CN202494271U - Device for liquefying natural gas through refrigeration of single mixed working medium - Google Patents

Device for liquefying natural gas through refrigeration of single mixed working medium Download PDF

Info

Publication number
CN202494271U
CN202494271U CN 201220092122 CN201220092122U CN202494271U CN 202494271 U CN202494271 U CN 202494271U CN 201220092122 CN201220092122 CN 201220092122 CN 201220092122 U CN201220092122 U CN 201220092122U CN 202494271 U CN202494271 U CN 202494271U
Authority
CN
China
Prior art keywords
heat exchanger
gas
exchanger channels
liquid
separator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220092122
Other languages
Chinese (zh)
Inventor
何振勇
王贵歧
刘丽梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xindi Energy Engineering Technology Co Ltd
ENN Science and Technology Development Co Ltd
Original Assignee
Xindi Energy Engineering Technology Co Ltd
ENN Science and Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xindi Energy Engineering Technology Co Ltd, ENN Science and Technology Development Co Ltd filed Critical Xindi Energy Engineering Technology Co Ltd
Priority to CN 201220092122 priority Critical patent/CN202494271U/en
Application granted granted Critical
Publication of CN202494271U publication Critical patent/CN202494271U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Separation By Low-Temperature Treatments (AREA)

Abstract

The utility model relates to a device for liquefying natural gas through refrigeration of a single mixed working medium. The device comprises a two-section mixed working medium compressor driven by a motor, two coolers, a liquid pump, four gas-liquid separators, two throttling devices, a group of plate-fin heat exchanger sets and an LNG (Liquefied Natural Gas) storage tank. According to the device, a mixed refrigerant is compressed and separated stage by stage in an adopted flow, so that the power consumption for compression of the gas is reduced; heat exchange curves of cold fluid and hot fluid in an entire heat exchange process are matched better by using multi-stage heat exchange, so that the flow rate of the mixed refrigerant is effectively reduced; and in addition, the flow adopted by the device has excellent adaptability to variable load operation of the device, so that the problem of liquid accumulation at the bottom of a cold box can be effectively solved.

