CN202450505U - 溶岩地区的基础处理系统 - Google Patents

溶岩地区的基础处理系统 Download PDF

Info

Publication number
CN202450505U
CN202450505U CN 201120553004 CN201120553004U CN202450505U CN 202450505 U CN202450505 U CN 202450505U CN 201120553004 CN201120553004 CN 201120553004 CN 201120553004 U CN201120553004 U CN 201120553004U CN 202450505 U CN202450505 U CN 202450505U
Authority
CN
China
Prior art keywords
pile
static pressure
layers
pressure pipe
lava
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120553004
Other languages
English (en)
Inventor
孙海涛
石伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Third Engineering Division
Original Assignee
First Construction Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Third Engineering Division filed Critical First Construction Co Ltd of China Construction Third Engineering Division
Priority to CN 201120553004 priority Critical patent/CN202450505U/zh
Application granted granted Critical
Publication of CN202450505U publication Critical patent/CN202450505U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型公开了一种溶岩地区的基础处理系统,其特征在于:包括基岩面、填充土体、旋喷桩及压密注浆处理层、静压管桩、褥垫层、砼垫层和结构筏板基础层;所述基岩面上边设有填充土体,填充土体上设置旋喷桩及压密注浆处理层,旋喷桩及压密注浆处理层上设置静压管桩,静压管桩上设有褥垫层,褥垫层上设有砼垫层,砼垫层上设置结构筏板基础层。所述旋喷桩及压密注浆处理层中压密注浆使用袖阀管注浆。所述每根静压管桩下均为一组格构式旋喷桩。本实用新型在基岩面以上设置稳定的持力层,从而达到安全、可控、降低工程成本及风险的目的。

Description

溶岩地区的基础处理系统
技术领域
本实用新型涉及一种溶岩地区的基础处理系统。
背景技术
我国溶岩地区面积广大,随着社会的发展,越来越多的道路、桥梁以及建筑工程的基础将遇会到溶洞地质。目前溶岩地区的桩基处理方式通常采用钻孔灌注桩,基础大多要穿越双层或多层溶洞,施工难度大,遇浅层土洞时甚至会发生,存在的问题以及不确定性较多,如卡钻、吊钻等,通常用于处理故障的时间多于钻孔时间。当遇到溶洞时砼流失严重,贯通的地下水也将带走部分浆液,桩身质量难以保证,常发生断桩、桩身不密实的的质量问题,同时砼的浇灌量也很不确定,个别工程的工程桩砼实际用量甚至高于正常用量的几倍。
实用新型内容
本实用新型所要解决的技术问题是提供一种溶岩地区的基础处理系统,解决了上述问题。
本实用新型所要解决的技术问题是通过以下技术方案来实现的:
一种溶岩地区的基础处理系统,其特征在于:包括基岩面、填充土体、旋喷桩及压密注浆处理层、静压管桩、褥垫层、砼垫层和结构筏板基础层;所述基岩面上边设有填充土体,填充土体上设置旋喷桩及压密注浆处理层,旋喷桩及压密注浆处理层上设置静压管桩,静压管桩上设有褥垫层,褥垫层上设有砼垫层,砼垫层上设置结构筏板基础层。
所述旋喷桩及压密注浆处理层中压密注浆使用袖阀管注浆。
所述每根静压管桩下均为一组格构式旋喷桩。
所述静压管桩内部填充C40微膨胀砼。
所述褥垫层采用中砂或碎石虚铺。
本实用新型的有益效果:
本实用新型在基岩面以上设置稳定的持力层,从而达到安全、可控、降低工程成本及风险的目的。采用格构式旋喷桩+压密注浆对对岩溶面及浅层、开口溶洞等危险地貌进行全封闭处理进行,有效控制岩溶、土洞风险,且杜绝土洞二次发育的通道,将旋喷桩完成面标高控制在基岩面以上某个标高,避开基岩面以下溶洞,旋喷桩以上施工静压桩及褥垫层,做成复合筏板基础,使桩基础及桩间土体协同工作,共同承担上部荷载。
附图说明
图1为本实用新型系统剖面示意图
图2为本实用新型旋喷桩和压密注浆平面示意图
图中,1-基岩面,2-填充土体,3-旋喷桩及压密注浆处理层,4-静压管桩,5-褥垫层,6-砼垫层,7-结构筏板基础层,8-压密注浆孔,9-格构式旋喷桩
具体实施方式
图1-2所示,一种溶岩地区的基础处理系统,其特征在于:包括基岩面、填充土体、旋喷桩及压密注浆处理层、静压管桩、褥垫层、砼垫层和结构筏板基础层;所述基岩面上边设有填充土体,填充土体上设置旋喷桩及压密注浆处理层,旋喷桩及压密注浆处理层上设置静压管桩,静压管桩上设有褥垫层,褥垫层上设有砼垫层,砼垫层上设置结构筏板基础层。
所述旋喷桩及压密注浆处理层中压密注浆使用袖阀管注浆;所述每根静压管桩下均为一组格构式旋喷桩。旋喷桩未覆盖区域使用压密注浆处理地基,压密注浆使用袖阀管,施工顺序为:钻压密注浆孔、浇灌套壳料、下袖阀管→下注浆管→灌浆。
所述静压管桩内部填充C40微膨胀砼,静压桩的施工需要待基础处理达到设计强度后方可施工,在经过处理后的基础上施工静压管桩可避免管桩遇不规则岩面而发生断桩,旋喷桩强度检测使用地质钻钻芯取样,取样后的空洞灌浆封堵。
所述褥垫层采用中砂或碎石虚铺,静压管桩截桩后桩顶平褥垫层底面,不伸入褥垫层内,以免褥垫层的有效计算厚度减小。静压管桩的施工需待处理后的基础达到设计强度后方可施工,一般采用钻芯检测,在旋喷桩的上中下各部位取样送到实验室做抗压试验,取样后的空洞灌浆封堵,为了尽快达到设计强度,水泥浆中可掺入早强剂或适当增加水泥用量,静压管桩内部填充C40微膨胀砼,使静压管桩与褥垫层更好的协同受力。

