CN202452846U - Sealing device between trolley and upper sealing cover - Google Patents

Sealing device between trolley and upper sealing cover Download PDF

Info

Publication number
CN202452846U
CN202452846U CN2011205564873U CN201120556487U CN202452846U CN 202452846 U CN202452846 U CN 202452846U CN 2011205564873 U CN2011205564873 U CN 2011205564873U CN 201120556487 U CN201120556487 U CN 201120556487U CN 202452846 U CN202452846 U CN 202452846U
Authority
CN
China
Prior art keywords
water
trolley
sealing device
baffle plate
seal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011205564873U
Other languages
Chinese (zh)
Inventor
杨懿
陈巍
方会斌
李宝东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinosteel Anshan Research Institute of Thermo Energy Co Ltd
Original Assignee
Sinosteel Anshan Research Institute of Thermo Energy Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinosteel Anshan Research Institute of Thermo Energy Co Ltd filed Critical Sinosteel Anshan Research Institute of Thermo Energy Co Ltd
Priority to CN2011205564873U priority Critical patent/CN202452846U/en
Application granted granted Critical
Publication of CN202452846U publication Critical patent/CN202452846U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Filtering Materials (AREA)

Abstract

The utility model relates to the field of sinter coolers, in particular to a sealing device between a trolley and an upper sealing cover. The sealing device is characterized by comprising an upper enclosure plate, a water baffle plate and a flow water seal, wherein one end of the upper enclosure plate is connected with the lower edge of the upper sealing cover; the other end of the upper enclosure plate is bent to form a groove body; the flow water seal is arranged in the groove body; the height H between the bottom of the groove body and the upper edge of the trolley is 150 to 300 mm; one end of the water baffle plate is connected with the upper edge of the trolley; the other end of the water baffle plate is bent downward to extend into the flow water seal of the groove body; a water inlet pipe and a water outlet pipe are arranged on the groove body; and the water outlet pipe is connected with the water inlet pipe through a circulating water treatment system. Compared with the prior art, the sealing device between the trolley and the upper sealing cover has the advantages that the structure of an original sinter cooler cannot be influenced, the system is reliable, the sealing degree is high, the sealing requirement between the trolley and the upper sealing cover can be fully met, simultaneously the sealing device is convenient to install and easy to maintain and can be assembled and disassembled quickly, the working principle is simple, equipment components are less, and maintenance can be realized without halt.

