CN202499850U - Novel water cooled wall for gasification furnace - Google Patents

Novel water cooled wall for gasification furnace Download PDF

Info

Publication number
CN202499850U
CN202499850U CN2012200700325U CN201220070032U CN202499850U CN 202499850 U CN202499850 U CN 202499850U CN 2012200700325 U CN2012200700325 U CN 2012200700325U CN 201220070032 U CN201220070032 U CN 201220070032U CN 202499850 U CN202499850 U CN 202499850U
Authority
CN
China
Prior art keywords
pipe
wall
water
bend pipe
water cooled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012200700325U
Other languages
Chinese (zh)
Inventor
李维成
陈阳
孙登科
聂立
臧平伟
李由
曹蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongfang Boiler Group Co Ltd
Original Assignee
Dongfang Boiler Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongfang Boiler Group Co Ltd filed Critical Dongfang Boiler Group Co Ltd
Priority to CN2012200700325U priority Critical patent/CN202499850U/en
Application granted granted Critical
Publication of CN202499850U publication Critical patent/CN202499850U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Devices For Dispensing Beverages (AREA)

Abstract

The utility model discloses a novel water cooled wall for a gasification furnace, wherein a main body of the novel water cooled wall is a water cooled wall pipe; the water cooled wall pipe comprises membrane wall main body section elbows, conical section elbows and a forked pipe, wherein the main body section elbows are of a tube nest type and are uniformly distributed into a circle along the circumference direction of the reaction chamber to form a cylindrical barrel body; and the conical section bellows and the main body section elbows are connected into a whole by the forked pipe. The novel water cooled wall for the gasification furnace adopts a tube-nest membrane wall main body and a pipe-combined conical section based on the forked pipe, the main body section and the conical section are integrated, steam-water process is simplified, connecting pipelines and containers outside the conical section water cooled wall are saved, and complex connection, assembly and seal between the conical section and the main body section are avoided; and meanwhile, narrower flat steel width is ensured on the conical surface all the time, the possible problem that a local part of the flat steel of the water cooled wall of the conical section by adopting other modes can be solved, and the novel water cooled wall is very beneficial to prevent overtemperature of the water cooled wall.

