CN202519666U CN2012201893522U CN201220189352U CN202519666U CN 202519666 U CN202519666 U CN 202519666U CN 2012201893522 U CN2012201893522 U CN 2012201893522U CN 201220189352 U CN201220189352 U CN 201220189352U CN 202519666 U CN202519666 U CN 202519666U
Authority
CN
China
Prior art keywords
pile
stake
injection
grouting
toe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN2012201893522U
Other languages
Chinese (zh)
Inventor
李来宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINGTAI ROAD AND BRIDGE CONSTRUCTION GENERAL CO
Original Assignee
XINGTAI ROAD AND BRIDGE CONSTRUCTION GENERAL CO
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINGTAI ROAD AND BRIDGE CONSTRUCTION GENERAL CO filed Critical XINGTAI ROAD AND BRIDGE CONSTRUCTION GENERAL CO
Priority to CN2012201893522U priority Critical patent/CN202519666U/en
Application granted granted Critical
Publication of CN202519666U publication Critical patent/CN202519666U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a pile toe assembly for construction of an injection-compression molding an earth-rock composite pile. The structure comprises a pile disk with an grouting hole, and a pile toe arranged under the pile disk, and the key points lie in that the pile toe is a hollow conical structure formed by enclosing a group of pile toe flaps; each pile toe flap is respectively hinged with the pile disk by means of a pivot shaft; the hollow conical structure is internally provided therein with a capsule communicated with the grouting hole; and the capsule is fixed by a connecting piece arranged on the pile disk. By the scheme disclosed by the utility model, the pile disk of the pile toe is provided with the grouting hole and a reinforcing rib assembly; the grouting hole is provided with threads; an grouting tube and the grouting hole are in threaded connection, so as to ensure that the grouting tube is steady and does not float upwards when cement concrete is injection-compressed into the grouting tube, thus ensuring the pile quality. In grouting, as a positioning disk of the pile toe is provided with the reinforcing rib assembly, cement forms one piece with the reinforcing rib after solidification; and as the pile disk is provided with the highly-elastic capsule fixed by the positioning disk, with the increasing of grouting pressure and the injection of paste, the closed pile flaps are pushed to be opened, so that the pile flaps 'bloom', and an enlarged pile base is firstly formed at the pile base, and thus the pile toe is firmly fixed into an earth foundation.

