CN202483436U - Non-cavern butting and communicating exploitation system - Google Patents

Non-cavern butting and communicating exploitation system Download PDF

Info

Publication number
CN202483436U
CN202483436U CN2012200999159U CN201220099915U CN202483436U CN 202483436 U CN202483436 U CN 202483436U CN 2012200999159 U CN2012200999159 U CN 2012200999159U CN 201220099915 U CN201220099915 U CN 201220099915U CN 202483436 U CN202483436 U CN 202483436U
Authority
CN
China
Prior art keywords
well
field signal
target
bit
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012200999159U
Other languages
Chinese (zh)
Inventor
李根奎
张传峰
莫钺
杜石岭
杨国杰
黄文军
刘海涛
袁小明
章壮云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinopec Oilfield Service Corp
Original Assignee
Jiangsu Petroleum Exploration Bureau Of China Petrochemical Corp
China Petrochemical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Petroleum Exploration Bureau Of China Petrochemical Corp, China Petrochemical Corp filed Critical Jiangsu Petroleum Exploration Bureau Of China Petrochemical Corp
Priority to CN2012200999159U priority Critical patent/CN202483436U/en
Application granted granted Critical
Publication of CN202483436U publication Critical patent/CN202483436U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a non-cavern butting and communicating exploitation system, which comprises a target well and a communicating well, wherein a drill for tunneling towards the target well is arranged in the communicating well and is connected with a normal drill rod, an oblique step drill rod, an extra-heavy drill rod, a drilling jar, a wireless drilling inclinometer, a non-magnetic bearing drilling tool, a well drilling motor, a magnetic field signal emitter and a bit which are connected downwardly in sequence from the ground, wherein a magnetic field signal receiver is arranged in the target well at a target point position; a received magnetic field signal is transmitted to a magnetic field signal ground processor by the magnetic field signal receiver; a relative position signal of the bit and a target point is transmitted to a track measurement signal processor by the magnetic field signal ground processor; a bit track parameter signal is transmitted into the track measurement signal processor by the wireless drilling inclinometer; a target well target point coordinate and a bit position coordinate are provided to a bit control system for controlling tunneling direction of the bit by the track measurement signal processor. According to the system, accurate butting of the communicating well and the target well can be guaranteed without exploiting a cavern in advance for the target well.