Description

Adopt the device of single mixed working fluid refrigeration liquefying natural gas
Technical field
The utility model relates to the liquefaction production of being rich in hydrocarbon gas, is specifically related to a kind of device of single mixed working fluid refrigeration liquefying natural gas.
Background technology
Natural gas is owing to its feature of environmental protection becomes the optimisation substance that replaces other fuel, and its application expands aspects such as generating, automobile usefulness gas, industrial gas, city dweller's usefulness gas, chemical industry usefulness gas gradually to.
Along with the growth of natural gas consumption amount, the most effectively supply with one of form as natural gas, the volume of trade of liquefied natural gas has also become one of fastest-rising field of energy market.The continuous development of liquefied natural gas industry is then had higher requirement at aspects such as energy consumption, investment and efficient to natural gas liquefaction and device.
At present, the natural gas liquefaction process of comparative maturity mainly contains: stepwise refrigeration process, swell refrigeration technology and mixed working fluid refrigeration process.Single mixed working fluid refrigeration process wherein then relatively receives the favor of medium-sized LNG device.
In the natural gas liquefaction of existing single mixed working fluid refrigeration, the cryogen compressibility is the secondary compression, and the one-level heat exchange is adopted in natural gas liquefaction.
Existing technology: as shown in Figure 1, the device of its use comprises a motor-driven two-period form mixed working fluid compressor, two coolers, two gas-liquid separators, two liquid pumps, a platen fin heat exchanger and a LNG storage tank; The mixed working fluid of being made up of C1~C5 and N2 is through getting into the inlet of compressor behind the rational proportion; Be compressed to 0.6~1MPa through one section; Get into the one-level cooler and be cooled to 30~40 ℃; Get into the one-level knockout drum again and carry out gas-liquid separation, the isolated gas in one-level knockout drum top continues to get into two sections inlets of compressor, is compressed to 1.6~2.5MPa through two sections; One-level is separated the bottom and is separated the liquid that the obtains gas through liquid pump pressurization back and two sections compressor outlets and be mixed into secondary coolers and be cooled to 30~40 ℃; Cooled mixed working fluid gets into the secondary knockout drum subsequently and carries out gas-liquid separation, and the liquid after the separation mixes the laggard plate-fin heat exchanger of going into through secondary liquid pump pressurization back and gas that this separator top obtains, and this plate-fin heat exchanger is returned in throttling again after precooling to the uniform temperature; For whole heat transfer process provides cold, natural gas is through getting in the LNG storage tank behind the plate-fin heat exchanger.
In above-mentioned technology; For guaranteeing that liquids and gases get into same plate-fin heat exchanger passage and participate in heat exchange; The liquid of final stage gas-liquid separator bottom must pressurize to overcome the head of liquid that difference in height that the separator bottom liquid exports to plate-fin heat exchanger top cryogen inlet is brought, and must realize through increasing final stage liquid pump.Cryogen and the natural gas heat transfer process in plate-fin heat exchanger is the one-level heat exchange; The optimization of heat transfer temperature difference receives certain limitation between the stream thigh, and plant energy consumption is higher, and; This kind flow process is easy to generate ice chest bottom hydrops, and the varying duty running of installing is not had excellent adaptability.
The utility model content
The utility model adopts single mixed working fluid refrigeration to make natural gas liquefaction.
The utility model provides a kind of device that adopts single mixed working fluid refrigeration liquefying natural gas; It comprises azeotrope compressibility and ice chest system; Wherein the azeotrope compressibility adopts two-period form mixed working fluid compressor to compress; This compressibility comprise two-period form mixed working fluid compressor, respectively with first section two cooler that are connected with second section (i.e. first cooler and second cooler) of said two-period form mixed working fluid compressor, first gas-liquid separator being connected with second cooler with said first cooler respectively and second gas-liquid separator with said two gas-liquid separators in the middle of a liquid pump being connected of first gas-liquid separator; Wherein the ice chest system comprise with said two gas-liquid separators in one group of plate-fin heat exchanger group being connected of the liquid phase end of second gas-liquid separator, two throttling arrangements that are connected with the heat exchanger channels of said plate-fin heat exchanger group, with two heat exchanger channels and above-mentioned wherein throttling arrangement a cryogen separator that is connected and a natural gas heavy hydrocarbon separator that is connected with an independent heat exchanger channels of said plate-fin heat exchanger group of said plate-fin heat exchanger group; Wherein the gas phase end of first gas-liquid separator in two gas-liquid separators is connected with second compression section of two-period form mixed working fluid compressor; The liquid phase end of first gas-liquid separator is connected to second cooler in said two coolers after converging via the outlet conduit of a liquid pump and second compression section, and the gas phase end of second gas-liquid separator is connected with two heat exchanger channels of said one group of plate-fin heat exchanger group respectively with the liquid phase end; The gas phase end of wherein above-mentioned first throttling arrangement connection cryogen separator converges the back with the liquid phase end and is connected with a heat exchanger channels of said plate-fin heat exchanger group; The other end of above-mentioned another throttling arrangement connects the middle part that connects the cryogen separator behind the heat exchanger channels; Natural gas line is connected to the heavy hydrocarbon separator through the above-mentioned independent heat exchanger channels of heat exchanger package, is connected to the LNG storage tank behind the heat exchanger channels of the top gas phase end of heavy hydrocarbon separator through heat exchanger package.
