CN202530471U - Composite pile foundation for circular coal yard with soft soil foundation - Google Patents

Composite pile foundation for circular coal yard with soft soil foundation Download PDF

Info

Publication number
CN202530471U
CN202530471U CN2012201659192U CN201220165919U CN202530471U CN 202530471 U CN202530471 U CN 202530471U CN 2012201659192 U CN2012201659192 U CN 2012201659192U CN 201220165919 U CN201220165919 U CN 201220165919U CN 202530471 U CN202530471 U CN 202530471U
Authority
CN
China
Prior art keywords
foundation
pile
coal
composite pile
composite
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012201659192U
Other languages
Chinese (zh)
Inventor
林少波
郭俊东
陈飞
徐勍
胡士林
干梦军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Power Engineering Consulting Group East China Electric Power Design Institute Co Ltd
Original Assignee
China Power Engineering Consulting Group East China Electric Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Power Engineering Consulting Group East China Electric Power Design Institute Co Ltd filed Critical China Power Engineering Consulting Group East China Electric Power Design Institute Co Ltd
Priority to CN2012201659192U priority Critical patent/CN202530471U/en
Application granted granted Critical
Publication of CN202530471U publication Critical patent/CN202530471U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a composite pile foundation for a circular coal yard with a soft soil foundation. The composite pile foundation comprises a foundation pile, the top of the foundation pile is provided with a supporting plate, a cushion layer is laid on the supporting plate, and a biaxial geogrid is arranged in the cushion layer. The joint working effect of pile soil is made full use of to bear coal stacking load, the construction cost of foundation engineering is greatly reduced, soil excavation and backfill quantity are correspondingly decreased, the construction period can be shortened, the engineering cost is reduced, and remarkable economic and social benefits are achieved.