Description

Do not have to dissolve the chamber mining system that is docked and connected
Technical field
The utility model relates to a kind of nothing and dissolves the chamber mining system that is docked and connected, and belongs to the mining activities technical field.
Background technology
On January 5th, 1994, publication number is the Chinese invention patent application of CN1080355, discloses a kind of quick-communicating method and device thereof of halogen-production vertical well; The quick-communicating method of this halogen-production vertical well gets out two mouthfuls of straight wells earlier in preset distance, until halite layer, the aperture is enlarged again; Outer tube of the adherent installation of difference in the straight well hole is installed pipe in more respectively in outer tube, feed the pressure clear water by interior pipe; Rock salt dissolving, the bittern of generation are discharged ground from outer tube again; At least be drilled with two mouthfuls of straight wells on ground, be connected with a vectored injection device in the bottom of interior pipe, the scale of the pipe lower end insertion straight well degree of depth in the expression and the sign of nozzle direction position are carved with in the top of interior pipe; The pipe degree of depth is consistent in control two, and when guaranteeing about two nozzles on the ejector relatively, employing water is attacked the vectored injection method; The borehole wall dissolves rapidly; Bittern is constantly discharged ground from outer tube, and the directed duct of formation is constantly impacted, and constantly extend in the duct; Interconnect until two extension ducts, become the counterpart well of connection; For the straight well more than two mouthfuls, can adopt mode of communicating one by one, also can be communicated with into the counterpart well earlier respectively, then, being communicated with adjacent counterpart well becomes the many wells of counterpart again.This technology is only applicable to straight well, forms that production capacity needs for a long time and yield is limited.
On January 19th, 2000, publication number is the Chinese invention patent application of CN1241676, discloses a kind of mirabilite exploiting water-dissolution process with two wells communicated by horizontal hole; The mining system that is docked and connected comprises target well and connected well; Be provided with the rig to target well driving in the connected well, rig faces down from ground and is connected with common drilling rod, sloping platform rank drilling rod, first heavy weight drill pipe, drilling jar, second heavy weight drill pipe, no magnetic pressure-bearing drilling tool, drill motor and drill bit in turn, and this mining system that is docked and connected is the dock difficulty of reduction connected well with the target well; The target well needs in advance, and exploitation forms bigger molten chamber; To realize connection, it is long to form the production capacity time to molten chamber driving for drill bit, and the effective coefficient of mining of mineral reserve is low; And cost is high slightly; The initial stage exploitation has certain influence to environment, even it is bigger to dissolve the diameter in chamber, the success rate that connected well docks with the target well is still not high.
The utility model content
The purpose of the utility model is, overcomes the problem that exists in the prior art, provides a kind of nothing to dissolve the chamber mining system that is docked and connected, need not to exploit in advance to form and dissolve the chamber, connected well and target well dock the success rate height.
For solving above technical problem; The nothing of the utility model is dissolved the chamber mining system that is docked and connected; Comprise target well and connected well; Be provided with rig in the said connected well to said target well driving; Said rig faces down from ground and is connected with common drilling rod, sloping platform rank drilling rod, first heavy weight drill pipe, drilling jar, second heavy weight drill pipe, no magnetic pressure-bearing drilling tool, drill motor and drill bit in turn; The wireless drilling inclinometers of measuring the bit course parameter is installed between said second heavy weight drill pipe and the said no magnetic pressure-bearing drilling tool, the field signal transmitter of emission field signal is installed between said drill motor and the said drill bit, be positioned at target position in the said target well and be provided with the field signal receiver that receives field signal; The input of field signal floor treatment appearance delivered to the field signal that receives by said field signal receiver; The output of said field signal floor treatment appearance inserts the first input end of trajectory measurement signal processing instrument and drill bit and target spot relative position signal is delivered to trajectory measurement signal processing instrument; Said wireless drilling inclinometers is sent the bit course parameter signal into second input of said trajectory measurement signal processing instrument, the drill bit control system of the output Access Control drill bit tunneling direction of said trajectory measurement signal processing instrument and with offering drill bit control system behind target well target coordinate and the bit location coordinate.
With respect to prior art; The utility model has been obtained following beneficial effect: the drill bit rear is equipped with field signal transmitter and wireless drilling inclinometers; In target well target spot tunneling process, wireless drilling inclinometers offers trajectory measurement signal processing instrument with the bit course parameter signal on the one hand at drill bit; The field signal transmitter that is positioned at the drill bit rear on the other hand constantly sends field signal; The field signal receiver that is positioned at target well point of impact on target position receives this field signal and it is delivered to field signal floor treatment appearance, and field signal floor treatment appearance parses drill bit and target spot relative position signal offers trajectory measurement signal processing instrument; Trajectory measurement signal processing instrument calculates target well target coordinate and bit location coordinate according to drill bit and target spot relative position signal and bit course parameter signal; And offer drill bit control system; Drill bit control system control drill bit accurately tunnels to the target spot of target well; This system need not the target well and exploits molten chamber in advance, just can guarantee that connected well docks with the accurate of target well.
Description of drawings
Fig. 1 is the be docked and connected structural representation of mining system of molten chamber for the utility model does not have.
Fig. 2 is the be docked and connected schematic diagram of mining system of molten chamber for the utility model does not have.
Among the figure: 1 crane, 2 engineering winches, 3 connected well rigs, 4 common drilling rods, 5 sloping platform rank drilling rods, 6 first heavy weight drill pipes, 7 drilling jars, 8 second heavy weight drill pipes, 9 wireless drilling inclinometers, 10 no magnetic pressure-bearing drilling tools, 11 drill motor, 12 field signal transmitters, 13 drill bits, 14 field signal receivers, 15 field signal floor treatment appearance, 16 trajectory measurement signal processing instruments, 17 drill bits control system.
The specific embodiment
As shown in Figure 1; The nothing of the utility model is dissolved the chamber mining system that is docked and connected; Comprise target well and connected well; Be provided with connected well rig 3 in the connected well to target well driving; Connected well rig 3 faces down from ground and is connected with common drilling rod 4, sloping platform rank drilling rod 5, first heavy weight drill pipe 6, drilling jar 7, second heavy weight drill pipe 8, wireless drilling inclinometers 9, no magnetic pressure-bearing drilling tool 10, drill motor 11, field signal transmitter 12 and drill bit 13 in turn, be positioned at target position in the target well and be provided with the field signal receiver 14 that receives field signal, field signal receiver 14 through crane 1 and engineering winch 2 times to target position.
As shown in Figure 2; The input of field signal floor treatment appearance 15 delivered to the field signal that receives by field signal receiver 14; The output of field signal floor treatment appearance 15 inserts the first input end of trajectory measurement signal processing instrument 16 and drill bit and target spot relative position signal is delivered to trajectory measurement signal processing instrument 16; Wireless drilling inclinometers 9 is sent the bit course parameter signal into second input of trajectory measurement signal processing instrument 16, the drill bit control system 17 of the output Access Control drill bit tunneling direction of trajectory measurement signal processing instrument 16 and with offering drill bit control system 17 behind target well target coordinate and the bit location coordinate.
In the work, in target well target spot tunneling process, wireless drilling inclinometers 9 offers trajectory measurement signal processing instrument 16 with the bit course parameter signal on the one hand at drill bit 13; The field signal transmitter 12 that is positioned at the drill bit rear on the other hand constantly sends field signal; The field signal receiver 14 that is positioned at target well point of impact on target position receives this field signal and it is delivered to field signal floor treatment appearance 15, and field signal floor treatment appearance 15 parses drill bit and target spot relative position signal offers trajectory measurement signal processing instrument 16; Trajectory measurement signal processing instrument 16 calculates target well target coordinate and bit location coordinate according to drill bit and target spot relative position signal and bit course parameter signal; And offering drill bit control system 17, drill bit control system 17 control drill bits 13 accurately tunnel to the target spot of target well.
Except that the foregoing description, the utility model can also have other embodiments.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop in the protection domain of the utility model requirement.

