CN202522896U CN2012202124467U CN201220212446U CN202522896U CN 202522896 U CN202522896 U CN 202522896U CN 2012202124467 U CN2012202124467 U CN 2012202124467U CN 201220212446 U CN201220212446 U CN 201220212446U CN 202522896 U CN202522896 U CN 202522896U
Authority
CN
China
Prior art keywords
construction
alarm
camera
communicated
main controller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012202124467U
Other languages
Chinese (zh)
Inventor
崔明欣
张建华
韦小兵
李绍平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeast Petroleum University
Original Assignee
Northeast Petroleum University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeast Petroleum University filed Critical Northeast Petroleum University
Priority to CN2012202124467U priority Critical patent/CN202522896U/en
Application granted granted Critical
Publication of CN202522896U publication Critical patent/CN202522896U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a management and monitor system of an engineering site operation state, which is characterized by comprising a main controller arranged in a monitoring room, a display, a camera, an alarm and an illuminating lamp, wherein the camera, the alarm and the illuminating lamp are arranged in a construction site, wherein the display, the camera, the alarm and the illuminating lamp are connected and communicated with the main controller. The construction site is also provided with an audio transmission device connected and communicated with the main controller, the audio transmission device is connected and communicated with a wireless interphone, and a microphone communicated with the main controller is arranged near the main controller. The construction condition of the construction site is observed at any time through the camera and the display, voice informing is carried out through a speaker, if dangerous conditions occur, the alarming is carried out through the alarm, so that crowds are immediately evacuated, and the personal safety of the construction personnel is ensured. In addition, a worker in the monitoring room can be communicated with the site construction personnel holding the wireless interphone by hands through the audio transmission device, so that the convenience is brought for the communication and the construction is smoothly carried out.

Description

The management monitoring system of engineering site construction state
Technical field:
The utility model belongs to the project management technique field, is specifically related to a kind of management monitoring system of engineering site construction state.
Background technology:
The engineering site construction environment is complicated; Personnel are noisy; The supervisor of construction is difficult in time, understands on-the-spot construction situation and progress all sidedly, and also inconvenience is in time notified the field personnel when thing, if dangerous situation can't in time be warned the field personnel when taking place; Can't in time take measures to control field conditions, staff's personal safety is effectively ensured.And when working-yard light is dark, light source can't be provided in time.
Summary of the invention:
The purpose of the utility model is to provide a kind of management monitoring system of the engineering site construction state that can monitor in real time the working-yard situation.
The purpose of the utility model realizes in the following manner: the management monitoring system of this project site operation state; It is characterized in that: comprise the camera, alarm, loudspeaker, the lighting that are installed in master controller, the display in the Control Room and are installed in the working-yard, said display, camera, alarm, loudspeaker and lighting all are connected communication with master controller.
The working-yard also is provided with the audio transmission device that is connected communication with master controller; Audio transmission device is connected communication with wireless interspeaker; Master controller is other also to be provided with coupled logical microphone, and the staff in site operation personnel and the Control Room can be linked up at any time.
The beneficial effect of the utility model is: the management monitoring system of this project site operation state; Can observe the construction situation of keeping watch on the working-yard at any time through camera and display; Also can carry out verbal announcement through loudspeaker; If dangerous situation takes place to pass through alarm equipment alarm,, guarantee workmen's personal safety so that in time evacuate the crowd.Staff in the Control Room communication that can engage in the dialogue through the site operation personnel of audio transmission device and hand-hold wireless intercom in addition; Convenient interchange each other; To guarantee normally carrying out of construction operation, make things convenient for the supervisor of construction to understand on-the-spot construction situation at any time, realize visualized management.
Description of drawings:
Fig. 1 is the structured flowchart of the utility model.
Embodiment:
With reference to Fig. 1; The management monitoring system of this project site operation state; It is characterized in that: comprise the camera, alarm, the lighting that are installed in master controller, the display in the Control Room and are installed in the working-yard, said display, camera, alarm and lighting all are connected communication with master controller.The working-yard also is provided with the audio transmission device that is connected communication with master controller, and audio transmission device is connected communication with wireless interspeaker, and the master controller side also is provided with coupled logical microphone.At any time observe the construction situation of keeping watch on the working-yard through camera and display, also can carry out verbal announcement,,, guarantee workmen's personal safety so that in time evacuate the crowd if dangerous situation takes place to pass through alarm equipment alarm through loudspeaker.Staff in the Control Room communication that can engage in the dialogue through the site operation personnel of audio transmission device and hand-hold wireless intercom in addition makes things convenient for interchange each other, to guarantee normally carrying out of construction operation.This embodiment is simple and efficient to handle, safe and reliable, practical.