Description

The composite pile foundation of the circular coal yard of soft foundation
Technical field
The utility model relates to large-scale circular coal yard technical field, particularly a kind of composite pile foundation that is used for the circular coal yard of soft foundation.
Background technology
Circular coal yard: circular coal yard is that annular concrete coal-stopping wall and top steel work space net rack dome are formed, and is used for piling up the storage raw coal.Set inside is around rotating cantilever stacker of central post and pitching scraper reclaimer.Raw coal is by the stacker-reclaimer top fed,, get by the scraper reclaimer rotation and to expect coal yard center ground reception bunker to the coal yard coal piling through the rotation stacker, and through the feeder under the coal bunker and coal conveyer belts from bottom discharge.The coal yard system is storing and is getting in the material process, and no dust escapes good environmental protection, generally adopts the program centralized Control, and automaticity is high.Large-scale circular sealing coal yard typically has a diameter from 30~120m
Composite pile foundation: composite pile foundation is the basis of a kind of stake and the common bearing load of inter-pile soil body, and upper load is at first passed to stake by cushion cap, when the stake bearing capacity that reaches capacity; When certain thorn people's sedimentation takes place; Load just begins to shift to inter-pile soil gradually, can the bearing capacity of stake be used the limit, utilizes its bigger sedimentation to make inter-pile soil bear the load of a part then; Thereby reduce the usage quantity of engineering piles, reach the purpose of saving cost.
Large-scale circular sealing coal yard foundation adopts raft type base plate pile foundation on the existing soft foundation; Because the coal piling load is big; Maximum reaches 300Kpa, and raft type base plate thickness is very big, and amount of reinforcement increases on the one hand; Thereby strengthened the corresponding increase pile foundation of the load quantity that the bottom pile foundation is born on the one hand again, the ground foundation engineering expenditure of construction is very high.Because foundation area is bigger, and buried depth is darker, the excavation and the stemming operation amount of the earthwork are bigger in addition, and corresponding expense is also higher.
The utility model content
The purpose of the utility model is to provide the composite foundation pile of the circular coal yard of a kind of soft foundation, can make full use of the native co-operation effect of stake and bear the coal piling load, significantly reduces the ground foundation engineering expenditure of construction.
For realizing above-mentioned purpose, the composite foundation pile that the circular coal yard of a kind of soft foundation is provided of the utility model comprises foundation pile, and the foundation pile top is provided with supporting plate, lays bed course on the supporting plate, is provided with two-way GSZ in the bed course.
In another preference, lay silt between supporting plate and the bed course.
In another preference, two-way GSZ is processed by bamboo clappers or composited steel and plastic decking.
In another preference, two-way GSZ is three layers, is arranged in top, middle part and the bottom of bed course.
In another preference, the distance between three layers of two-way GSZ is 150-300mm.
In another preference, two-way GSZ end is provided with curved anchor near the coal-stopping wall place.
In another preference, bed course is cinder bed course or hardcore bed.
In another preference, the coal-stopping wall foundation pile is a castinplace pile.
In another preference, castinplace pile adopts the segmentation arrangement of reinforcement.
In another preference, coal piling district foundation pile adopts the PHC stake.
In another preference, the diameter of PHC stake is 300-500mm.
In another preference, composite pile foundation is pressed annular array and is distributed in circular coal yard.
The beneficial effect of the utility model is: large-scale circular seals in the coal yard structural configuration system on the soft foundation that the utility model proposes; The coal yard foundation adopts the PHC composite pile foundation; Make full use of the native co-operation effect of stake and bear the coal piling load; Significantly reduce the ground foundation engineering expenditure of construction, the also corresponding minimizing with the backfill amount of soil excavation simultaneously helps shortening construction duration and reduces construction costs, brings remarkable economic efficiency and social benefit.
Description of drawings
Fig. 1 is the structural representation of the composite foundation pile of the circular coal yard of the soft foundation of the utility model preferred embodiments.
Fig. 2 is the structural representation of the composite foundation pile of the circular coal yard of the soft foundation of the utility model preferred embodiments near the coal-stopping wall place.
The specific embodiment
For letting above-mentioned purpose, the feature and advantage of the utility model can be more obviously understandable, elaborate below in conjunction with the specific embodiment of accompanying drawing to the utility model.At first need to prove; The utility model is not limited to the following specific embodiment; Those skilled in the art should understand the utility model from the spirit that following embodiment embodied, and each technical term can be done the most wide in range understanding based on the spirit of the utility model.Same or analogous member uses the same reference numerals to represent among the figure.
Below in conjunction with accompanying drawing and embodiment the utility model is elaborated:
Fig. 1, Fig. 2 show the preferred embodiments of the composite foundation pile of the circular coal yard of this soft foundation of the utility model.Fig. 1 is that structural representation, Fig. 2 of this composite foundation pile is the structural representation near the coal-stopping wall place of this composite foundation pile.The composite foundation pile of the circular coal yard of this soft foundation comprises: foundation pile 1, foundation pile 1 top is provided with supporting plate 2, lays bed course 3 on the supporting plate 2, is provided with two-way GSZ 4 in the bed course 3.
The composite foundation pile of the circular coal yard of the soft foundation that the utility model proposes; The coal yard foundation can adopt the PHC composite pile foundation; Make full use of the native co-operation effect of stake and bear the coal piling load; Significantly reduce the ground foundation engineering expenditure of construction, the also corresponding minimizing with the backfill amount of soil excavation simultaneously helps shortening construction duration and reduces construction costs.
Lay silt 5 between supporting plate 2 and the bed course 3.In addition, be appreciated that in some other embodiment of the utility model, can also do not lay silt 5 between supporting plate 2 and the bed course 3 and directly lay rubble.
Two-way GSZ 4 is processed by bamboo clappers or composited steel and plastic decking.Because the large tracts of land preloading in coal piling district, the top layer soil body will produce lateral deformation, be that bed course 3 jointly bear by foundation pile 1 with the inter-pile soil layer with coal piling load; Reduced the ground foundation engineering expenditure of construction widely; Bamboo clappers and composited steel and plastic decking run into the pressure elastically deformable because it has toughness, transfer loads in the stake; Reduce the loading force that the stake top receives, improved the overall performance of ground.
Two-way GSZ 4 is three layers, is arranged in top, middle part and the bottom of bed course 3.The two-way GSZ 4 of this kind is provided with compared to original valve type base plate bed course, and thickness reduces greatly, has reduced construction cost simultaneously.In addition, in some other embodiment of the utility model, this two-way GSZ 4 is double-deck.
Distance between three layers of two-way GSZ 4 is 150-300mm.Preferable, the distance between three layers of two-way GSZ 3 is 200mm.
Referring to Fig. 2, two-way GSZ 4 ends are provided with curved anchor 6 near the coal-stopping wall place.Near the coal-stopping wall place, bed course 3 can produce lateral pressure to coal-stopping wall, reduce the supporting capacity of coal-stopping wall.Through curved anchor 6 is set in two-way GSZ 4 ends near coal-stopping wall, the lateral force of hardcore bed 3 of can loading, thus improved the supporting capacity of coal-stopping wall.
Bed course 3 is cinder bed course or hardcore bed.Bed course 3 can carry the pressure of the coal in coal piling district uniformly for cinder bed course or hardcore bed 3.In addition, in some other embodiment of the utility model, also can adopt other broken shape hard materials as bed course 3.
Coal-stopping wall foundation pile 1 is a castinplace pile.Foundation pile adopts castinplace pile, so that consider that the influence of soft foundation lateral deformation extruding pile body is by the stressed segmentation design of reinforcement of carrying out of pile body.
Coal piling district foundation pile 1 adopts the PHC stake.The pile strength of PHC stake is high: the above concrete of C80 is all adopted in the PHC stake, adopts pretensioned prestressing to make, thereby bearing capacity is high, can resist bigger cracking resistance moment of flexure.Have stronger service behaviour, pile body can remain intact under tight bad construction environment, significantly reduces and splits stake, the generation of fracture accident.PHC stake penetration power is strong, under the enough pressure, can pass through thicker chiltern soil layer, guarantees that stake end build-in is in bearing stratum preferably.In addition, because the bearing capacity of single pile of PHC stake is higher relatively, amount of concrete that its ring section is consumed is less, thereby unit bearing capacity cost is economized most.Preferably, selecting the diameter of PHC stake for use is 300-500mm.
Composite pile foundation is pressed annular array and is distributed in circular coal yard.In addition, in some other embodiment of the utility model, the array distribution that composite pile foundation also can be at a certain distance.
At present, it is in the majority to build coal yard in coastal riverine area, and this area is mainly marine facies, delta facies cohesive soil deposit or the river drift that the later stage in the Quaternary Period forms; The characteristics of this type soil are that natural moisture content is high, and natural void ratio is big, and shear strength is low; Compression coefficient is high; Transmission coefficient is little, and thixotropy is remarkable, belongs to typical soft foundation.According to statistics, the domestic round sealed coal yard construction work expense of having moved is about 6000~7,500 ten thousand at present.In the construction work expense, the cost proportion about 40% that soft foundation round sealed coal yard ground foundation engineering is shared.Adopt the composite foundation pile of the circular coal yard of soft foundation of the utility model proposition to arrange, generally can save cost 800~1,200 ten thousand, that is considerable especially to the investment influence if build two or more circular coal yards the same period.
Should be understood that after having read the above-mentioned teachings of the utility model, those skilled in the art can do various changes or modification to the utility model, these equivalent form of values fall within the application's appended claims institute restricted portion equally.