Claims (1)

1. one kind do not have to dissolve the chamber mining system that is docked and connected; Comprise target well and connected well; Be provided with rig in the said connected well to said target well driving; Said rig faces down from ground and is connected with common drilling rod, sloping platform rank drilling rod, first heavy weight drill pipe, drilling jar, second heavy weight drill pipe, no magnetic pressure-bearing drilling tool, drill motor and drill bit in turn; It is characterized in that: the wireless drilling inclinometers of measuring the bit course parameter is installed between said second heavy weight drill pipe and the said no magnetic pressure-bearing drilling tool; The field signal transmitter of emission field signal is installed between said drill motor and the said drill bit, is positioned at target position in the said target well and is provided with the field signal receiver that receives field signal; The input of field signal floor treatment appearance delivered to the field signal that receives by said field signal receiver; The output of said field signal floor treatment appearance inserts the first input end of trajectory measurement signal processing instrument and drill bit and target spot relative position signal is delivered to trajectory measurement signal processing instrument; Said wireless drilling inclinometers is sent the bit course parameter signal into second input of said trajectory measurement signal processing instrument, the drill bit control system of the output Access Control drill bit tunneling direction of said trajectory measurement signal processing instrument and with offering drill bit control system behind target well target coordinate and the bit location coordinate.
CN2012200999159U 2012-03-16 2012-03-16 Non-cavern butting and communicating exploitation system Expired - Lifetime CN202483436U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200999159U CN202483436U (en) 2012-03-16 2012-03-16 Non-cavern butting and communicating exploitation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200999159U CN202483436U (en) 2012-03-16 2012-03-16 Non-cavern butting and communicating exploitation system

