CN202502203U - 一种杆塔与绝缘子串覆冰桥接闪络模拟实验装置 - Google Patents

一种杆塔与绝缘子串覆冰桥接闪络模拟实验装置 Download PDF

Info

Publication number
CN202502203U
CN202502203U CN201220116137XU CN201220116137U CN202502203U CN 202502203 U CN202502203 U CN 202502203U CN 201220116137X U CN201220116137X U CN 201220116137XU CN 201220116137 U CN201220116137 U CN 201220116137U CN 202502203 U CN202502203 U CN 202502203U
Authority
CN
China
Prior art keywords
insulator
bridge joint
ground wire
flashover
insulator chain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201220116137XU
Other languages
English (en)
Inventor
肖嵘
郑旭
傅晨钊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Electric Power Co
East China Power Test and Research Institute Co Ltd
Original Assignee
Shanghai Municipal Electric Power Co
East China Power Test and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Electric Power Co, East China Power Test and Research Institute Co Ltd filed Critical Shanghai Municipal Electric Power Co
Priority to CN201220116137XU priority Critical patent/CN202502203U/zh
Application granted granted Critical
Publication of CN202502203U publication Critical patent/CN202502203U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

本实用新型涉及一种杆塔与绝缘子串覆冰桥接闪络模拟实验装置,包括依次串联的顶端绝缘子,多个中间绝缘子和底端绝缘子,所述的顶端绝缘子通过覆冰与其下方的多个中间绝缘子和底端绝缘子串联桥接,并形成冰棱,所述的顶端绝缘子设有地线a,该地线a与冰棱桥接。与现有技术相比,本实用新型具有结构简单、使用方便等优点。

Description

一种杆塔与绝缘子串覆冰桥接闪络模拟实验装置
技术领域
本实用新型涉及一种模拟实验装置,尤其是涉及一种杆塔与绝缘子串覆冰桥接闪络模拟实验装置。
背景技术
绝缘子串覆冰闪络是严重危害电力系统安全运行的事故之一,由其引发的事故将严重危害电网的安全运行。在我国以及美国、加拿大等许多国家和地区,每年都会发生因覆冰引起的输电线路跳闸故障,其中相当多数是因绝缘子串覆冰闪络而引起的,造成了巨大的经济损失,因此对绝缘子串覆冰桥接闪络进行模拟实验对提高绝缘子闪络性能具有十分重要的意义。
目前已有一些对绝缘子防冰闪措施的研究,如实用新型专利申请200820029450.3公开了一种110kV防冰闪复合绝缘子串,包括一个其上串接有19~25片直径60~140mm的绝缘子伞的110kV合成绝缘子串,其特征是在绝缘子串杆体上加装有至少一个直径大于绝缘子伞的大伞,但这些研究并没有对绝缘子串覆冰桥接闪络进行模拟实验装置进行说明。
发明内容
本实用新型的目的就是为了克服上述现有技术存在的缺陷而提供一种结构简单、使用方便的杆塔与绝缘子串覆冰桥接闪络模拟实验装置。
本实用新型的目的可以通过以下技术方案来实现:
一种杆塔与绝缘子串覆冰桥接闪络模拟实验装置,其特征在于,包括依次串联的顶端绝缘子,多个中间绝缘子和底端绝缘子,所述的顶端绝缘子通过覆冰与其下方的多个中间绝缘子和底端绝缘子串联桥接,并形成冰棱,所述的顶端绝缘子设有地线a,该地线a与冰棱桥接。
所述的顶部绝缘子等效为杆塔。
所述的底端绝缘子设有地线b,该地线b与与冰棱桥接。
所述的中间绝缘子设有1-5个。
与现有技术相比,本实用新型能对不同种类、不同材料的绝缘子进行闪络测试,具有结构简单、使用方便等优点。
附图说明
图1为本实用新型的结构示意图。
图中:1为顶端绝缘子,2为中间绝缘子,3为底端绝缘子,4为冰棱,5为地线a,6为地线b。
具体实施方式
下面结合附图和具体实施例对本实用新型进行详细说明。
实施例
如图1所示,一种杆塔与绝缘子串覆冰桥接闪络模拟实验装置包括依次串联的顶端绝缘子1,多个中间绝缘子2和底端绝缘子3。顶端绝缘子1等效为杆塔,通过覆冰与其下方的多个中间绝缘子2和底端绝缘子3串联桥接,并形成冰棱4,顶端绝缘子1设有地线a5,底端绝缘子3设有地线b6,该地线a5和地线b6均与与冰棱4桥接,而中间绝缘子2设有2个。
本实用新型的原理如下:当绝缘子串上方有地线通过,且地线与绝缘子串之间形成的冰凌桥接时,绝缘闪络的路径将不再经过绝缘子上表面,而直接通过冰凌与地线发生闪络,此时可测出绝缘子的闪络电压。

Claims (4)