Claims (5)

1.一种溶岩地区的基础处理系统,其特征在于:包括基岩面、填充土体、旋喷桩及压密注浆处理层、静压管桩、褥垫层、砼垫层和结构筏板基础层;所述基岩面上边设有填充土体,填充土体上设置旋喷桩及压密注浆处理层,旋喷桩及压密注浆处理层上设置静压管桩,静压管桩上设有褥垫层,褥垫层上设有砼垫层,砼垫层上设置结构筏板基础层。
2.如权利要求1所述的溶岩地区的基础处理系统,其特征在于:所述旋喷桩及压密注浆处理层中压密注浆为袖阀管注浆。
3.如权利要求1所述的溶岩地区的基础处理系统,其特征在于:所述每根静压管桩下均为一组格构式旋喷桩。
4.如权利要求1所述的溶岩地区的基础处理系统,其特征在于:所述静压管桩内部填充C40微膨胀砼。
5.如权利要求1所述的溶岩地区的基础处理系统,其特征在于:所述褥垫层采用中砂或碎石虚铺。
CN 201120553004 2011-12-27 2011-12-27 溶岩地区的基础处理系统 Expired - Fee Related CN202450505U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120553004 CN202450505U (zh) 2011-12-27 2011-12-27 溶岩地区的基础处理系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120553004 CN202450505U (zh) 2011-12-27 2011-12-27 溶岩地区的基础处理系统

Publications (1)

Publication Number Publication Date
CN202450505U true CN202450505U (zh) 2012-09-26

Family

ID=46866376

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120553004 Expired - Fee Related CN202450505U (zh) 2011-12-27 2011-12-27 溶岩地区的基础处理系统

Country Status (1)

Country Link
CN (1) CN202450505U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102979087A (zh) * 2012-12-21 2013-03-20 中铁二局股份有限公司 一种旋挖桩施工方法
CN104631431A (zh) * 2014-12-29 2015-05-20 山东省建筑科学研究院 一种溶洞注浆加固结构
CN107700514A (zh) * 2017-03-08 2018-02-16 长江三峡勘测研究院有限公司(武汉) 一种关于软弱地基基础选择结构型式的处理方法
CN111576468A (zh) * 2019-02-15 2020-08-25 闫红民 一种防止地下埋管不均匀沉降的筏板基础及施工方法

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102979087A (zh) * 2012-12-21 2013-03-20 中铁二局股份有限公司 一种旋挖桩施工方法
CN102979087B (zh) * 2012-12-21 2015-05-20 中铁二局股份有限公司 一种旋挖桩施工方法
CN104631431A (zh) * 2014-12-29 2015-05-20 山东省建筑科学研究院 一种溶洞注浆加固结构
CN107700514A (zh) * 2017-03-08 2018-02-16 长江三峡勘测研究院有限公司(武汉) 一种关于软弱地基基础选择结构型式的处理方法
CN107700514B (zh) * 2017-03-08 2020-05-05 长江三峡勘测研究院有限公司(武汉) 一种关于软弱地基基础选择结构型式的处理方法
CN111576468A (zh) * 2019-02-15 2020-08-25 闫红民 一种防止地下埋管不均匀沉降的筏板基础及施工方法

Similar Documents

Publication Publication Date Title
CN102691296B (zh) 一种桩侧静压注浆桩底旋喷注浆的管桩基础及其施工方法
CN204112308U (zh) 一种基于大卵石、高渗透系数地层的简易袖阀注浆装置
CN103215960B (zh) 高聚物垂直支护体系注浆方法
CN102146679B (zh) 复杂地质地段土压平衡盾构通过中间风井施工方法
CN103422511B (zh) 一种复合式软土地基下输电杆塔浅埋基础地基加固方法
CN103924987B (zh) 一种smw工法桩盾构洞门防渗水结构及其施工方法
CN103437339A (zh) 岩溶地层地下连续墙槽壁附近溶洞封闭的施工方法
CN204370373U (zh) 一种水库封闭防渗帷幕结构
CN202450505U (zh) 溶岩地区的基础处理系统
CN202280426U (zh) 一种水泥土双向搅拌桩机的注水气钻头
CN205260041U (zh) 一种水平旋喷冻结法支护结构
CN114109394A (zh) 隧道浅埋软弱围岩高压旋喷桩法地表加固的桩长确定方法
CN202559368U (zh) 一种沉管隧道带帽钢管减沉桩结构
CN203796288U (zh) 一种smw工法桩盾构洞门防渗水结构
CN103498478B (zh) 岩石坝基帷幕灌浆施工方法
CN201771514U (zh) 一种带桩基础的暗挖隧道结构
CN204456058U (zh) 一种降低建筑基础沉降速率的施工结构
CN105040705A (zh) 多溶洞地质条件下地基基础处理施工工艺
CN105544597B (zh) 适用于潟湖相岛礁环境下的组合基础结构及其施工方法
CN111734448A (zh) 地下空间结构与盾构隧道间竖向通道加固的结构及方法
CN103437712A (zh) 一种适用于穿透圆砾层土质的三轴搅拌机钻头
CN206157726U (zh) 一种适用于沿海深厚吹填土地基处理的复合桩型结构
CN203583501U (zh) 一种抵抗岩体滑动的深层抗剪装置
CN202280067U (zh) 一种双壁混凝土沉井
CN206090520U (zh) 一种微生物固土护壁钻孔灌注桩

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120926

Termination date: 20201227