Description

The sharp assembly of a kind of working stake of injection-compression molding soil stone composite pile
Technical field
The utility model belongs to injection moulding soil stone composite pile construction field; Relate to the pile crown of using in the work progress; Specifically injection moulding soil stone composite pile is pressed when annotating concrete, is the sharp assembly of a kind of working stake of injection-compression molding soil stone composite pile of avoiding a steel pipe come-up difficult problem to design.
Background technology
In the construction of injection-compression molding soil stone composite pile, pressing steel pipe come-up when pressing the cementing concrete in the pipe, the dependence top workpiece of exerting pressure huge to annotating, difficult installation, efficiency of construction is low.
Summary of the invention
The utility model has designed the sharp assembly of a kind of working stake of injection-compression molding soil stone composite pile in order to solve in the composite pile work progress Grouting Pipe come-up difficult problem, and body is firmly non-rising when having guaranteed that construction is pressed the cementing concrete in Grouting Pipe, thereby guarantees pile quality.
The technical scheme that the utility model adopts is: the sharp assembly of a kind of working stake of injection-compression molding soil stone composite pile; Comprise the stake dish that has injected hole in the structure and be arranged on the stake point that the below is coiled in stake; Key is: described stake point is to crowd around the conical hollow structure that become by one group of stake cusp; Each cusp is hinged with the stake dish by hinge respectively, and the conical hollow inside configuration is provided with the capsule that is communicated with injected hole, and capsule is fixed by the connector that is arranged on the stake dish.
The beneficial effect of the utility model is: this programme adopts all steel stake point assembly, is provided with injected hole and reinforcing rib assembly on the stake dish in stake point assembly.The injected hole place is provided with screw thread, and Grouting Pipe is threaded with injected hole, and Grouting Pipe is firmly non-rising when having guaranteed in Grouting Pipe, to press the cementing concrete, thereby guarantees pile quality.During slip casting, at first be cement concrete to be injected in the stake point, the reinforcing rib assembly arranged below the stake dish of stake point through small-sized Grouting Pipe; Be consolidated into one with reinforcing rib after the cement solidification, the stake dish is provided with by the fixing high resiliency capsule of positioning disk, along with grouting pressure increases and the slurry injection; Push the stake cusp that closes up open; A cusp " is bloomed ", at the bottom of stake, at first form one and enlarge the stake end, firm being fixed in the soil matrix of stake point.The sharp assembly of stake is pressed the integral body of pipe for welding together with notes, thereby solves when pressing pipe to press the cementing concrete to notes, annotates pressure pipe come-up problem.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Fig. 2 is the structural representation of the utility model king-pile dish.
Fig. 3 is the structural representation of the utility model king-pile cusp.
In the accompanying drawing, 1-1 is an injected hole, the 1st, and the stake dish, the 2nd, the stake point, 2-1 is a cusp, 2-2 is a boss, the 3rd, capsule, the 4th, reinforcing rib, the 5th, annotate and press pipe, the 6th, positioning disk, 7 Grouting Pipe, the 8th, hinge.
Below in conjunction with accompanying drawing the utility model is elaborated.
The specific embodiment
The sharp assembly of a kind of working stake of injection-compression molding soil stone composite pile; Comprise the stake dish 1 that has injected hole 1-1 in the structure and be arranged on the stake point 2 that 1 below is coiled in stake; Importantly: described stake point 2 is to crowd around the conical hollow structure that become by one group of stake cusp 2-1; Each cusp 2-1 is hinged with stake dish 1 by hinge 8 respectively, and the conical hollow inside configuration is provided with the capsule 3 that is communicated with injected hole 1-1, and capsule 3 is fixed by the connector that is arranged on the stake dish 1.In work progress, along with grouting pressure increases and the slurry injection, high resiliency capsule 3 enlarges, and to push the stake cusp that closes up open, a cusp " is bloomed ", at the bottom of stake, at first forms one and enlarges the stake end, firm being fixed in the cement concrete of point.
For fixing capsule 3 better, to avoid capsule 3 landings in the slip casting process, in the present technique scheme, comprise a circular orientation dish 6 that is fixed on stake dish 1 lower surface in the structure of described connector, capsule 3 is sleeved on the positioning disk 6 and by clip and fixes.
Described stake dish 1 lower surface also is provided with one group of reinforcing rib 4 assembly.Reinforcing rib 4 is cemented in the cement concrete, makes the stake end and pile foundation behind the pile firmer.
Described stake dish 1 is provided with one group of groove, and a cusp 2-1 is provided with boss 2-2, and boss 2-2 pegs graft with the groove on the stake dish 1 by hinge 8 and locatees.
The quantity of described stake cusp 2-1 is no less than 3.
The upper surface of described boss 2-2 is a lozenges.Consider that according to mechanical characteristic boss 2-2 adopts lozenges, in the process of piling, the sharp assembly of stake is difficult for scattering, so that the grouting operation of postorder.
In the specific implementation; Choose the stake dish 1 that meets diameter according to annotating pressure pipe 5 diameters; Make the injected hole 1-1 that matches with Grouting Pipe 7 in central authorities; Coil 1 lower surface in stake and weld annular positioning disk 6, on stake dish 1, weld reinforcing rib 4 assemblies afterwards, capsule 3 is sleeved on the positioning disk 6 and by clip fixes.Insert Grouting Pipe in the injected hole 1-1 again and by being threaded.If notes are pressed pipe 5 external diameter 19cm, choose the stake dish 1 of diameter 20cm, thickness of slab 1.5cm is at the injected hole 1-1 of middle position brill Φ 49mm, threading, round steel T-shaped reinforcing rib 4 assemblies of five Φ 12 of welding.Weld high 30mm, Φ 150mm twines the positioning disk 6 of solid capsule 3 usefulness, and capsule 3 is sleeved on the positioning disk 6, makes capsule 3 be communicated with injected hole 1-1, fix by clip afterwards.During construction, press stake dish 1 pipe 5 to be pressed into soil matrix with annotating, be pressed into cement concrete to small-sized Grouting Pipe 7, after mud jacking was accomplished, left-hand thread withdrawed from small-sized Grouting Pipe 7, after waiting to solidify, pressed pipe 5 cementing concretes to annotating.

