure antidetonation suspension and support
CN201981670U (en) Connection piece for composite prefabricated concrete wallboard
CN201763002U (en) Independent adjustable steel supporting device
CN204023801U (en) Steel column butt joint linkage
CN204418022U (en) Full bolt connects assembled tool type steel pipe post pylon
CN202541805U (en) Bidirectional scaffold supporting and clamping device
CN202388112U (en) Mounting device of arc striking and extinguishing plate
CN210289148U (en) Be used for building aluminium template bracing piece iron pipe
CN206091265U (en) Detachable anchor ring device
CN205805002U (en) A kind of safety rope fixing device for job site
CN204023319U (en) For the triangular tower of cableway of constructing
CN203346897U (en) Foundation raft embedded steel column positioning support
CN100537974C (en) Working pedal fixing device
CN207436357U (en) Hook-hang type metallic plate suspended ceiling device can be opened
CN201825224U (en) Scaffold device for body section
CN202165696U (en) Cable bridge fixing support clamping device of joist steel
CN203889956U (en) Rod-attached-to-wall connecting piece device for tower crane mounting
CN209652763U (en) The fixed structure of Bailey bracket connection
CN202971741U (en) Safety rope fixing device
CN203452270U (en) Steel reinforcement protective layer controlled horse-shaped stool
CN205089034U (en) Constant diameter pole pole setting ware
CN202181614U (en) Steel pipe fixing device for joist steel
CN203462586U (en) Large steel corbel combination structure with side baffles
CN203097128U (en) Central support wind-proof fixture for JCH-III roof boarding
CN206693473U (en) Assembled open-type building bottom plate purlin substitutes erection support and mounting assembly

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121121

Termination date: 20180301

CF01 Termination of patent right due to non-payment of annual fee