CN202531020U - Long earth auger using hydraulic main hoist - Google Patents

Long earth auger using hydraulic main hoist Download PDF

Info

Publication number
CN202531020U
CN202531020U CN2012200330671U CN201220033067U CN202531020U CN 202531020 U CN202531020 U CN 202531020U CN 2012200330671 U CN2012200330671 U CN 2012200330671U CN 201220033067 U CN201220033067 U CN 201220033067U CN 202531020 U CN202531020 U CN 202531020U
Authority
CN
China
Prior art keywords
main hoist
hydraulic
hydraulic pressure
auger
earth auger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012200330671U
Other languages
Chinese (zh)
Inventor
任锐
张庆伟
李红彪
王长生
刘小辉
于凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
713th Research Institute of China Shipbuilding Industry Corp
713th Research Institute of CSIC
Original Assignee
713th Research Institute of China Shipbuilding Industry Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 713th Research Institute of China Shipbuilding Industry Corp filed Critical 713th Research Institute of China Shipbuilding Industry Corp
Priority to CN2012200330671U priority Critical patent/CN202531020U/en
Application granted granted Critical
Publication of CN202531020U publication Critical patent/CN202531020U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

A long earth auger using a hydraulic main hoist consists of a pile frame, a drilling system and a hydraulic main hoist system, wherein the pile frame comprises a chassis as well as a frame lifting device and an upright column which are connected with the chassis; a main pump motor is arranged on the chassis; the main pump motor drives the hydraulic main hoist in the hydraulic main hoist system to work; the hydraulic main hoist is connected with the drilling system through a steel wire rope and a pulley block; and the drilling system consists of a hydraulic power head, an auger stem and an auger bit which are sequentially connected with one another. When the hydraulic main hoist provided by the utility model is applied to a large-diameter deep-hole long earth auger, because the hydraulic main hoist is stable to control speed and is not influenced by active load, compared with the traditional long earth auger with an electric main hoist in China, the long earth auger using the hydraulic main hoist has the advantages of small vibration, no noise, large output torque and strong adaptability to stratums and the like; and the long earth auger using the hydraulic main hoist solves problems of big motion image, incapability of precisely regulating speed and easy blocking and jamming of the auger bit, resulting from the weak points such as the load characteristics of the motor when the traditional long earth auger with the electric main hoist is used for drilling holes or the auger bit is pulled out.

