CN202502246U - Testing device - Google Patents

Testing device Download PDF

Info

Publication number
CN202502246U
CN202502246U CN 201220091577 CN201220091577U CN202502246U CN 202502246 U CN202502246 U CN 202502246U CN 201220091577 CN201220091577 CN 201220091577 CN 201220091577 U CN201220091577 U CN 201220091577U CN 202502246 U CN202502246 U CN 202502246U
Authority
CN
China
Prior art keywords
transverse tube
proving installation
installation
electric energy
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220091577
Other languages
Chinese (zh)
Inventor
彭益媛
高翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN TECHRISE ELECTRONICS CO Ltd
Original Assignee
SHENZHEN TECHRISE ELECTRONICS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN TECHRISE ELECTRONICS CO Ltd filed Critical SHENZHEN TECHRISE ELECTRONICS CO Ltd
Priority to CN 201220091577 priority Critical patent/CN202502246U/en
Application granted granted Critical
Publication of CN202502246U publication Critical patent/CN202502246U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The utility model relates to a testing device, which comprises a base and a mounting framework, wherein the base comprises a frame body and a guide post connected with the frame body. The mounting framework comprises at least one first transverse tube and at least one second transverse tube which are arranged in parallel; a plurality of insulated terminals are arranged on at least one first transverse tube; a plurality of hooks are arranged on at least one second transverse tube; a plurality of electric energy meters are arranged between at least one first transverse tube and at least one second transverse tube; and each electric energy meter is connected with an insulated terminal and a hook. A plurality of electric energy meters can be simultaneously and conveniently arranged on the mounting framework of the testing device and are used for simulating read meters in a field cell during testing, so that the testing efficiency can be effectively improved.