Description

Novel gasifier water-cooling wall
Technical field
The utility model relates to a kind of gasifier water-cooling wall, belongs to the water wall technical field.
Background technology
It is a kind of development trend that modern large-scale airflow bed gasification furnace internals adopt water wall structure.Water wall structure has advantages such as thermal protection is safe, long service life.Water wall main paragraph regular shape generally has two kinds of structures of shell and tube membrane wall cylindrical shell or coil tube type cylindrical shell.And cone barrel often need be made owing to synthetic gas is drawn, deslagging or other reason in the water wall upper and lower.Awl tube special geometric form like this brings the difficulty of boring the design of section water wall and making.
Wherein shell gasifier water-cooling wall main body is the shell and tube membrane wall structure, and awl section is independent mutually with main paragraph, and two kinds of structural shapes are arranged, and a kind of is to be divided into several sections along boring high direction, and every section is made up of along conical surface coiling pipe several weeks; Another kind is except the height segmentation, also is divided into several sections at circumferential direction, and every section cambered surface that is folded to form back and forth by pipe constitutes, and each is bored cambered surface and is combined into complete awl section again.The gasifier water-cooling wall of these two kinds of structural shapes; Manufacture difficulty is all bigger on the one hand, on the other hand, because awl section water wall is independent mutually with the main body water wall; Need independent water-flow circuit; Therefore need independent collection case, and need complicated connecting pipeline, its structure and carbonated drink flow process are all compact inadequately.In addition, the weight supporting when last lower cone section and main paragraph assemble, assembly precision, stopping property etc. all need to consider specially, and coordinating size and sealing effectiveness are difficult to assurance because of deviation and operating expanding with heat and contract with cold probably.
In addition, siemens GSP gasifier water-cooling wall is the coil tube type structure: its upper and lower awl section is a body disc system with the main body water-cooled wall barrel, and the structure of this water wall is compact, but manufacture difficulty is big; In addition, the coil tube type structure has the intrinsic defective on conducting heat, if promptly steam in the pipe, vapour-liquid two is relative separation under action of centrifugal force, and the interior back-fire side of pipe is a water, the side of waring oneself in front of a fire is a vapour, the cooling meeting severe exacerbation of pipe side towards the fire.
The utility model content
The purpose of the utility model is: a kind of novel gasifier water-cooling wall is provided, and main paragraph adopts tubular structure to avoid the danger that the pipe cooling performance worsens when steaming of coil tube type water wall; On the conical surface, adopt wye to carry out the mode that pipe merges and realize the integrated of water wall awl section and main paragraph,, simplify the structure of water wall simultaneously, save the external connecting pipe road of lower cone section and collect case to simplify the carbonated drink flow process;
In addition, also reduce the processing and the assembly difficulty of water wall, be convenient to guarantee the manufacturing accuracy and the stopping property of water wall; Pipe transient mode on this conical surface can adapt to the various conical surface, guarantees on the whole conical surface, to avoid occurring the excessive situation of band steel part width, to guarantee the wall temperature security of water wall.Thereby can effectively solve the problem that exists in the existing gasifier water-cooling wall technique.
The purpose of the utility model realizes through following technical proposals: a kind of novel gasifier water-cooling wall; Main body is the water wall pipe; Said water wall pipe comprises membrane wall main paragraph bend pipe, awl section bend pipe and wye; Said main paragraph bend pipe is shell and tube circumferentially evenly arranges a week along reaction chamber, constitutes the membrane wall cylindrical shell, and said awl section bend pipe and main paragraph bend pipe fuse through wye.
As a kind of optimal way, be welded into a whole through the sealing of filling band steel between the said water wall pipe.
As further optimal way, the side towards the fire face down bonding of said water wall pipe connects pin and lays refractory materials.
As further optimal way, said water wall pipe comprises be arranged alternately No. one pipe and No. two pipes, and No. one pipe is managed into awl section circumferential arrangement form inwardly with No. two, a pipe and manage for No. two in wye be located at the different positions of boring section.
As a kind of optimal way, be merged into an awl section bend pipe through wye after the bending of said two or more main paragraph bend pipe.
As further optimal way, be merged into an awl section bend pipe through wye after the said adjacent two main paragraph bend pipe bendings.
As a kind of optimal way, awl section bend pipe links to each other with the collection case.
As further optimal way, said collection case is provided with the top and hangs or the steel plate of supported underneath collection case.
The effect of portion parts is following in the utility model:
Wye: connect a main paragraph bend pipe and an awl section bend pipe, and part main paragraph bend pipe is merged into an awl section bend pipe in twos,, adapt to the contraction of conical surface circumference to reduce circumferential pipe number side by side; Make water wall awl section and main paragraph integrated, avoided being connected and assembling of complicacy of awl section and main paragraph.