The utility model adopts single mixed working fluid to freeze to come the device of liquefied natural gas, and it is divided into natural gas circulation and mixed working fluid kind of refrigeration cycle.In the mixed working fluid loop, mixed working fluid is followed gas-liquid separation step by step in the compression process step by step simultaneously at it, and one-level is compressed isolated liquid phase stream thigh and do not participated in follow-up compression process, has effectively reduced postorder gas compression power consumption; The gas phase that obtains through compression flows the different passage throttling heat exchange that stock does not get into heat exchanger package with liquid-phase mixing working medium; Compare traditional handicraft and saved final stage liquid pump (promptly only using a liquid pump), and adopt the secondary heat exchange to make that the heat exchange curve of hot-fluid thigh and cold flow thigh more matees in the whole process; The utility model adopts flow process that the varying duty running of device is had excellent adaptability, can effectively avoid ice chest bottom hydrops.
The single mixed working fluid of the said employing of the utility model freezes and comes the device of liquefied natural gas, comprises two-period form mixed working fluid compressor, cooler, gas-liquid separator, throttling arrangement, one group of plate-fin heat exchanger group and a LNG storage tank.The compressibility of its mix refrigerant comprises a two-period form mixed working fluid compressor, two coolers, two gas-liquid separators and a liquid pump, and the ice chest system comprises one group of plate-fin heat exchanger group, two gas-liquid separators (a heavy hydrocarbon separator and a cryogen separator) and two throttling arrangements; Mixed working fluid and natural gas are accomplished whole heat transfer process in the ice chest system.
In the azeotrope compressibility; The outlet of first compression section of compressor is connected to first order cooler; First order cooler is connected with first order gas-liquid separator again; The gas phase end of first order gas-liquid separator is connected to second compression section, and the bottom liquid phases end of first order gas-liquid separator is connected to a liquid pump, is connected to second-stage cooler after the outlet conduit of the output channel of this liquid pump and second compression section converges; Second-stage cooler is connected with second level gas-liquid separator again, and the top gas phase end of second level gas-liquid separator is connected with first heat exchanger channels (gas phase channel) of heat exchanger package; The bottom liquid phases end of second level gas-liquid separator is connected with second heat exchanger channels of heat exchanger package;
In the ice chest system; The liquid phase end of the second level gas-liquid separator of being derived by the azeotrope compressibility is connected to an end of first throttle device through second heat exchanger channels in the heat exchanger package; The other end of first throttle device connects the cryogen separator, and the top gas phase end and the bottom liquid phases end of cryogen separator converges and be connected to first compression section after being connected the 3rd heat exchanger channels; The gas phase end that gas-liquid separator top, the second level obtains is through heat exchanger package first heat exchanger channels (gas phase channel) precooling; Be connected with an end of second throttling arrangement, the other end of second throttling arrangement connects the cryogen separator after being connected to the 4th heat exchanger channels of heat exchanger package again; Natural gas line is connected to the heavy hydrocarbon separator through the 5th heat exchanger channels of heat exchanger package, and the top gas phase end of heavy hydrocarbon separator is connected to the LNG storage tank behind all the other heat exchangers at different levels (for example the 6th heat exchanger channels) through heat exchanger package successively.
The technical scheme of the utility model is summarized as follows:
Adopt the device of single mixed working fluid refrigeration liquefying natural gas, this device comprises azeotrope compressibility and ice chest system,
Wherein this compressibility comprise two-period form mixed working fluid compressor, first cooler being connected with second section with first section of said two-period form mixed working fluid compressor respectively and second cooler, first gas-liquid separator being connected with second cooler with said first cooler respectively and second gas-liquid separator with said two gas-liquid separators in the middle of first liquid pump that is connected
Wherein the ice chest system comprises: one group of plate-fin heat exchanger group; It comprises at least six heat exchanger channels; Promptly comprise the first, second, third, fourth, the 5th and the 6th heat exchanger channels at least; The input of said second heat exchanger channels and first heat exchanger channels via two pipelines respectively with said azeotrope compressibility in the liquid phase end of second gas-liquid separator be connected with the gas phase end and the output of the 3rd heat exchanger channels is connected to first compression section via pipeline;