Claims (2)

1. the management monitoring system of engineering site construction state; It is characterized in that: comprise the camera, alarm, loudspeaker, the lighting that are installed in master controller, the display in the Control Room and are installed in the working-yard, said display, camera, alarm, loudspeaker and lighting all are connected communication with master controller.
2. the management monitoring system of engineering site construction state as claimed in claim 1 is characterized in that:
The working-yard also is provided with the audio transmission device that is connected communication with master controller, and audio transmission device is connected communication with wireless interspeaker, and the master controller side also is provided with coupled logical microphone.
CN2012202124467U 2012-05-14 2012-05-14 Management and monitor system of engineering site operation state Expired - Fee Related CN202522896U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012202124467U CN202522896U (en) 2012-05-14 2012-05-14 Management and monitor system of engineering site operation state

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012202124467U CN202522896U (en) 2012-05-14 2012-05-14 Management and monitor system of engineering site operation state

Publications (1)

Publication Number Publication Date
CN202522896U true CN202522896U (en) 2012-11-07

Family

ID=47105838

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012202124467U Expired - Fee Related CN202522896U (en) 2012-05-14 2012-05-14 Management and monitor system of engineering site operation state

Country Status (1)

Country Link
CN (1) CN202522896U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105874519A (en) * 2014-12-10 2016-08-17 郑勇镐 Real-time alarm system for managing onsite safety and method for operating same
CN106886190A (en) * 2017-04-27 2017-06-23 四川云图瑞科技有限公司 A kind of site operation device for being applied to shield-tunneling construction in subway and Tunnel Engineering
CN107255981A (en) * 2017-06-14 2017-10-17 成都智建新业建筑设计咨询有限公司 A kind of super high rise building transport of materials management system based on BIM
CN113970351A (en) * 2021-09-02 2022-01-25 长沙云软信息技术有限公司 High slope construction safety monitoring system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105874519A (en) * 2014-12-10 2016-08-17 郑勇镐 Real-time alarm system for managing onsite safety and method for operating same
CN106886190A (en) * 2017-04-27 2017-06-23 四川云图瑞科技有限公司 A kind of site operation device for being applied to shield-tunneling construction in subway and Tunnel Engineering
CN107255981A (en) * 2017-06-14 2017-10-17 成都智建新业建筑设计咨询有限公司 A kind of super high rise building transport of materials management system based on BIM
CN113970351A (en) * 2021-09-02 2022-01-25 长沙云软信息技术有限公司 High slope construction safety monitoring system

Similar Documents

Publication Publication Date Title
CN202522896U (en) Management and monitor system of engineering site operation state
WO2012003429A8 (en) Indicator arrangement, regulator release button, and breathing apparatus
GB201210061D0 (en) Crane and related method of operation
CN203054521U (en) Online monitoring system
CN104071670A (en) Lift well fire extinguishing plant
CN103230119A (en) Multifunctional safety helmet and method for achieving visual intercom by using same
CN203492853U (en) Multifunctional wireless visual talkback safety helmet based on wifi technology
CN203954492U (en) A kind of alarm type safety hook
CN106228764A (en) There is the Intelligent warning board of mobile distant place alarm
CN206757370U (en) A kind of construction project time management device based on engineering safety guarantee
CN202331719U (en) Portable safety self protector
CN202637755U (en) Life escaper for high building
CN202096615U (en) Novel fire-resisting lifesaving rope
CN202745943U (en) Mine emergency rescue command device
CN203090316U (en) Fire extinguisher
CN204143490U (en) Mountain forest scenic spot fire prevention rescue monitoring comprehensive intelligent platform
CN203760861U (en) Direct-current screen capable of alarming
CN205609207U (en) Crowd's ring device and system
CN201925879U (en) Tracking emergency calling special light with GPRS (general packet radio service)
CN203154686U (en) Firefighting box
CN202425680U (en) Mining safety helmet
CN202360032U (en) Mine refuge monitoring and communication system
CN201654959U (en) Signal-emitting device for flood-prevention inspection
CN202223452U (en) Wheelchair with lighting function
CN210143914U (en) Intelligent wearable device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121107

Termination date: 20130514