Compared with prior art; The beneficial effect of the utility model: the novel gasifier water-cooling wall of the utility model adopts shell and tube membrane wall main body and carries out the awl section of pipe combination type based on wye; Make main paragraph integrated, simplified the carbonated drink flow process, saved awl section water wall external connecting pipe road and collection case with the awl section; Avoided being connected of complicacy of awl section and main paragraph, assembling and sealing; Simultaneously; On the conical surface, also guaranteed narrower band steel width all the time; Problems such as the awl section water wall band steel part that possibly occur when having avoided adopting alternate manner is wide; To preventing that the water wall overtemperature from being very favorable, in addition, also avoided the danger that cooling performance worsens when steaming of coil tube type water wall; Its globality and good sealing effect, simultaneously simple and compact for structure, convenient processing and manufacture.
Description of drawings
Fig. 1 is the structural representation of the novel gasifier water-cooling wall of the utility model;
Fig. 2 is the enlarged diagram of pipe mode of connection on the conical surface among Fig. 1;
Fig. 3 is the enlarged diagram at I place among Fig. 2;
Fig. 4 is the A-A section structure for amplifying synoptic diagram among Fig. 1;
Fig. 5 is that P among Fig. 4 is to structural representation.
Among the figure: water wall pipe-101, main paragraph bend pipe-1, awl section bend pipe-2, wye-3, side towards the fire-4; Band steel-6, upper collecting chamber-7, refractory materials-8, next part case-9, pin-10;-12, tube body section bend pipe-13, of-11, No. two pipes of a pipe No. one pipe awl section bend pipe-14; No. two tube body section bend pipe-15, No. two pipe awl section bend pipes-16, upper collecting chamber props up device-17, next part case erecting by overhang-18.
Embodiment
Below in conjunction with specific embodiment and accompanying drawing the utility model is further described.
Disclosed all characteristics in this specification sheets, or the step in disclosed all methods or the process are except the speciality of mutual repulsion and/or the step; All can make up by any way; Only if special narration all can be replaced by other equivalences or the alternative features with similar purpose, promptly; Only if special narration, an embodiment in a series of equivalences of each characteristic or the similar characteristics.
Shown in Fig. 1-5, the main body of the novel gasifier water-cooling wall of the utility model is a water wall pipe 101, and said water wall pipe 101 comprises membrane wall main paragraph bend pipe 1, awl section bend pipe 2 and wye 3, and awl section bend pipe 2 one ends link to each other with the collection case; Said collection case is provided with that hang the top, the steel plate of supported underneath collection case, and specifically, this water wall is divided into upper collecting chamber 7 and next part case 9, and upper collecting chamber 7 adopts upper collecting chambers to prop up device 17 and supports, and next part case 9 adopts next part case erectings by overhang 18 to hang.Said main paragraph bend pipe 1 is shell and tube circumferentially evenly arranges a week along reaction chamber, constitutes the membrane wall cylindrical shell; Said awl section bend pipe 2 quantity are less than main paragraph bend pipe 1, and said awl section bend pipe 2 is linked to be an integral body through wye 3 and main paragraph bend pipe 1, are tube butt welding between said wye 3 and main paragraph bend pipe 1 and the awl section bend pipe 2.Said awl section bend pipe 2 constitutes with main paragraph bend pipe 1 one, has simplified the carbonated drink flow process, saved awl section water wall external connecting pipe road and collection case, has avoided being connected and assembling of complicacy of awl section and main paragraph.Said two or more main paragraph bend pipe 1 crooked back is merged into an awl section bend pipe 2 through wye 3, to reduce circumferential pipe number side by side, adapts to the contraction of conical surface circumference.According to specific requirement, can reasonably confirm to need to merge the quantity and the position of main paragraph bend pipe, and need rationally confirm what such merging mode.Pipe after final the merging links to each other with the collection case from an end of awl section bend pipe.
In the present embodiment, said water wall pipe 101 comprises 12, numbers pipes 11 of 11 and No. two pipes of a pipe and 12 one-tenth awl sections of No. two pipes circumferential arrangement form inwardly that are arranged alternately.Difference between 11 and No. two pipes 12 of a pipe is the position that its wye is provided with.As shown in Figure 3: in a said pipe 11: a tube body section bend pipe 13 crooked backs of adjacent two main paragraphs are merged into a pipe awl section bend pipe 14 through wye 3, and wye 3 is arranged on the position near a tube body section bend pipe 13; In said No. two pipes 12: No. two tube body sections of said adjacent two main paragraphs bend pipe 15 crooked backs are merged into No. two pipe awl section bend pipes 16 through wye 3, and wye 3 is arranged on the position near No. two pipe awl section bend pipes 16.Adopt both wye staggered arrangement of pipe 11 and No. two pipes 12 in the mode of different conical surface radius, thus with the contraction phase adaptation of conical surface circumference, the band steel width is all less everywhere can to guarantee the conical surface.In addition, the layout quantity of wye and position can be according to concrete needs flexible design, thereby adapt to the conical surface of different taperings, different big end diameters, are implemented in all can guarantee the conical surface under the various situation band steel width is less everywhere.
Integrally welded through 6 sealings of filling band steel between the said water wall pipe 101, side towards the fire 4 face down bondings of said water wall pipe 101 connect pin 10 and lay refractory materials 8.
In the present embodiment, be merged into an awl section bend pipe through wye after the said adjacent two main paragraph bend pipe bendings, thereby realize reducing number of tubes to adapt to the contraction of awl section circumference.Whole water wall main paragraph bend pipe 1 is connected among the carbonated drink flow process with awl section bend pipe 2, and the independent carbonated drink loop of awl Duan Buxu does not need extra collection case.
The above is merely the preferred embodiment of the utility model; Not in order to restriction the utility model; Any modification of being done within all spirit and principles at the utility model, be equal to replacement and improvement etc., all should be included within the protection domain of the utility model.