Description

A kind of full screw earth auger that adopts the hydraulic pressure main winch
Technical field
The utility model relates to the piling machinery in the engineering machinery field, specifically a kind of full screw earth auger that can adapt to the employing hydraulic pressure main winch of field large diameter, deep borehole pore-forming needs such as building, bridge, railway better.
Background technology
Domestic full screw earth auger main winch all adopts automatically controlled form at present, carries out step speed regulation through cam controller.Not enough below this structure exists: 1. because the load characteristic of motor, it is big to cause motion to impact, and accurately speed governing can't realize that the high pulling torque slow-speed of revolution steadily holes.2. unit head and drilling system move downward by gravity when holing, when having initiatively load, because hoist engine can't provide a stable lowering velocity for drilling system; Cause transfer when operation speed can be more and more faster; Must manpower compress brake and just can control lowering velocity well, bring inconvenience to the operator, if the brake(-holder) block serious wear; Be easy to cause major accident, borehole stability property deficiency also makes complete machine have very big potential safety hazard.3. the automatically controlled main winch that uses on present domestic full screw earth auger output torque and pulling force under the restriction of space, chassis size is limited, can not adapt to the needs of field large diameter, deep boreholes such as building, bridge, railway.
Summary of the invention
The utility model solves the technical scheme that its technical problem adopted: replace automatically controlled main winch to solve having now problems such as full screw earth auger borehole stability property is poor, output torque is little and pulling force is little with the hydraulic pressure main winch, satisfy large diameter, deep borehole pore-forming needs.
For addressing the above problem, the utility model adopts following technical scheme:
The utility model is made up of pile frame, drilling system and hydraulic pressure master winch system; Described pile frame comprises chassis and rack device and the column that are connected with the chassis, on described chassis, main pump motor is set, and main pump motor drives the hydraulic pressure main winch work in the hydraulic pressure master winch system; Described hydraulic pressure main winch is connected drilling system through wire rope with assembly pulley; Described drilling system is made up of the hydraulic power head, auger stem and the augers that connect successively.
Between described chassis and the column diagonal brace is set.
Described hydraulic pressure master winch system comprises drive motors, and drive motors is connected with hydraulic pump, and described hydraulic pump is gone into main valve with the oil pump in the hydraulic oil container, and main valve is connected with the motor of hydraulic pressure main winch.
Described main valve also is connected with equalizing valve.
A kind of long-spiral drilling machine of hydraulic pressure main winch and long-spiral drilling machine of domestic used automatically controlled main winch of adopting of the utility model compared; Has following beneficial effect: when the utility model hydraulic pressure main winch is used for the large diameter, deep borehole full screw earth auger; Because it is speed controlling and do not receive the initiatively characteristic of load effect stably; Compare with the automatically controlled master winch full screw earth auger of present domestic use have that vibration is little, noiselessness, output torque reach advantages such as the stratum adaptive capacity is strong greatly; Be very suitable for the application of large diameter, deep borehole full screw earth auger, solved traditional automatically controlled master winch full screw earth auger boring and pull out when boring because problems such as big, accurately speed governing, easy vexed drill chuck brill are impacted in the motion that the weakness such as load characteristic of motor cause.At present domestic in addition electric-controlled type full screw earth auger pulling force is at 64 tons to 80 tons; The bore diameter limit is 0.8 meter; Drilling depth is below 32 meters; The pulling force that hydraulic pressure master winch full screw earth auger is 100 tons can satisfy once the stake hole that drill diameter 1.2m is dark 35 meters efficiently, has adapted to the needs of field large diameter, deep boreholes such as building, bridge, railway.
Description of drawings
Fig. 1 is the full screw earth auger structure chart of the utility model.
Fig. 2 is the hydraulic pressure main winch schematic diagram of the utility model.
The specific embodiment
As shown in Figure 1, the utility model is made up of pile frame, drilling system and hydraulic pressure master winch system; Pile frame comprises chassis 8 and the rack device 3 and column 4 that are connected with chassis 8, and wherein, column 4 and chassis 8 vertical settings for strengthening supporting role, are provided with diagonal brace 7 between chassis 8 and column 4.Main pump motor 1 is set on chassis 8, and main pump motor 1 drives hydraulic pressure main winch 10 work in the hydraulic pressure master winch system; Hydraulic pressure main winch 10 is connected drilling system through wire rope with assembly pulley; Drilling system is made up of the hydraulic power head 5, auger stem 6 and the augers 9 that connect successively.
During work, main pump motor 1 driving hydraulic pump is that hydraulic pressure main winch 10 provides stable oil pressure during boring, makes the running of main winch constant speed; Main winch is transferred hydraulic power head 5, auger stem 6 and augers 9 through wire rope and assembly pulley, and hydraulic power head 5 drives auger stem 6 and augers 9 rotations simultaneously, batch (-type) is carried out on the stratum creep into; Until the degree of depth that requires; Auger stem 6 and augers 9 are extracted in hydraulic pressure main winch 10 counter-rotatings then, accomplish once boring.
Hydraulic pressure master winch system comprises drive motors 11, and drive motors 11 is connected with hydraulic pump 12, and hydraulic pump 12 is gone into main valve 13 with the oil pump in the hydraulic oil container 2, is connected with hydraulic control guide handle 16 on the main valve 13.Simultaneously, the output of main valve 13 also is connected with the motor 14 of hydraulic pressure main winch 10.
Hydraulic pressure master winch system works principle is following, and drive motors 11 drives hydraulic pump 12, pressure oil is provided for main valve 13; Main valve 13 is the hydraulic control proportional control; Through pulling guide's handle 16, main valve 13 is opened, and provided a constant flow rate to supply with to hoist engine hydraulic motor 14 to different angles; Hoist engine can constant speed be turned round, thereby reach the meticulous manipulation of wanting.In addition, between main valve 13 and motor 14, equalizing valve 15 is set, equalizing valve 15 guarantees when having initiatively load in system that hoist engine can not quicken to descend the even running of hoist engine when guaranteeing to transfer because of weight.