First throttling arrangement that is connected with the output of second heat exchanger channels of said plate-fin heat exchanger group;
Second throttling arrangement that is connected with the input of the output of first heat exchanger channels of said plate-fin heat exchanger group and the 4th heat exchanger channels;
With
The cryogen separator that is connected with first throttling arrangement with the output of the input of the 3rd heat exchanger channels of said plate-fin heat exchanger group, the 4th heat exchanger channels;
With an independent heat exchanger channels of said plate-fin heat exchanger group is the natural gas heavy hydrocarbon separator that the 5th heat exchanger channels is connected,
Wherein the gas phase end of first gas-liquid separator in two gas-liquid separators is connected with second compression section of two-period form mixed working fluid compressor; The liquid phase end of first gas-liquid separator is connected to second cooler in said two coolers after converging via the outlet conduit of the liquid pump and second compression section, the gas phase end of second gas-liquid separator and liquid phase end respectively with two heat exchanger channels of said one group of plate-fin heat exchanger group promptly the input of first heat exchanger channels and second heat exchanger channels be connected; Connect the cryogen separator behind wherein above-mentioned first throttling arrangement; The top gas phase end and the bottom liquid phases end of cryogen separator converges the input that the back is connected the 3rd heat exchanger channels; First section of the output of the 3rd heat exchanger channels and two-period form mixed working fluid compressor is connected; Above-mentioned second throttling arrangement connects the cryogen separator after connecting the 4th heat exchanger channels input; The above-mentioned independent heat exchanger channels of the pipeline that is used to carry purified natural gas through heat exchanger package i.e. the 5th heat exchanger channels is connected to the heavy hydrocarbon separator, and the top gas phase end of heavy hydrocarbon separator promptly is connected to LNG tank behind the 6th heat exchanger channels through a heat exchanger channels of heat exchanger package.
In addition, the top gas phase end of heavy hydrocarbon separator successively through behind the 6th heat exchanger channels of heat exchanger package further other the 7th heat exchanger channels through heat exchanger package be connected to LNG tank.
" first section compression " described here or " one section compression " and " first compression section " interchangeable use, by that analogy.
Operating process is described below.
The device of the said two-period form mixed working fluid of the utility model compressibility; In its azeotrope compressibility; The exit gas that compressor is first section gets into the back that is cooled in the first order cooler and carries out gas-liquid separation through first order gas-liquid separator; Gas phase after the separation continues to get into second compression section; Liquid phase after the separation through liquid pump pressurization back with converge through the hot gas after second section compression, in the gas-liquid separator of the entering second level, second-stage cooler cooling back, carry out gas-liquid separation again, first heat exchanger channels (gas phase channel) of the gas phase entering downstream heat exchanger after the separation; The liquid that gas-liquid separator bottom, the second level obtains gets into the second liquid phase heat exchanger channels of downstream heat exchanger respectively.In the ice chest system; The second liquid phase heat exchanger channels that the liquid cryogen that is come by the second level gas-liquid separator bottom of cryogen compressibility gets into heat exchanger package by precooling after again through the first throttle device; This stream after the throttling strand entering cryogen separator is divided into gas-liquid two-phase; Be back to after gas-liquid two-phase converges in the 3rd heat exchanger channels of heat exchanger package cold is provided, the azeotrope that flows out from the 3rd heat exchanger channels is transferred gets back to first compression section.The gas phase cryogen that is come by gas-liquid separator top, the second level carries out throttling via first heat exchanger channels of heat exchanger package, second throttling arrangement of flowing through again after by precooling; In the 4th heat exchanger channels of burst reverse entering heat exchanger package of this stream after the throttling, draw after re-heat to the uniform temperature and get into the cryogen separator.Natural gas at first is cooled to get in the heavy hydrocarbon separator after the uniform temperature through the 5th heat exchanger channels of heat exchanger package and separates; The bottom obtains the heavy hydrocarbon component; All the other heat exchangers at different levels (for example the 6th heat exchanger channels) that the gas phase that the top obtains partly continues to get into heat exchanger package carry out heat exchange; Be cooled to supercooled state, the LNG that obtains gets in the LNG storage tank and is stored.
The technological process of the device that adopts single mixed working fluid to freeze to come liquefied natural gas is following:
The natural gas circulation:
The 5th heat exchanger channels that raw natural gas after the purification at first gets into the plate-fin heat exchanger group carries out precooling; Get into the heavy hydrocarbon separator after being cooled to-30 ℃~-80 ℃ and carry out gas-liquid separation; Continue to get into all the other heat exchangers at different levels (for example the 6th heat exchanger channels) of heat exchanger package by the isolated vapor phase stream thigh in heavy hydrocarbon separator top; And being cooled to-130 ℃~-166 ℃ therein, the liquefied natural gas that obtains is sent in the LNG storage tank and is stored.
The azeotrope circulation:
By the mixed working fluid that C1~C5 and N2 form, promptly be selected from C1, C2, C3, C4 and C5 alkane and N 2In four kinds, five kinds or six kinds; They are according to the arbitrary volume ratio or according to the volume ratio that approximately is equal to; Get into the inlet of compressor, warp is compressed to 0.6~1.8MPaA for first section, gets into first order cooler and is cooled to 30 ℃~40 ℃; Get into first order gas-liquid separator again and carry out gas-liquid separation; The isolated gas in first order gas-liquid separator top continues to get into second section inlet of compressor, is compressed to 1.2~5.4MPaA through two sections, and the isolated liquid of first order gas-liquid separator bottom liquid phases end is after the hot gas of liquid pump pressurization back and second section compression outlet conduit converges; Get into again and be cooled to 30 ℃~40 ℃ in the second-stage cooler; Cooled mixed working fluid gets into second level gas-liquid separator subsequently and carries out gas-liquid separation, and the top gas of second level gas-liquid separator gets into first heat exchanger channels of main heat exchanger group subsequently and participates in heat exchange, and the isolated liquid in second level gas-liquid separator bottom gets into second heat exchanger channels of main heat exchanger group and participates in heat exchange;
The liquid of drawing from the gas-liquid separator bottom, the second level of mixed working fluid compressibility at first gets into second heat exchanger channels of heat exchanger package; Therein by-30 ℃~-80 ℃ extremely approximately of precoolings; Behind first throttle valve throttling to 0.2~0.8MPaA, get into the cryogen separator; Be cooled to-135 ℃~-169 ℃ by the vapor phase stream thigh of the isolated mixed working fluid in gas-liquid separator top, the second level gas phase channel (first heat exchanger channels) through heat exchanger package; Reverse the 4th heat exchanger channels that gets into heat exchanger package is that heat exchanger provides cold behind second choke valve throttling to 0.2~0.8MPaA again; Re-heat is drawn heat exchanger package after-30 ℃~-80 ℃ and is got into cryogen separator middle part and mix with the stream thigh of above-mentioned same entering cryogen separator after the throttling of first order choke valve; The two is separated into gas-liquid two-phase in the cryogen separator, it is that heat exchanger package provides cold that gas-liquid two-phase converges the reverse entering in back third level heat exchanger channels, turns back to first compression section then.
Here, pressure unit MPaA is a MPa, absolute pressure.In the utility model, generally speaking, an equipment was realized with being connected through pipeline of another equipment.
The advantage of the utility model:
1. the varying duty running to device has excellent adaptability, and the final stage gas phase gets into the cryogen separator after the re-heat of backflowing after the throttling, can effectively avoid ice chest bottom hydrops, thereby guarantee that when running on the lower load product energy consumption and nominal situation energy consumption are approaching.
2. adopt two-period form azeotrope compressor in the utility model device, azeotrope has been compressed and separation step by step step by step, reduced the power consumption of gas compression.
3. one-level gas-liquid separator bottom liquid stream thigh is not participated in follow-up compression process, has reduced the influence degree of the fluctuation of azeotrope proportioning to the compressor bank operating condition to a certain extent, makes whole device be easier to operation.
4. adopt the secondary heat exchange to make the cold fluid of whole heat transfer process and the heat exchange curve of hot fluid more mate, effectively reduced the flow of azeotrope.
Description of drawings
Fig. 1 is a kind of structure chart of prior art;
Fig. 2 is the device allocation plan of the said mixed working fluid refrigeration system of the utility model.
Wherein: 1 two-period form mixed working fluid compressor, 6 heavy hydrocarbon separators, 7 cryogen separators, 21,22 coolers, 31,32 gas-liquid separators, 4,4 ' liquid pump, 8 plate-fin heat exchangers, 9LNG storage tank, 51,52 choke valves
The specific embodiment
Further specify below in conjunction with accompanying drawing.
Device shown in Figure 2 comprises two-period form mixed working fluid compressor 1; First cooler 21, second cooler 22; First gas-liquid separator 31, second gas-liquid separator 32, two gas-liquid separators (heavy hydrocarbon separator 6, cryogen separator 7); Liquid pump 4, first throttle device 51,52, one groups of plate-fin heat exchanger groups 8 of second throttling arrangement (being the main heat exchanger group) and a LNG storage tank 9.The compressibility of its mix refrigerant comprises a two-period form mixed working fluid compressor 1; Two coolers 21,22; Two gas- liquid separators 31,32; A liquid pump 4, the ice chest system comprises one group of plate-fin heat exchanger group 8 (two-stage heat exchange), heavy hydrocarbon separator 6, cryogen separator 7 and two throttling arrangements 51,52; Mixed working fluid and natural gas are accomplished whole heat transfer process in the ice chest system.In the azeotrope compressibility; The outlet that compressor is 1 first section is connected to first order cooler 21; First order cooler 21 is connected with first order gas-liquid separator 31 again; The gas phase end of first order gas-liquid separator 31 is connected to second compression section, and first order gas-liquid separator 31 bottom liquid phases ends are connected to liquid pump 4, is connected to second-stage cooler 22 after the outlet conduit of the output of liquid pump 4 and second compression section converges; Second-stage cooler 22 is connected with second level gas-liquid separator 32 again, and gas-liquid separator 32 top gas phase ends in the second level are connected with first heat exchanger channels (gas phase channel) of heat exchanger package 8; Gas-liquid separator 32 bottom liquid phases ends in the second level are connected with the second liquid phase heat exchanger channels of heat exchanger package 8;