Description

Proving installation
Technical field
The utility model relates to a kind of proving installation, relates in particular to a kind of micropower wireless test device of checking meter the sub-district that is used to simulate.
Background technology
In the prior art, adopt manual type when the power consumption of sub-district is checked meter usually, i.e. manual work is carried out reading to the ammeter of every family one by one.Yet, adopt the manual type meter reading efficiency very low.The mode that present industry attempts to adopt robotization to check meter solves this problem, and to improve meter reading efficiency, one of scheme is to install micro power radio module additional at each ammeter, and the reading of ammeter sends through micro power radio module.
For the scheme that makes has preferable implementation result, need test the above-mentioned ammeter that each adds micro power radio module, yet; At this stage; Need carry out large-scale MANET during test, promptly connect a large amount of electric energy meters and unify test, provide such test environment very difficult; Single installation with regard to electric energy meter, dismounting just brings many challenges to test job.
The utility model content
In view of this, provide a kind of convenient proving installation of installing real in necessary, said proving installation can effectively improve testing efficiency.
A kind of proving installation, it is used for supplying the test module that a plurality of electric energy meters are tested, and this proving installation comprises:
A base, this base comprise a framework and connect a guide pillar of this framework that said test module is arranged on this guide pillar;
An installation frame that connects this framework; This installation frame comprises at least one first transverse tube and at least one second transverse tube that laterally arranges; On this at least one first transverse tube a plurality of insulated terminals are set; On this at least one second transverse tube a plurality of hooks are set, these a plurality of electric energy meters are arranged between this at least one first transverse tube and this at least one second transverse tube, and each electric energy meter is connected with an insulated terminal and a hook respectively.
With respect to prior art, can make things convenient for simultaneously on the installation frame of said proving installation a plurality of electric energy meters are installed, be used for the simulated field sub-district in the test to check meter, can effectively improve testing efficiency.
Description of drawings
Fig. 1 is the schematic perspective view of the proving installation that provides of the utility model embodiment.
Fig. 2 is the vertical view of proving installation shown in Figure 1.
Fig. 3 is the front view of proving installation shown in Figure 1.
Fig. 4 is the left view of proving installation shown in Figure 1.
Fig. 5 is the front elevation that proving installation shown in Figure 3 is equipped with electric energy meter.
Fig. 6 is the right view that proving installation shown in Figure 5 is equipped with electric energy meter.
Fig. 7 is the synoptic diagram of the installation deck of electric energy meter shown in Figure 5.
Fig. 8 is the synoptic diagram of the power switch of electric energy meter shown in Figure 5.
Embodiment
To combine accompanying drawing that the utility model embodiment is done further detailed description below.
See also Fig. 1, the utility model embodiment provides a kind of proving installation 100, and it is used for supplying test 200 pairs of a plurality of electric energy meters 20 of module (asking for an interview Fig. 5) to test.This proving installation 100 comprises a base 10 and an installation frame 30.
Please consult Fig. 2 together, this base 10 comprises a framework 12 and a guide pillar 14.In the present embodiment, this framework 12 is a cubic frame, and between wherein two frames that this guide pillar 14 is connected that framework 12 is parallel to each other, wherein as shown in Figure 2, said test module 200 is arranged on this guide pillar 14.
Please further consult Fig. 3, this installation frame 30 comprises a cubic frame 35, two first transverse tubes 31 and two second transverse tubes 32, arranges between wherein two frames that this first, second transverse tube 32 is connected that this four directions frame 35 is parallel to each other and space.Particularly, this first, second transverse tube 32 is arranged in parallel, and one of them second transverse tube 32 is arranged between two first transverse tubes 31, and these two first transverse tubes 31 wherein one between these two second transverse tubes 32.In addition, a plurality of insulated terminals 310 are set on this first transverse tube 31, a plurality of hooks 320 are set on this second transverse tube 32.In the present embodiment, five insulated terminals 310 are set on every first transverse tube 31, five hooks 320 are set on every second transverse tube 32.In addition, in the present embodiment, this first, second transverse tube 31 is respectively a hollow steel tube.
As shown in Figure 4; Described installation frame 30 vertical these bases 10 of the utility model are provided with, and are connected with this base 10, further; This proving installation 100 also comprises two pillars 50; This two pillars 50 respectively relatively these installation frames 30 and this base 10 tilt, and be connected between this installation frame 30 and this base 10, thereby the formation side that combines with this installation frame 30 and this base 10 is the structure of A-frame.These two pillars 50 are used to support this installation frame 30, to improve the stability of whole testing device 100.
Like Fig. 5 and shown in Figure 6, during use, these a plurality of electric energy meters 20 are provided with between this first transverse tube 31 and this second transverse tube 32, and each electric energy meter 20 is connected with an insulated terminal 310 and a hook 320 respectively.The described electric energy meter of present embodiment 20 is concrete, and it is a single-phase electric energy meter like Fig. 7 and shown in Figure 8, and comprises an installation deck 21 and a power switch 22 respectively.And this hook 320 makes and is screwed on this installation frame 30, and its effect is when electric energy meter 20 is installed, to be used for blocking the hook on the electric energy meter 20, makes its installation more firm, prevents to pitch.
This test module 200 is a micropower wireless test module, and it can directly connect the 220V civil power, and controls the break-make of all electric energy meter 20 power supplys via a total power switch.In the present embodiment, in the laid inside of first, second transverse tube 31,32 live wire and zero line, the live wire and the zero line of each electric energy meter 20 are cascaded respectively, so with first, second transverse tube 31,32 in are connected corresponding of live wire of laying with zero line.
Can make things convenient for simultaneously on the installation frame 30 of said proving installation 100 a plurality of electric energy meters 20 are installed, be used for the simulated field sub-district in the test to check meter, can effectively improve testing efficiency.In addition, said proving installation 100 also has the following advantages: insulativity is good, can prevent to get an electric shock; Whole testing device 100 stable preferable can prevent maloperation, thus the stable testing property of corresponding enhancing proving installation 100.
It is understandable that; For the person of ordinary skill of the art; Can make the change and the distortion of other various correspondences according to the technical conceive of the utility model, for example, the number of first, second transverse tube 31,32 of corresponding increase; Test with the more electric energy meters 20 of corresponding installation, and all these change the protection domain that all should belong to the utility model claim with distortion.