Description

Sealing device between chassis and the last seal closure
Technical field
The utility model relates to the sinter cooler field, relates in particular to the sealing device between a kind of chassis and the last seal closure.
Background technology
At present; Sintering deposit burns till the back and gets into cooler on sintering machine; That cooler is with is cold, the ring is cold, three kinds of coolings on the machine, and the above two cooling means mainly are to adopt the air blast cooling, and the hot ore deposit temperature of this moment has 700-800 ℃; Under the effect of air blast or air-introduced machine, make cold air pass hot ore bed hot ore deposit is cooled off behind the entering cooler.There is 1-3 seal closure the charging chassis top of general belt-cooling machine, central cooler, and the waste gas in heat of cooling ore deposit gathers through the chimney emptying through seal closure.
Owing to assembly precision and equipment temperature distortion reason; Have the gap between general chassis and the last seal closure, less clearance has 10-20mm, and bigger gap reaches more than the 100mm; Like this under the not smooth situation of chimney emission; Form pressure-fired in the petticoat pipe, a large amount of flue dust directly is discharged on the sinter cooler scope of operation through the gap, and operating environment is sharply worsened.
Popularization along with the energy-saving and emission-reduction project; Increasing sintering machine waste heat project has been equipped with the cooler hot air circulating system; Through air-introduced machine 350 ℃ hot blast in the cooler seal closure is extracted to the machine the thermal source as waste heat boiler; To utilize remaining about the 150 ℃ low-quality hot blast in back to rouse go back to bellows continuation heat of cooling ore deposit under the cooler again, thereby improve the temperature of boiler inlet hot blast, make it to reach 410 ℃ nearly.Because the gap between sinter cooler and the last seal closure exists; When the negative pressure that in the air-introduced machine exhausting, forms reaches 100Pa; A large amount of cold wind sees through the gap and gets into seal closure; With the flue-gas temperature that greatly reduces the waste heat boiler import after high-temperature flue gas mixes, have a strong impact on the steam production and the quality of waste heat boiler.
The sintering machine cooler is higher at the bellows blast of pallet bottom; Reach 3000-4000Pa; Therefore between chassis and bellows, generally all be provided with sealing device, but between chassis upper limb and last seal closure, do not adopt sealing device, also have the sintering machine of minority supporting steel disc or rubber seal; Steel disc is owing to be to be rigidly connected, and the leakage of flue gas is more serious.And rubber seal sealing effectiveness when just using is better, but after long work, receives the high temperature melting rubber part damaged, needs often to change, and can only when parking maintenance, carry out owing to changing, so can't fundamentally solve sealing problem.
Summary of the invention
The purpose of the utility model is the defective that exists to prior art, and the sealing device between a kind of chassis and the last seal closure is provided, and satisfies the seal request between chassis and the last seal closure, uses reliable, easy for installation, for ease of maintenaince simultaneously.
The technical scheme summary of the utility model:
Sealing device between chassis and the last seal closure; Comprise coaming plate, water proof baffle plate and mobile water seal, an end of last coaming plate links to each other with last seal closure lower edge, and the other end of last coaming plate bends to cell body; Be provided with mobile water seal in the cell body, it is 150-300mm that said cell body bottom is lower than chassis upper edge H; One end of said water proof baffle plate is connected with the chassis upper edge, and the other end of water proof baffle plate bending downwards stretches in the mobile water seal of cell body; Said cell body is provided with water inlet pipe and drainpipe, and drainpipe links to each other with water inlet pipe through circular water treating system.
Said circular water treating system comprises that sedimentation basin, filter, cistern, water pump link to each other successively, filter and filter sand cleaning device, and cistern links to each other with filling pipe, and drainpipe links to each other with sedimentation basin, and water pump links to each other with water inlet pipe.
Compared with prior art, the beneficial effect of the utility model is: do not influence the structure of original sinter cooler, system is reliable; Seal degree is higher, can satisfy the seal request between chassis and the last seal closure fully, and is simultaneously easy for installation, for ease of maintenaince; But Fast Installation and dismounting; Operation principle is simple, and part of appliance is less, can realize the maintenance that do not stop production.
Description of drawings
Fig. 1 is the utility model example structure sketch map.
Fig. 2 is the utility model embodiment circular water treating system structural representation.
Among the figure: the mobile water seal 4-of the last coaming plate 2-of 1-water proof baffle plate 3-goes up seal closure 5-chassis
The specific embodiment
Be described further below in conjunction with the specific embodiment of accompanying drawing the utility model:
See Fig. 1; It is the sealing device example structure sketch map between the utility model chassis and the last seal closure; Comprise coaming plate 1, water proof baffle plate 2 and mobile water seal 3, an end of last coaming plate 1 links to each other with last seal closure 4 lower edges, and the other end of last coaming plate 1 bends to cell body; Be provided with the water seal 3 of flowing in the cell body, it is 150-300mm that the cell body bottom is lower than chassis 5 upper edge H; One end of water proof baffle plate 2 is connected with chassis 5 upper edges, and the other end of water proof baffle plate 2 bending downwards stretches in the mobile water seal 3 of cell body; Cell body is provided with water inlet pipe and drainpipe, and drainpipe links to each other with water inlet pipe through circular water treating system.Adopt the water source that flows as sealing medium among the embodiment, guarantee sealing effectiveness.
See Fig. 2, circular water treating system comprises that sedimentation basin, filter, cistern, water pump link to each other successively, filter and filter sand cleaning device, and cistern links to each other with filling pipe, and drainpipe links to each other with sedimentation basin, and water pump links to each other with water inlet pipe.Circular water treating system adopts the mode of quantitative water compensating, the recirculated water after the purification is injected to go up by water inlet pipe through water pump form the sealing water level in coaming plate 1 cell body, and water process drainpipe flows into the sedimentation basin below the sinter cooler, through the decontamination cycle utilization.

Claims (2)

1. the sealing device between chassis and the last seal closure; It is characterized in that; Comprise coaming plate, water proof baffle plate and mobile water seal, an end of last coaming plate links to each other with last seal closure lower edge, and the other end of last coaming plate bends to cell body; Be provided with mobile water seal in the cell body, it is 150-300mm that said cell body bottom is lower than chassis upper edge H; One end of said water proof baffle plate is connected with the chassis upper edge, and the other end of water proof baffle plate bending downwards stretches in the mobile water seal of cell body; Said cell body is provided with water inlet pipe and drainpipe, and drainpipe links to each other with water inlet pipe through circular water treating system.
2. the sealing device between chassis according to claim 1 and the last seal closure; It is characterized in that; Said circular water treating system comprises that sedimentation basin, filter, cistern, water pump link to each other successively, filter and filter sand cleaning device, and cistern links to each other with filling pipe; Drainpipe links to each other with sedimentation basin, and water pump links to each other with water inlet pipe.
CN2011205564873U 2011-12-27 2011-12-27 Sealing device between trolley and upper sealing cover Expired - Lifetime CN202452846U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205564873U CN202452846U (en) 2011-12-27 2011-12-27 Sealing device between trolley and upper sealing cover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205564873U CN202452846U (en) 2011-12-27 2011-12-27 Sealing device between trolley and upper sealing cover

