CN202465113U - Shipbuilding gantry crane - Google Patents

Shipbuilding gantry crane Download PDF

Info

Publication number
CN202465113U
CN202465113U CN2012200590626U CN201220059062U CN202465113U CN 202465113 U CN202465113 U CN 202465113U CN 2012200590626 U CN2012200590626 U CN 2012200590626U CN 201220059062 U CN201220059062 U CN 201220059062U CN 202465113 U CN202465113 U CN 202465113U
Authority
CN
China
Prior art keywords
crane
gantry crane
crossbeam
bottom girder
trolley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200590626U
Other languages
Chinese (zh)
Inventor
胡相兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2012200590626U priority Critical patent/CN202465113U/en
Application granted granted Critical
Publication of CN202465113U publication Critical patent/CN202465113U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The utility model relates to a crane, in particular to a shipbuilding gantry crane, and mainly solves the technical problems that the crane is complex in structure, low in strength, high in production cost and difficult in assembly, construction and maintenance and the like in the prior art. The shipbuilding gantry crane comprises a bottom beam (1), and is characterized in that two pairs of supporting legs (2) are erected on the bottom beam (1); the upper ends of the supporting legs are connected with a crossbeam (3); a primary trolley (4) and a secondary trolley (5) are connected to the crossbeam through a guide rail in a sliding mode; the bottom of the secondary trolley is connected with an electric hoist (6); the upper part of the primary trolley is provided with a rotatable lifting arm (7); a main lifting hook device (8) is connected to the lifting arm in a sliding mode; and the lower part of the bottom beam is provided with cart traveling mechanisms (9).

Description

A kind of ship-building gantry crane
Technical field
The utility model relates to a kind of hoisting crane, especially relates to a kind of ship-building gantry crane.
Background technology
Weight-lifting equipment is divided into transfer crane, crane in bridge type, beam crane and boom crane by device structure; Wherein transfer crane mainly representative equipment be gauntry crane; Crane in bridge type mainly representative equipment is the bridge formation machine, and boom crane mainly representative equipment is a tower crane.Transfer crane is mainly used in work operations such as the up-down, parallel motion of building ground, factory floor and shipyard harbour weight.Transfer crane mainly is made up of lifting overhead traveling crane, girder, supporting leg, traveling gear and electric hydraulic system.Its principle of work is: utilize the lifting overhead traveling crane that is installed on the girder that weight is raised up; The supporting leg upper end connects girder; The lower end connects with traveling gear, through being installed in the driving of motor on the traveling gear, realizes the effect that hoisting crane moves on rail; The overhead traveling crane of lifting simultaneously also can be walked on girder, realizes at last weight is hung the effect that moves on to another place from a place.But the structure of these hoisting cranes is comparatively complicated, and intensity is relatively poor, and productive costs is higher, and assembling is built, keeps in repair also comparatively difficult.
The utility model content
The utility model provides a kind of ship-building gantry crane, and it mainly is that to solve the structure of existing in prior technology hoisting crane comparatively complicated, and intensity is relatively poor, and productive costs is higher, and the technical matters that also comparatively is difficult for etc. is built, keeped in repair in assembling.
The above-mentioned technical matters of the utility model mainly is able to solve through following technical proposals:
A kind of ship-building gantry crane of the utility model comprises bottom girder, and described bottom girder is put on the shelf and is provided with two pairs of supporting legs; The supporting leg upper end is connected with crossbeam; Slidely connect main carriage and secondary dolly through guide rail on the crossbeam, secondary dolly bottom is connected with electric block, and main carriage top is provided with rotating arm; Slidely connect main cargo hook gear on the arm, the bottom girder bottom is provided with cart walking mechanism.
As preferably, be provided with folder rail anchoring device in the middle part of the described bottom girder.
Therefore, the utility model is relatively simple for structure, and intensity is stronger, and the assembling, the maintenance all more or less freely, productive costs is lower.
Description of drawings
Accompanying drawing 1 is a kind of structural representation of the utility model.
The specific embodiment
Pass through embodiment below, and combine accompanying drawing, do further bright specifically the technical scheme of the utility model.
Embodiment: a kind of ship-building gantry crane of this example like Fig. 1, comprises bottom girder 1; Bottom girder is put on the shelf and is provided with two pairs of supporting legs 2, and the supporting leg upper end is connected with crossbeam 3, slidely connects main carriage 4 and secondary dolly 5 through guide rail on the crossbeam; Secondary dolly bottom is connected with electric block 6; Main carriage top is provided with rotating arm 7, slidely connects main cargo hook gear 8 on the arm, and the bottom girder bottom is provided with cart walking mechanism 9.The bottom girder middle part is provided with folder rail anchoring device 10.
The above is merely the specific embodiment of the utility model; But the architectural feature of the utility model is not limited thereto; Any those skilled in the art is in the field of the utility model, and variation of being done or modification all are encompassed among the claim of the utility model.