Claims (10)

1. the composite pile foundation of the circular coal yard of soft foundation is characterized in that, comprises foundation pile, and said foundation pile top is provided with supporting plate, lays bed course on the supporting plate, is provided with two-way GSZ in the bed course.
2. composite pile foundation according to claim 1 is characterized in that, lays silt between said supporting plate and the bed course.
3. composite pile foundation according to claim 1 is characterized in that, said two-way GSZ is processed by bamboo clappers or composited steel and plastic decking.
4. composite pile foundation according to claim 1 is characterized in that, said two-way GSZ is three layers, is arranged in top, middle part and the bottom of bed course.
5. composite pile foundation according to claim 4 is characterized in that, the distance between said three layers of two-way GSZ is 150-300mm.
6. composite pile foundation according to claim 1 is characterized in that, said two-way GSZ end is provided with curved anchor near the coal-stopping wall place.
7. composite pile foundation according to claim 1 is characterized in that, said bed course is cinder bed course or hardcore bed.
8. composite pile foundation according to claim 1 is characterized in that, the coal-stopping wall foundation pile is a castinplace pile.
9. composite pile foundation according to claim 1 is characterized in that, coal piling district foundation pile adopts the PHC stake.
10. composite pile foundation according to claim 9 is characterized in that, the diameter of said PHC stake is 300-500mm.
CN2012201659192U 2012-04-18 2012-04-18 Composite pile foundation for circular coal yard with soft soil foundation Expired - Lifetime CN202530471U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201659192U CN202530471U (en) 2012-04-18 2012-04-18 Composite pile foundation for circular coal yard with soft soil foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201659192U CN202530471U (en) 2012-04-18 2012-04-18 Composite pile foundation for circular coal yard with soft soil foundation