In the ice chest system; Be connected to an end of first throttle device 51 through second heat exchanger channels in the heat exchanger package 8 by the next second level gas-liquid separator 32 liquid phase ends of azeotrope compressibility; The other end of first throttle device 51 connects cryogen separator 7 middle parts, and cryogen separator 7 top gas phase ends converge afterwards and after the 3rd heat exchanger channels of heat exchanger package 8 is connected with the bottom liquid phases end and are connected to first compression section; The gas phase end that secondary gas-liquid separator 32 tops obtain passes through first heat exchanger channels of heat exchanger package 8 by precooling; Be connected with second throttling arrangement, 52 1 ends, the other end of second throttling arrangement 52 is connected to the middle part that is connected to cryogen separator 7 behind the 4th heat exchanger channels of heat exchanger package 8 again; Natural gas line is connected to heavy hydrocarbon separator 6 through the 5th heat exchanger channels of heat exchanger package; The top gas phase end of heavy hydrocarbon separator 6 is connected to LNG storage tank 9 behind all the other heat exchangers at different levels through heat exchanger package 8 (the 6th heat exchanger channels for example, randomly can also through the 7th heat exchanger channels) successively.
The technological process of the device of use Fig. 2 is following:
The natural gas circulation:
Shown in accompanying drawing 2; Raw natural gas after the purification at first gets in the 5th heat exchanger channels in the plate-fin main heat exchanger group 8 by precooling; Get in the heavy hydrocarbon separator 6 after being cooled to-30 ℃~-80 ℃ and carry out gas-liquid separation; Continue to get into all the other heat exchangers at different levels of main heat exchanger group 8 by the isolated vapor phase stream thigh in heavy hydrocarbon separator 6 tops; And be cooled to-130 ℃~-166 ℃ therein, and the liquefied natural gas that obtains is sent in the LNG storage tank 9 and is stored, and the bottom of heavy hydrocarbon separator 6 obtains liquefied petroleum gas (LPG).
The azeotrope circulation:
By the mixed working fluid that C1~C5 and N2 form, promptly be selected from C1, C2, C3, C4 and C5 alkane and N 2In four kinds, five kinds or six kinds; They are according to the arbitrary volume ratio or according to the volume ratio that approximately is equal to; Get into the inlet of compressor 1, warp is compressed to 0.6~1.8MPaA for one section, gets into one-level cooler 21 and is cooled to 30 ℃~40 ℃; Get into one-level gas-liquid separator 31 again and carry out gas-liquid separation; The isolated gas in one-level gas-liquid separator 31 tops continues second section inlet of entering compressor, and warp is compressed to 1.2~5.4MPaA for two sections, and the isolated liquid of first order gas-liquid separator 31 bottom liquid phases ends is after the hot gas that exports with two sections compressions after 4 pressurizations of liquid pump converges; Get into second-stage cooler 22 again and be cooled to 30 ℃~40 ℃; Cooled mixed working fluid gets into subsequently and carries out gas-liquid separation in the second level gas-liquid separator 32, and gas-liquid separator 32 top gas in the second level get into first heat exchanger channels of main heat exchanger group 8 subsequently and participate in heat exchange, and the isolated liquid in second level gas-liquid separator 32 bottoms gets into second heat exchanger channels of main heat exchanger group 8 and participates in heat exchange;
The liquid of drawing from second level gas-liquid separator 32 bottoms of mixed working fluid compressibility at first gets into second heat exchanger channels of heat exchanger package; Therein by-30 ℃~-80 ℃ extremely approximately of precoolings; Behind choke valve 51 throttlings to 0.2~0.8MPaA, get into cryogen separator 7 and be separated into gas-liquid two-phase; Cryogen separator 7 top gas phases and bottom liquid phases are converged the reverse previous stage heat exchanger (i.e. the 3rd heat exchanger channels) that gets in back provides cold for heat exchanger package 8, turns back to first compression section then.Be cooled to-135 ℃~-169 ℃ by the vapor phase stream thigh of the isolated mixed working fluid in the second level gas-liquid separator 32 tops gas phase channel (i.e. first heat exchanger channels) through heat exchanger package 8; Behind second choke valve, 52 throttlings to 0.2~0.8MPaA, for heat exchanger package cold is provided in the 4th heat exchanger channels of reverse entering heat exchanger package 8 again; Re-heat is drawn heat exchanger package entering cryogen separator 7 middle parts after-30 ℃~-80 ℃; The stream thigh that after cooling, throttling, produces with the liquid phase of above-mentioned secondary gas-liquid separator 32 bottoms converges; And as stated; The top gas phase and the bottom liquid phases that go out cryogen separator 7 are converged the reverse previous stage heat exchanger (i.e. the 3rd heat exchanger channels) that gets in back provides cold for heat exchanger package 8, turns back to first compression section then.