Claims (6)

1. the sharp assembly of the working stake of injection-compression molding soil stone composite pile; Comprise the stake dish (1) that has injected hole (1-1) in the structure and be arranged on the stake point (2) that (1) below is coiled in stake; It is characterized in that: described stake point (2) is to crowd around the conical hollow structure that become by one group of stake cusp (2-1); Each cusp (2-1) is hinged with stake dish (1) by hinge (8) respectively; The conical hollow inside configuration is provided with the capsule (3) that is communicated with injected hole (1-1), and capsule (3) is fixed by the connector that is arranged on the stake dish (1).
2. the sharp assembly of a kind of working stake of injection-compression molding soil stone composite pile according to claim 1; It is characterized in that: comprise the circular orientation dish (6) that is fixed on stake dish (1) lower surface in the structure of described connector, capsule (3) is sleeved on positioning disk (6) and goes up and fix by clip.
3. the sharp assembly of a kind of working stake of injection-compression molding soil stone composite pile according to claim 2, it is characterized in that: described stake dish (1) lower surface also is provided with one group of reinforcing rib (4) assembly.
4. the sharp assembly of a kind of working stake of injection-compression molding soil stone composite pile according to claim 1; It is characterized in that: described stake dish (1) is provided with one group of groove; Stake cusp (2-1) is provided with boss (2-2), and boss (2-2) coils the groove grafting location on (1) by hinge (8) and stake.
5. the sharp assembly of a kind of working stake of injection-compression molding soil stone composite pile according to claim 1, it is characterized in that: the quantity of described stake cusp (2-1) is no less than 3.
6. the sharp assembly of a kind of working stake of injection-compression molding soil stone composite pile according to claim 4, it is characterized in that: the upper surface of described boss (2-2) is a lozenges.
CN2012201893522U 2012-04-28 2012-04-28 Pile toe assembly for construction of injection-compression molding earth-rock composite pile Withdrawn - After Issue CN202519666U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201893522U CN202519666U (en) 2012-04-28 2012-04-28 Pile toe assembly for construction of injection-compression molding earth-rock composite pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201893522U CN202519666U (en) 2012-04-28 2012-04-28 Pile toe assembly for construction of injection-compression molding earth-rock composite pile

Publications (1)

Publication Number Publication Date
CN202519666U true CN202519666U (en) 2012-11-07

Family

ID=47102621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201893522U Withdrawn - After Issue CN202519666U (en) 2012-04-28 2012-04-28 Pile toe assembly for construction of injection-compression molding earth-rock composite pile

Country Status (1)

Country Link
CN (1) CN202519666U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102677668A (en) * 2012-04-28 2012-09-19 邢台路桥建设总公司 Pile tip assembly for injection-molded soil and stone composite pile construction
CN113513040A (en) * 2021-07-30 2021-10-19 中国华能集团清洁能源技术研究院有限公司 Single-pile foundation for offshore wind power and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102677668A (en) * 2012-04-28 2012-09-19 邢台路桥建设总公司 Pile tip assembly for injection-molded soil and stone composite pile construction
CN102677668B (en) * 2012-04-28 2014-05-21 邢台路桥建设总公司 Pile tip assembly for injection-molded soil and stone composite pile construction
CN113513040A (en) * 2021-07-30 2021-10-19 中国华能集团清洁能源技术研究院有限公司 Single-pile foundation for offshore wind power and construction method thereof

Similar Documents

Publication Publication Date Title
CN204163287U (en) Roll forming bar connecting grout sleeve
CN202881945U (en) Grouting anchor-bolt-end type multistage stop-grouting plug
CN102677668A (en) Pile tip assembly for injection-molded soil and stone composite pile construction
CN202519666U (en) Pile toe assembly for construction of injection-compression molding earth-rock composite pile
CN201598633U (en) Drilling cast-in-place pile
CN104196023A (en) Precast concrete tubular pile tip with mechanical connection device and using method of precast concrete tubular pile tip
CN203546917U (en) Cushioning, energy dissipation and anti-seismic building connecting structure
CN203430543U (en) Expansion anchor rod
CN202731299U (en) Novel reserved sleeve device of cast-in-place floor plate
CN204225105U (en) The antitorque rotating earth anchor of anti-oblique pull with platen
CN202124857U (en) Splitting pile
CN203741837U (en) Ground anchor
CN102953742A (en) End-type multi-stage grout stopping plug of grouting anchor rod and use method thereof
CN203498853U (en) Rock bolt foundation for power transmission tower
CN201943071U (en) Implantable steel tube anchor rod with stabs
CN205816629U (en) Bending device for rebars
CN201074406Y (en) Vertical prestress opening mudjack construction equipment
CN205224020U (en) Stock static pressure resistance to plucking steel -pipe pile for slip casting
CN205399422U (en) Construct recoverable stock
CN204510214U (en) A kind of roofbolt construction arrangement of construction work
CN205172452U (en) A drilling rod is taken off in antiskid that is used for change of non - excavation of old pipeline to be under construction
CN203808058U (en) Highway subgrade gravel pile
CN218093097U (en) Anchor rod for civil engineering construction
CN204754956U (en) Tubulose stores up and glues ware for stock
CN203625915U (en) Embedded creeping formwork structure in caisson prefabrication construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20121107