Claims (10)

1. proving installation, it is used for supplying the test module that a plurality of electric energy meters are tested, and this proving installation comprises:
A base, this base comprise a framework and connect a guide pillar of this framework that said test module is arranged on this guide pillar;
An installation frame that connects this framework; This installation frame comprises at least one first transverse tube and at least one second transverse tube that laterally arranges; On this at least one first transverse tube a plurality of insulated terminals are set; On this at least one second transverse tube a plurality of hooks are set, these a plurality of electric energy meters are arranged between this at least one first transverse tube and this at least one second transverse tube, and each electric energy meter is connected with an insulated terminal and a hook respectively.
2. proving installation as claimed in claim 1 is characterized in that, this framework is a cubic frame, and this guide pillar is connected between wherein two frames that are parallel to each other of framework.
3. proving installation as claimed in claim 1; It is characterized in that; This installation frame comprises a cubic frame, two first transverse tubes and two second transverse tubes, and this first, second transverse tube is connected between wherein two frames that are parallel to each other of this four directions frame, and arranges in the space.
4. proving installation as claimed in claim 3 is characterized in that, this first, second transverse tube is respectively a hollow steel tube.
5. proving installation as claimed in claim 4; It is characterized in that; The interior live wire and the zero line laid of this first, second transverse tube, the live wire and the zero line of each electric energy meter are cascaded respectively, and then with first, second transverse tube in be connected corresponding of live wire of laying with zero line.
6. proving installation as claimed in claim 1 is characterized in that, vertical this base of this installation frame is provided with.
7. proving installation as claimed in claim 6 is characterized in that, this proving installation also comprises two pillars, and this installation frame and this base tilt and be connected between this installation frame and this base these two pillars relatively respectively.
8. proving installation as claimed in claim 1 is characterized in that, this hook makes and is screwed on this installation frame.
9. proving installation as claimed in claim 1 is characterized in that, this test module is a micropower wireless test module.
10. proving installation as claimed in claim 9 is characterized in that, this test module connects 220 volts of civil powers.
CN 201220091577 2012-03-13 2012-03-13 Testing device Expired - Fee Related CN202502246U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220091577 CN202502246U (en) 2012-03-13 2012-03-13 Testing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220091577 CN202502246U (en) 2012-03-13 2012-03-13 Testing device

Publications (1)

Publication Number Publication Date
CN202502246U true CN202502246U (en) 2012-10-24

Family

ID=47038856

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220091577 Expired - Fee Related CN202502246U (en) 2012-03-13 2012-03-13 Testing device

Country Status (1)

Country Link
CN (1) CN202502246U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103698560A (en) * 2013-12-31 2014-04-02 深圳市思达仪表有限公司 High-frequency electromagnetic field anti-interference testing tool
WO2018072055A1 (en) * 2016-10-18 2018-04-26 深圳市思达仪表有限公司 High frequency electromagnetic field anti-interference testing tool

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103698560A (en) * 2013-12-31 2014-04-02 深圳市思达仪表有限公司 High-frequency electromagnetic field anti-interference testing tool
WO2018072055A1 (en) * 2016-10-18 2018-04-26 深圳市思达仪表有限公司 High frequency electromagnetic field anti-interference testing tool

Similar Documents

Publication Publication Date Title
CN202502246U (en) Testing device
CN204694835U (en) Connection box of electric energy meter emulation cabinet wiring portable testing system
CN207181641U (en) A kind of forming and capacity dividing cabinet for quadrate lithium battery test
CN203301114U (en) 110kV lightning arrester universal mounting base
CN204241294U (en) One can location model chamber
CN106771631A (en) A kind of down conductor conducting resistance test device
CN203350131U (en) Load test device
CN205861832U (en) A kind of Wire bundle testing apparatus with tally function
CN104237715A (en) Test running fixture of fan coil
CN205192465U (en) Verifying attachment that accumulator plate cast joint utmost point ear was surely brushed
CN103698560A (en) High-frequency electromagnetic field anti-interference testing tool
CN209328332U (en) A kind of distribution experiment operation platform device
CN105093011B (en) A kind of electric vehicle alternating current-direct current charging pile calibrating conversion equipment
CN202267708U (en) Device for testing power of solar-cell panel
CN209167509U (en) A kind of battery mass test device
CN202934478U (en) Positioning support base
CN203573045U (en) Fracture structure fractal statistic device
CN201826256U (en) Adjustable detector for cables
CN205908093U (en) Electronic information engineering is with communication tower
CN202831676U (en) Temporary inflatable exhibition room
CN202133414U (en) Electronic and electric appliance integration test rack
CN203480004U (en) Power supply test fixture system
CN205847172U (en) Solar module
CN204555950U (en) A kind of device checking and accepting bracing wire angle over the ground
CN205992887U (en) A kind of Portable flexible assembly IV test position fix frock

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121024

Termination date: 20160313