Claims (8)

1. novel gasifier water-cooling wall; Main body is the water wall pipe; Said water wall pipe comprises membrane wall main paragraph bend pipe and awl section bend pipe; It is characterized in that: said water wall pipe also comprises wye, and said main paragraph bend pipe is shell and tube circumferentially evenly arranges a week along reaction chamber, and said awl section bend pipe fuses through wye and main paragraph bend pipe.
2. novel gasifier water-cooling wall as claimed in claim 1 is characterized in that: be connected into an integral body through the sealing weld of filling band steel between the said water wall pipe.
3. novel gasifier water-cooling wall as claimed in claim 2 is characterized in that: the side towards the fire face down bonding of said water wall pipe connects pin and lays refractory materials.
4. like the described novel gasifier water-cooling wall of arbitrary claim in claim 1 or 3, it is characterized in that: said water wall pipe comprises a pipe and No. two pipes that are arranged alternately, and No. one pipe is managed into awl section circumferential arrangement form inwardly with No. two.
5. novel gasifier water-cooling wall as claimed in claim 4 is characterized in that: be merged into an awl section bend pipe through wye after the bending of said two or more main paragraph bend pipe.
6. novel gasifier water-cooling wall as claimed in claim 5 is characterized in that: be merged into an awl section bend pipe through wye after the said adjacent two main paragraph bend pipe bendings.
7. novel gasifier water-cooling wall as claimed in claim 1 is characterized in that: awl section bend pipe links to each other with the collection case.
8. novel gasifier water-cooling wall as claimed in claim 7 is characterized in that: said collection case is provided with the top and hangs or the steel plate of supported underneath collection case.
CN2012200700325U 2012-02-29 2012-02-29 Novel water cooled wall for gasification furnace Expired - Lifetime CN202499850U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200700325U CN202499850U (en) 2012-02-29 2012-02-29 Novel water cooled wall for gasification furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200700325U CN202499850U (en) 2012-02-29 2012-02-29 Novel water cooled wall for gasification furnace

Publications (1)

Publication Number Publication Date
CN202499850U true CN202499850U (en) 2012-10-24

Family

ID=47036470

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200700325U Expired - Lifetime CN202499850U (en) 2012-02-29 2012-02-29 Novel water cooled wall for gasification furnace

Country Status (1)

Country Link
CN (1) CN202499850U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103160329A (en) * 2013-03-22 2013-06-19 东方电气集团东方锅炉股份有限公司 Coal water slurry water wall gasification furnace of waste heat boiler process

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103160329A (en) * 2013-03-22 2013-06-19 东方电气集团东方锅炉股份有限公司 Coal water slurry water wall gasification furnace of waste heat boiler process

Similar Documents

Publication Publication Date Title
CN201141488Y (en) Flange joint structure of multi-layer vacuum heat-insulation pipe
CN101644369B (en) A connector for connecting between a reaction pipe and a cooling pipe as well as a method for connecting a reaction pipe to a cooling pipe
CN101852569B (en) Support fixed structure of spiral heat exchange tube
US20120145367A1 (en) Heat exchanger and nozzle of heat exchanger
CN202499850U (en) Novel water cooled wall for gasification furnace
CN105797650A (en) Fixed-bed catalytic temperature-control reactor with headers
CN201032440Y (en) Snakelike structure separating hot pipe heat exchanging system
CN205843428U (en) A kind of coiled heat exchanger being provided with interlamellar spacing
JPS62185192A (en) Nuclear reactor pressure vessel
CN108699447A (en) Heat exchanger for quenching reaction gas
CN102748753B (en) Soot cooler
CN105217572A (en) Three sections of two-in-one synthetic furnaces of cooling type low temperature chlorination hydrogen
CN210687301U (en) Double-wall pipe with free expansion joint
CN115253924B (en) Vertical radial flow reactor
CN208536390U (en) A kind of energy-conserving steam boiler for dual purpose liner
CN112944956A (en) U-shaped tubular heat exchanger with high-temperature and high-pressure tube pass structure
CN207569906U (en) A kind of heat exchanger of improvement
CN205781650U (en) A kind of thermal expansion of pipeline compensation device
CN201095630Y (en) Inclined inserting type outside warmer
CN105508795A (en) Two-layer corrugated expansion joint
CN220507799U (en) Molten salt distributor of large molten salt storage tank
CN204987969U (en) Gaseous effluent cooler
CN201858650U (en) Water-cooling slag discharge device
CN209423573U (en) A kind of bundled tube external warmer device
JP6362515B2 (en) EGR cooler and manufacturing method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20121024

CX01 Expiry of patent term