Claims (4)

1. full screw earth auger that adopts the hydraulic pressure main winch, it is characterized in that: it is made up of pile frame, drilling system and hydraulic pressure master winch system; Described pile frame comprises chassis (8) and rack device (3) and the column (4) that are connected with chassis (8); Main pump motor (1) is set on described chassis (8), and main pump motor (1) drives hydraulic pressure main winch (10) work in the hydraulic pressure master winch system; Described hydraulic pressure main winch (10) is connected drilling system through wire rope with assembly pulley; Described drilling system is made up of the hydraulic power head (5), auger stem (6) and the augers (9) that connect successively.
2. the full screw earth auger of employing hydraulic pressure main winch according to claim 1 is characterized in that: between described chassis (8) and the column (4) diagonal brace (7) is set.
3. the full screw earth auger of employing hydraulic pressure main winch according to claim 1; It is characterized in that: described hydraulic pressure master winch system comprises drive motors (11); Drive motors (11) is connected with hydraulic pump (12); Described hydraulic pump (12) is gone into main valve (13) with the oil pump in the hydraulic oil container (2), and main valve (13) is connected with the motor (14) of hydraulic pressure main winch (10).
4. the full screw earth auger of employing hydraulic pressure main winch according to claim 3 is characterized in that: described main valve (13) also is connected with equalizing valve (15).
CN2012200330671U 2012-02-02 2012-02-02 Long earth auger using hydraulic main hoist Expired - Lifetime CN202531020U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200330671U CN202531020U (en) 2012-02-02 2012-02-02 Long earth auger using hydraulic main hoist

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200330671U CN202531020U (en) 2012-02-02 2012-02-02 Long earth auger using hydraulic main hoist

Publications (1)

Publication Number Publication Date
CN202531020U true CN202531020U (en) 2012-11-14

Family

ID=47132210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200330671U Expired - Lifetime CN202531020U (en) 2012-02-02 2012-02-02 Long earth auger using hydraulic main hoist

Country Status (1)

Country Link
CN (1) CN202531020U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104329020A (en) * 2014-10-14 2015-02-04 北京中岩大地工程技术有限公司 Reinforced long-screw rock-socketed construction equipment and process thereof
CN109989709A (en) * 2019-04-03 2019-07-09 江苏省建筑工程集团有限公司 A kind of electric screw drilling machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104329020A (en) * 2014-10-14 2015-02-04 北京中岩大地工程技术有限公司 Reinforced long-screw rock-socketed construction equipment and process thereof
CN109989709A (en) * 2019-04-03 2019-07-09 江苏省建筑工程集团有限公司 A kind of electric screw drilling machine

Similar Documents

Publication Publication Date Title
CN208267757U (en) A kind of efficient pile driving equipment of road construction
CN205840770U (en) A kind of impact type rotary drilling rig device being applicable to heavy caliber construction
CN203201472U (en) Rock drilling machine and rotary-cut percussion drilling system thereof
CN102535445B (en) Molding device and molding method for long spiral extruding rock-entering cast-in-place pile
CN206290225U (en) A kind of multifunctional drill clamper
CN202417306U (en) Novel water well drilling machine
CN103147711B (en) A kind of milling tool for oil well, well and using method thereof
CN202970677U (en) Long spiral drilling machine
CN102852457A (en) Follow-up drilling machine for down-hole hammer casing pipe
CN203161147U (en) Milling tool used for oil well or water well
CN103410435B (en) A kind of High-speed Electric of coring for deep hole drives top to drive
CN202531020U (en) Long earth auger using hydraulic main hoist
CN202300240U (en) Single-guide rail dual-hydraulic cylinder high-accuracy bit feeding system
CN202131986U (en) Pile driver
CN217897763U (en) Drilling device for shallow geothermal water exploitation
CN107420041B (en) Full hydraulic power head core drill without drilling tower
CN202451046U (en) Dual-purpose integral hydraulic power head of long spiral drilling machine
CN206888914U (en) One kind can reaming helicoid hydraulic motor
CN203050497U (en) Rotary device and oil-water well drilling repair dynamic rotary system using same
CN214460373U (en) Pipe rubbing machine
CN201288500Y (en) Rotary drilling hydraulic power head with vibrator
CN203463039U (en) Hydraulic elevator turning driver
CN103630348B (en) Turbine drilling technology experimental provision
CN203606126U (en) Turbine drilling technology experimental device
CN206144459U (en) Formula core drill is driven on top

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20121114