Publications (1)

Publication Number Publication Date
CN202452846U true CN202452846U (en) 2012-09-26

Family

ID=46868705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205564873U Expired - Lifetime CN202452846U (en) 2011-12-27 2011-12-27 Sealing device between trolley and upper sealing cover

Country Status (1)

Country Link
CN (1) CN202452846U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103307888A (en) * 2013-06-21 2013-09-18 江苏华能冶金工程技术有限公司 Water-seal self-deashing circular cooler
CN104864714A (en) * 2015-06-09 2015-08-26 马春强 Secondary water-seal movable hot air sintering and sealing device of sintering machine
CN109813126A (en) * 2019-03-21 2019-05-28 南京飞达机械有限公司 A kind of sealing device for annular cooling machine
CN115029161A (en) * 2022-08-10 2022-09-09 山西阳煤化工机械(集团)有限公司 Gasification furnace and sealing structure

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103307888A (en) * 2013-06-21 2013-09-18 江苏华能冶金工程技术有限公司 Water-seal self-deashing circular cooler
CN103307888B (en) * 2013-06-21 2015-03-18 江苏华能冶金工程技术有限公司 Water-seal self-deashing circular cooler
CN104864714A (en) * 2015-06-09 2015-08-26 马春强 Secondary water-seal movable hot air sintering and sealing device of sintering machine
CN109813126A (en) * 2019-03-21 2019-05-28 南京飞达机械有限公司 A kind of sealing device for annular cooling machine
CN109813126B (en) * 2019-03-21 2024-03-29 南京飞达机械有限公司 Sealing device for ring cooler
CN115029161A (en) * 2022-08-10 2022-09-09 山西阳煤化工机械(集团)有限公司 Gasification furnace and sealing structure
CN115029161B (en) * 2022-08-10 2022-11-01 山西阳煤化工机械(集团)有限公司 Gasification furnace and sealing structure

Similar Documents

Publication Publication Date Title
CN202452846U (en) Sealing device between trolley and upper sealing cover
CN104315896A (en) Detachable heat exchanger for blast furnace slag flushing water
CN204625665U (en) Blast furnace slag quenching water waste heat recycling heating installation
CN202141332U (en) Sealing device of sintering circular cooler
CN202182646U (en) Flexible sealing device for upper gas hood of ring cooling machine
CN203501201U (en) Afterheat recovery energy-saving device suitable for boiler chimney and chimney comprising t afterheat recovery energy-saving device
CN202297462U (en) Coke dry quenching gas circulating device
CN202300990U (en) Bin pump heat insulation device
CN204268929U (en) A kind of detachable heat exchanger for blast furnace slag quenching water
CN104894310A (en) Blast furnace slag-flushing waste heat recovery steam-flue gas heat exchange technology
CN206018965U (en) A kind of industrial hot water boiler
CN209689465U (en) A kind of heat collector mounting device of catalytic cracking flue gas heat exchange
CN107651826B (en) Purification device is collected in float bath polluted gas water conservancy diversion
CN202339127U (en) Air type thermal tube type afterheat recycling heat exchanger
CN201497398U (en) High-efficiency automatic dust-removing heat exchanger
CN201373679Y (en) High-efficient and clean gas cooling device
CN202973125U (en) Adjustable air-scavenging and slag-discharging control system for boiler
CN103968674A (en) Medium and low temperature smoke online pre-ash-removal device of rotary hearth furnace
CN2811902Y (en) Dry type seal device for moveable apron of rotary furnace
CN204923918U (en) Lime kiln gas gas heater
CN203443373U (en) Controllable hot-blast air recycling sintering machine
CN203586847U (en) Waste heat utilization device used for smoke in large flue of sintering machine
CN202153012U (en) Steam smoke heater
CN102927565A (en) Ash discharge cooling device of circulating fluidized bed boiler
CN201368467Y (en) Regenerative smoke cooler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120926