Publications (1)

Publication Number Publication Date
CN202530471U true CN202530471U (en) 2012-11-14

Family

ID=47131666

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201659192U Expired - Lifetime CN202530471U (en) 2012-04-18 2012-04-18 Composite pile foundation for circular coal yard with soft soil foundation

Country Status (1)

Country Link
CN (1) CN202530471U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103374922A (en) * 2012-04-18 2013-10-30 中国电力工程顾问集团华东电力设计院 Composite pile foundation of soft-soil-foundation round coal field
CN103388342A (en) * 2013-07-30 2013-11-13 大连市建筑设计研究院有限公司 Composite foundation and design method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103374922A (en) * 2012-04-18 2013-10-30 中国电力工程顾问集团华东电力设计院 Composite pile foundation of soft-soil-foundation round coal field
CN103388342A (en) * 2013-07-30 2013-11-13 大连市建筑设计研究院有限公司 Composite foundation and design method thereof
CN103388342B (en) * 2013-07-30 2015-05-20 大连市建筑设计研究院有限公司 Composite foundation and design method thereof

Similar Documents

Publication Publication Date Title
CN110984214B (en) Marine wind power single pile-wing plate-rock-fill composite foundation and construction method thereof
CN202718080U (en) Composite foundation with piles sacked in geotextile sacks
CN202117068U (en) Micropile plate-type composite foundation
CN112627225A (en) Composite foundation structure of offshore wind power single pile, supporting disc and small suction bucket and construction method thereof
CN206308701U (en) A kind of important actor back taper basis high
CN207749529U (en) A kind of offshore wind farm combined type single-pile foundation
CN104372806B (en) Reinforced concrete hollow cone mountain area wind-powered electricity generation flexible foundation and construction method thereof
CN202809501U (en) Reinforced load reducing structure of motorway high filling culvert in mountainous area
CN110792095B (en) Multi-pile bearing platform-spiral anchor composite foundation
CN102031781A (en) Foundation pit reinforcing technology from shallow position to deep position for group pit construction
CN202530471U (en) Composite pile foundation for circular coal yard with soft soil foundation
CN101302756A (en) Novel geogrid
CN214401870U (en) Composite foundation structure of offshore wind power single pile, supporting disc and small suction bucket
CN207582459U (en) A kind of prefabricated steel-pipe pile of variable cross-section
CN202220341U (en) Support structure for foundation pit in sludge
CN210507392U (en) Structural layer formed rapidly in soft foundation field
CN203080515U (en) Large-diameter steel pipe foundation pile with grouting accessory
CN103374922A (en) Composite pile foundation of soft-soil-foundation round coal field
CN208039239U (en) A kind of Novel variable-section prefabricated pile
CN202969405U (en) Cup-shaped concrete foundation of wind power generation tower
CN212956589U (en) Self-balancing structure formed by sludge discharge field expansion and cofferdam stability augmentation method based on horizontal drainage system
CN206829168U (en) A kind of hollow digging foundation of root keyed for transmission line of electricity
CN202954372U (en) Novel rubber cement soil pile composite foundation
CN111608134A (en) Deep cement stirring soil retaining structure for reinforcing bank slope of high-pile wharf
CN2589514Y (en) Vertical load-supporting pile having buoyancy pontoon for pile foundation wharf

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20121114

CX01 Expiry of patent term