Claims (2)

1. adopt the device of single mixed working fluid refrigeration liquefying natural gas, it is characterized in that: this device comprises azeotrope compressibility and ice chest system,
Wherein this compressibility comprise two-period form mixed working fluid compressor, first cooler being connected with second section with first section of said two-period form mixed working fluid compressor respectively and second cooler, first gas-liquid separator being connected with second cooler with said first cooler respectively and second gas-liquid separator with said two gas-liquid separators in the middle of first liquid pump that is connected
Wherein the ice chest system comprises:
One group of plate-fin heat exchanger group; It comprises at least six heat exchanger channels: the 5th and the 6th heat exchanger channels first, second, third, fourth; The input of said second heat exchanger channels and first heat exchanger channels via two pipelines respectively with said azeotrope compressibility in the liquid phase end of second gas-liquid separator be connected with the gas phase end and the output of the 3rd heat exchanger channels is connected to first compression section via pipeline;
First throttling arrangement that is connected with the output of second heat exchanger channels of said plate-fin heat exchanger group;
Second throttling arrangement that is connected with the input of the output of first heat exchanger channels of said plate-fin heat exchanger group and the 4th heat exchanger channels;
With
The cryogen separator that is connected with first throttling arrangement with the output of the input of the 3rd heat exchanger channels of said plate-fin heat exchanger group, the 4th heat exchanger channels;
With an independent heat exchanger channels of said plate-fin heat exchanger group is the natural gas heavy hydrocarbon separator that the 5th heat exchanger channels is connected,
Wherein the gas phase end of first gas-liquid separator in two gas-liquid separators is connected with second compression section of two-period form mixed working fluid compressor; The liquid phase end of first gas-liquid separator is connected to second cooler in said two coolers after converging via the outlet conduit of the liquid pump and second compression section, the gas phase end of second gas-liquid separator and liquid phase end respectively with two heat exchanger channels of said one group of plate-fin heat exchanger group promptly the input of first heat exchanger channels and second heat exchanger channels be connected; Connect the cryogen separator behind wherein above-mentioned first throttling arrangement; The top gas phase end of cryogen separator be connected the 3rd heat exchanger channels input after the bottom liquid phases end converges; First section of the output of the 3rd heat exchanger channels and two-period form mixed working fluid compressor is connected; Above-mentioned second throttling arrangement connects the cryogen separator after connecting the 4th heat exchanger channels input; The above-mentioned independent heat exchanger channels of the pipeline that is used to carry purified natural gas through heat exchanger package i.e. the 5th heat exchanger channels is connected to the heavy hydrocarbon separator, and the top gas phase end of heavy hydrocarbon separator promptly is connected to LNG tank behind the 6th heat exchanger channels through a heat exchanger channels of heat exchanger package successively.
2. the device of the single mixed working fluid refrigeration liquefying of employing according to claim 1 natural gas is characterized in that:
The top gas phase end of heavy hydrocarbon separator successively through behind the 6th heat exchanger channels of heat exchanger package further other the 7th heat exchanger channels through heat exchanger package be connected to LNG tank.
CN 201220092122 2012-03-13 2012-03-13 Device for liquefying natural gas through refrigeration of single mixed working medium Expired - Lifetime CN202494271U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220092122 CN202494271U (en) 2012-03-13 2012-03-13 Device for liquefying natural gas through refrigeration of single mixed working medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220092122 CN202494271U (en) 2012-03-13 2012-03-13 Device for liquefying natural gas through refrigeration of single mixed working medium