1.一种杆塔与绝缘子串覆冰桥接闪络模拟实验装置,其特征在于,包括依次串联的顶端绝缘子,多个中间绝缘子和底端绝缘子,所述的顶端绝缘子通过覆冰与其下方的多个中间绝缘子和底端绝缘子串联桥接,并形成冰棱,所述的顶端绝缘子设有地线a,该地线a与冰棱桥接。
2.根据权利要求1所述的一种杆塔与绝缘子串覆冰桥接闪络模拟实验装置,其特征在于,所述的顶部绝缘子等效为杆塔。
3.根据权利要求1所述的一种杆塔与绝缘子串覆冰桥接闪络模拟实验装置,其特征在于,所述的底端绝缘子设有地线b,该地线b与与冰棱桥接。
4.根据权利要求1所述的一种杆塔与绝缘子串覆冰桥接闪络模拟实验装置,其特征在于,所述的中间绝缘子设有1-5个。
CN201220116137XU 2012-03-23 2012-03-23 一种杆塔与绝缘子串覆冰桥接闪络模拟实验装置 Expired - Lifetime CN202502203U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201220116137XU CN202502203U (zh) 2012-03-23 2012-03-23 一种杆塔与绝缘子串覆冰桥接闪络模拟实验装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201220116137XU CN202502203U (zh) 2012-03-23 2012-03-23 一种杆塔与绝缘子串覆冰桥接闪络模拟实验装置

Publications (1)

Publication Number Publication Date
CN202502203U true CN202502203U (zh) 2012-10-24

Family

ID=47038813

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201220116137XU Expired - Lifetime CN202502203U (zh) 2012-03-23 2012-03-23 一种杆塔与绝缘子串覆冰桥接闪络模拟实验装置

Country Status (1)

Country Link
CN (1) CN202502203U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104198897A (zh) * 2014-07-30 2014-12-10 国家电网公司 合成绝缘子界面击穿故障的模拟方法
CN106291291A (zh) * 2016-10-10 2017-01-04 国网天津市电力公司 一种电力外绝缘湿雪电导特性检测方法
CN106908702A (zh) * 2017-03-10 2017-06-30 三峡大学 复合绝缘子伞裙表面覆冰试验机及试验方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104198897A (zh) * 2014-07-30 2014-12-10 国家电网公司 合成绝缘子界面击穿故障的模拟方法
CN106291291A (zh) * 2016-10-10 2017-01-04 国网天津市电力公司 一种电力外绝缘湿雪电导特性检测方法
CN106291291B (zh) * 2016-10-10 2018-03-06 国网天津市电力公司 一种电力外绝缘湿雪电导特性检测方法
CN106908702A (zh) * 2017-03-10 2017-06-30 三峡大学 复合绝缘子伞裙表面覆冰试验机及试验方法
CN106908702B (zh) * 2017-03-10 2019-03-29 三峡大学 复合绝缘子伞裙表面覆冰试验机及试验方法

Similar Documents

Publication Publication Date Title
CN102721907A (zh) 用于高海拔地区工频和冲击叠加电压试验的方法
CN203690524U (zh) 户外高电压等级变电设备测试操作杆
CN203367934U (zh) 直流融冰系统
CN202502203U (zh) 一种杆塔与绝缘子串覆冰桥接闪络模拟实验装置
CN204375507U (zh) 防污式复合绝缘子
CN201075318Y (zh) 一种绝缘子串电弧泄放装置
CN104952561A (zh) 10kV输电线路用防雷防冰针式复合绝缘子
CN103001141A (zh) 66千伏输电线路上防舞动间隔棒的带电安装方法
CN204760146U (zh) 10kV输电线路用防雷防冰悬式复合绝缘子
CN202839165U (zh) 一种防覆冰型复合绝缘子结构
CN207651922U (zh) 一种用于更换耐张单串合成绝缘子托瓶架
CN204066900U (zh) 高压输电线路可调式复合支撑绝缘子
CN201893186U (zh) 防风偏型复合绝缘子
CN203456188U (zh) 农网35kV配电化线路用复合横担绝缘子
CN104952560A (zh) 10kV输电线路用防雷防冰悬式复合绝缘子
CN203871807U (zh) 一种配电线路直线分支防鸟绝缘保护罩
CN204732236U (zh) 10kV输电线路用防雷防冰针式复合绝缘子
CN104752009B (zh) 一种防雷防冰绝缘子
CN202523492U (zh) 复合绝缘子
CN202949188U (zh) 电缆母排接头绝缘防护装置
CN103364656B (zh) 一种特高压线路直升机带电作业试验平台
CN103308799B (zh) 一种与gis连接的电缆线路参数测量的设备及方法
CN104269231A (zh) 带电流监测的绝缘子
CN105703270A (zh) 一种高压带电作业用的导线绝缘撑杆
CN203895336U (zh) 单绝缘子融冰接地刀闸

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20121024

CX01 Expiry of patent term