Claims (2)

1. a ship-building gantry crane comprises bottom girder (1), it is characterized in that described bottom girder (1) is put on the shelf to be provided with two pairs of supporting legs (2); The supporting leg upper end is connected with crossbeam (3); Slidely connect main carriage (4) and secondary dolly (5) through guide rail on the crossbeam, secondary dolly bottom is connected with electric block (6), and main carriage top is provided with rotating arm (7); Slidely connect main cargo hook gear (8) on the arm, the bottom girder bottom is provided with cart walking mechanism (9).
2. a kind of ship-building gantry crane according to claim 1 is characterized in that described bottom girder (1) middle part is provided with folder rail anchoring device (10).
CN2012200590626U 2012-02-21 2012-02-21 Shipbuilding gantry crane Expired - Fee Related CN202465113U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200590626U CN202465113U (en) 2012-02-21 2012-02-21 Shipbuilding gantry crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200590626U CN202465113U (en) 2012-02-21 2012-02-21 Shipbuilding gantry crane

Publications (1)

Publication Number Publication Date
CN202465113U true CN202465113U (en) 2012-10-03

Family

ID=46913293

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200590626U Expired - Fee Related CN202465113U (en) 2012-02-21 2012-02-21 Shipbuilding gantry crane

Country Status (1)

Country Link
CN (1) CN202465113U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108423561A (en) * 2018-04-02 2018-08-21 段中华 Container crane

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108423561A (en) * 2018-04-02 2018-08-21 段中华 Container crane
CN108423561B (en) * 2018-04-02 2024-03-15 段中华 Container crane

Similar Documents

Publication Publication Date Title
CN202465099U (en) Single-girder partial hanging gantry crane
CN202542703U (en) Electric signal beam crane
CN202429920U (en) Multi-trolley and double-girder gantry crane
CN202449763U (en) Simple pneumatic crane
CN202440231U (en) Gantry crane lifting hook device
CN202465109U (en) Motor-driven double-beam grab bucket gantry crane
CN202465110U (en) Shipbuilding portal crane with rail clamping device
CN202465121U (en) Suspension arm of crane
CN202449757U (en) Motor-driven single-beam suspending crane
CN202465100U (en) Single-beam gantry crane with double V-shaped supporting legs
CN202465073U (en) Crane traveling mechanism
CN202390106U (en) Lifting hook portal crane easy to maintain
CN202465102U (en) Double-trolley rotary electromagnetic overhead crane with carrier-beam
CN202465113U (en) Shipbuilding gantry crane
CN202465115U (en) Double main beam gantry crane
CN202465103U (en) Bridge crane with rotary clamp
CN202465098U (en) Single-beam gantry crane with V-shaped support legs
CN202429913U (en) Movable crane
CN202429891U (en) Crane hook device
CN202449760U (en) Container portal crane with rails
CN202429915U (en) Large-tonnage lifting hook overhead crane
CN202465117U (en) Suspending arm of crane
CN202465114U (en) Easily maintainable large-sized ship building gantry crane
CN202465111U (en) Large shipbuilding gantry crane with anemobiagraph
CN202492296U (en) Spinning electromagnetic suspension beam bridge crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121003

Termination date: 20130221