Publications (1)

Publication Number Publication Date
CN202483436U true CN202483436U (en) 2012-10-10

Family

ID=46957863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200999159U Expired - Lifetime CN202483436U (en) 2012-03-16 2012-03-16 Non-cavern butting and communicating exploitation system

Country Status (1)

Country Link
CN (1) CN202483436U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104747170A (en) * 2015-01-20 2015-07-01 中天启明石油技术有限公司 Magnetic positioning method for determining position of target point of drilling well

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104747170A (en) * 2015-01-20 2015-07-01 中天启明石油技术有限公司 Magnetic positioning method for determining position of target point of drilling well
CN104747170B (en) * 2015-01-20 2017-06-20 中天启明石油技术有限公司 A kind of magnetic positioning method for determining positive drilling well point of impact on target position

Similar Documents

Publication Publication Date Title
CN105113987B (en) Interbedding of soft and hard rocks coal seam concordant measurement while drilling directional drilling equipment and its construction method
CN110607989B (en) Rock drilling trolley and tunnel tunneling construction method for reducing surrounding rock disturbance
CN105064919A (en) Ultra-short-radius radial lateral drilling method for horizontal wells
CN104879163A (en) Downhole small advance orientation exploration water discharging device and method
CN106761750B (en) Slot type recovery method is built in the longwell plane milling of half-edge coal seam longitudinal direction
CN103321575A (en) Coal seam top/bottom plate penetrating-hole short-radius deflecting rotary drilling process
CN105525870A (en) Drill jumbo
CN103277037A (en) Pipe pile leading-hole construction method under boulder cluster geological condition
CN204139961U (en) The rock drill that a kind of degree of depth can be surveyed
CN202483436U (en) Non-cavern butting and communicating exploitation system
CN204266925U (en) A kind of coal mine roadway rock-reinforcing anti-collapse hole drill head
CN106968686A (en) A kind of pipe shed construction method
CN104074516B (en) A kind of brill formula coal-winning machine filling drill bit
CN106483197A (en) A kind of Floor Heave in Roadway sorting technique based on original position sonic test
CN113338921A (en) Shale oil horizontal well track control method
WO2013062871A2 (en) Horizontal borehole mining system and method
CN205778536U (en) A kind of drilling in coal anti-blocking instrument of jet deslagging
Danilov et al. Justification of basic diagrams of horizontal drilling deflectors
CN107461208B (en) A kind of contact pipeline well and construction method on inclined orebody
CN108316856B (en) Strengthen cherry coal rock intensity drilling method and drilling tool step by step
CN203271589U (en) Controlled directional drilling guide system
CN110984878A (en) Rope coring drilling device for urban deep-buried tunnel exploration hole
CN203347720U (en) Intelligent well logging smoothing machine
CN202483547U (en) Well completion structure of water-dissolving method mine combination well
CN103452473B (en) One utilizes tunneling boring high counterweight drill bit device to carry out small-diameter deep well construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SINOPEC OILFIELD SERVICE CORPORATION

Free format text: FORMER OWNER: SINOPEC GROUP

Effective date: 20150906

Free format text: FORMER OWNER: JIANGSU OIL EXPLORATION CORPORATION OF SINOPEC

Effective date: 20150906

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150906

Address after: 100029 Beijing Chaoyang District Hui Xin a No. twelve layer 6

Patentee after: SINOPEC OILFIELD SERVICE CORPORATION

Address before: Jiangsu province Yangzhou City Wenhui Road 225009 No. 1

Patentee before: China Petrochemical Group Corp.

Patentee before: Jiangsu Oil Exploration Corporation of Sinopec

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20121010