Publications (1)

Publication Number Publication Date
CN202494271U true CN202494271U (en) 2012-10-17

Family

ID=47000496

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220092122 Expired - Lifetime CN202494271U (en) 2012-03-13 2012-03-13 Device for liquefying natural gas through refrigeration of single mixed working medium

Country Status (1)

Country Link
CN (1) CN202494271U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102636000A (en) * 2012-03-13 2012-08-15 新地能源工程技术有限公司 Method for refrigerating liquefied natural gas by aid of single mixed working medium and device
CN103031169A (en) * 2012-12-13 2013-04-10 新地能源工程技术有限公司 Method and device for carrying out liquefaction and heavy hydrocarbon treatment on natural gas
CN104807287A (en) * 2015-05-22 2015-07-29 中国石油集团工程设计有限责任公司 Small natural gas liquefaction and refrigeration system and small natural gas liquefaction and refrigeration method
CN105135819A (en) * 2015-09-25 2015-12-09 杭州福斯达实业集团有限公司 Natural gas liquefaction device and method adopting double-compressor two-stage compressed mixed refrigerant for refrigeration

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102636000A (en) * 2012-03-13 2012-08-15 新地能源工程技术有限公司 Method for refrigerating liquefied natural gas by aid of single mixed working medium and device
WO2013135037A1 (en) * 2012-03-13 2013-09-19 新地能源工程技术有限公司 Apparatus and method for liquefying natural gas by refrigerating single mixed working medium
CN102636000B (en) * 2012-03-13 2014-07-23 新地能源工程技术有限公司 Method for refrigerating liquefied natural gas by aid of single mixed working medium and device
CN103031169A (en) * 2012-12-13 2013-04-10 新地能源工程技术有限公司 Method and device for carrying out liquefaction and heavy hydrocarbon treatment on natural gas
CN103031169B (en) * 2012-12-13 2014-05-07 新地能源工程技术有限公司 Method and device for carrying out liquefaction and heavy hydrocarbon treatment on natural gas
CN104807287A (en) * 2015-05-22 2015-07-29 中国石油集团工程设计有限责任公司 Small natural gas liquefaction and refrigeration system and small natural gas liquefaction and refrigeration method
CN105135819A (en) * 2015-09-25 2015-12-09 杭州福斯达实业集团有限公司 Natural gas liquefaction device and method adopting double-compressor two-stage compressed mixed refrigerant for refrigeration

Similar Documents

Publication Publication Date Title
CN202328997U (en) Device for refrigerating liquefied natural gas by adopting single mixed working medium
CN102636000B (en) Method for refrigerating liquefied natural gas by aid of single mixed working medium and device
CN202361751U (en) Device for refrigerating liquefied natural gas by adopting single mixed refrigerant
RU2538192C1 (en) Method of natural gas liquefaction and device for its implementation
CN101967413A (en) Method and device for liquefying natural gas via refrigeration of single mixed refrigerant
CN103017480B (en) Liquefaction system for producing LNG (Liquefied Natural Gas) by using pressure energy of pipeline
US9920987B2 (en) Mixing column for single mixed refrigerant (SMR) process
CN102748919A (en) Single-cycle mixed-refrigerant four-stage throttling refrigeration system and method
WO2023272971A1 (en) Hydrogen liquefaction system
CN201463463U (en) Three-phase mixed refrigeration natural-gas liquefying device
CN202494271U (en) Device for liquefying natural gas through refrigeration of single mixed working medium
CN204678750U (en) A kind of natural gas liquefaction device realizing mix refrigerant recovery, re-injection
CN201762300U (en) Device using single-mixed refrigerant refrigeration to liquefy natural gas
CN202432825U (en) Device adopting single refrigeration of mixed working mediums to liquefy natural gas
CN103542692B (en) Based on the Unconventional forage liquefaction system of wrap-round tubular heat exchanger
CN103398545B (en) System for producing liquefied natural gas from raw gas by means of multi-stage pressure throttling
CN104807287A (en) Small natural gas liquefaction and refrigeration system and small natural gas liquefaction and refrigeration method
CN104913554A (en) Mixed refrigerant recovery and reinjection process and device
CN102564056A (en) Multi-flow spiral winding tube type main heat exchange equipment with mixed refrigerant for low-temperature liquefaction of LNG (liquefied natural gas)
CN107560321A (en) BOG is reclaimed and nitrogen gas liquefaction system and process
CN204630250U (en) A kind of mini gas liquefying refrigerating system
CN202630582U (en) Unicyclic mixed refrigerant four-stage throttling refrigeration system
CN102645084B (en) Method and device for preparing liquefied natural gas by using mixed refrigerant three-level refrigeration
CN104880024B (en) Natural gas liquefying system for double-expansion cooling process
CN207379164U (en) BOG is recycled and nitrogen gas liquefaction system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20121017

Effective date of abandoning: 20140723

RGAV Abandon patent right to avoid regrant