CN202447582U - Conveyer device for six-ton die forging production line of flange - Google Patents
Conveyer device for six-ton die forging production line of flange Download PDFInfo
- Publication number
- CN202447582U CN202447582U CN2011205795219U CN201120579521U CN202447582U CN 202447582 U CN202447582 U CN 202447582U CN 2011205795219 U CN2011205795219 U CN 2011205795219U CN 201120579521 U CN201120579521 U CN 201120579521U CN 202447582 U CN202447582 U CN 202447582U
- Authority
- CN
- China
- Prior art keywords
- flange
- production line
- die forging
- tons
- forging production
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to a conveyer device for a six-ton die forging production line of a flange. The device comprises a frame, and a conveying chain and a driving device are arranged on the frame, and are connected with each other. The device is simple in structure, convenient to operate, time-saving, labor-saving, energy-saving and high in working efficiency, and the whole forging steps are connected through the conveying chain.
Description
Technical field
The utility model relates to the transport in the flange forging process, specifically, relates to the flange transport in six tons of die forging production lines of a kind of flange.
Background technology
Forge in the process at flange; Especially in the whole operation that die forging is forged; Normally tick the flange blank, be carried to 2 tons of pneumatic hammer places by machinery operator by manual work, carry out base through 2 tons of pneumatic hammers after; Be carried to six tons of die forgings by forging type hammer out by machinery operator, be carried to 1000 tons of pressure bead cutter punchings through machinery operator again and cut edge.At last, be carried to tank and carry out solution treatment.The whole machining process process wastes time and energy and inefficiency owing to all operate with the operator of operating machine through manual pick.
The utility model content
The utility model forges the problems referred to above that exist in the process to existing flange, has proposed six tons of die forging production line conveying apparatus of flange of a kind of simple in structure, easy to operate, high efficiency.
The technical scheme of the utility model is: six tons of die forging production line conveying apparatus of a kind of flange, and this device comprises framework, and carrier chain and drive unit are installed on the framework, carrier chain is connected with drive unit.
Preferably, drive unit comprises motor and speed reducer, and motor is connected with reductor through belt, and reductor is connected with carrier chain.
Preferably, described base of frame is provided with the support of support frame.
The beneficial effect of the utility model is: the utility model is simple in structure, and is easy to operate, through carrier chain whole forging process coupled together, time saving and energy saving, energy savings, high efficiency.
Description of drawings
Accompanying drawing 1 is the structural representation of the utility model specific embodiment;
Accompanying drawing 2 is the face of the bowing structural representation of the utility model specific embodiment.
The specific embodiment
For structure, characteristic and other purpose that can further understand the utility model, combine accompanying drawing and appended embodiment to specify as follows at present, illustrated embodiment only is used to explain the technical scheme of the utility model, and non-limiting the utility model.
Six tons of die forging production line conveying apparatus of a kind of flange, this device comprises framework 1, framework 1 bottom is provided with the support 5 of support frame 1.Carrier chain 2 and drive unit are installed on the framework 1, and carrier chain 2 is connected with drive unit.Drive unit comprises motor 3 and reductor 4, and motor 3 is connected with reductor 4 through belt, and reductor 4 is connected with carrier chain 2.
During work, motor 2 drives reductor 4 work through belt, and reductor 4 drives carrier chain 2 and rotates; Power is provided for carrier chain 2, and after reductor 4 slowed down, the moment of torsion that offers carrier chain 2 was bigger; The flange forging is ticked the blank in the heating furnace in process, is placed on the carrier chain 2; Be delivered to 2 tons of pneumatic hammer bases, six tons of die hammer moulding and 1000 tons of pressure bead cutter punchings successively by carrier chain 2 and cut edge, be delivered to tank at last and carry out solution treatment, accomplish each forging process.
Claims (3)
1. six tons of die forging production line conveying apparatus of a flange, it is characterized in that: this device comprises framework (1), and carrier chain (2) and drive unit are installed on the framework (1), carrier chain (2) is connected with drive unit.
2. six tons of die forging production line conveying apparatus of flange as claimed in claim 1 is characterized in that: drive unit comprises motor (3) and reductor (4), and motor (3) is connected with reductor (4) through belt, and reductor (4) is connected with carrier chain (2).
3. like claim 1 or six tons of die forging production line conveying apparatus of 2 any described flanges, it is characterized in that: described framework (1) bottom is provided with the support (5) of support frame (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205795219U CN202447582U (en) | 2011-12-31 | 2011-12-31 | Conveyer device for six-ton die forging production line of flange |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205795219U CN202447582U (en) | 2011-12-31 | 2011-12-31 | Conveyer device for six-ton die forging production line of flange |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202447582U true CN202447582U (en) | 2012-09-26 |
Family
ID=46863476
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011205795219U Expired - Fee Related CN202447582U (en) | 2011-12-31 | 2011-12-31 | Conveyer device for six-ton die forging production line of flange |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202447582U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103909197A (en) * | 2013-01-07 | 2014-07-09 | 苏州昆仑重型装备制造有限公司 | Blank conveying device |
-
2011
- 2011-12-31 CN CN2011205795219U patent/CN202447582U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103909197A (en) * | 2013-01-07 | 2014-07-09 | 苏州昆仑重型装备制造有限公司 | Blank conveying device |
CN103909197B (en) * | 2013-01-07 | 2016-12-28 | 苏州昆仑重型装备制造有限公司 | Stock conveyer device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102861855B (en) | Automatic riveting device | |
CN203875888U (en) | Workpiece turn-over and transfer mechanism on stamping production line | |
CN202639243U (en) | Automatic box turnover machine | |
CN202219284U (en) | Multi-station continuous punching machine | |
CN202387911U (en) | Heavy-duty vehicle brake block riveting machine | |
CN203304436U (en) | Automatic feeding device of punching machine tool | |
CN202447582U (en) | Conveyer device for six-ton die forging production line of flange | |
CN202863790U (en) | Full-automatic metal strip welding packaging machine | |
CN202333038U (en) | Improved storage battery pole piece brushing machine | |
CN203574512U (en) | Efficient multi-station rotor sheet sorting machine | |
CN202943314U (en) | Cross hole machining device in steering gear valve body | |
CN202387793U (en) | Crimping machine for solar water heater tank | |
CN202824501U (en) | Automatic riveting equipment | |
CN201324990Y (en) | Elevator | |
CN103848192A (en) | Rotary lifting conveyor | |
CN103658288B (en) | Hardware & tools blanking device | |
CN203574510U (en) | Efficient multi-station stator sheet sorting machine | |
CN102699161B (en) | Workpiece rotating stamping die | |
CN202387918U (en) | Oil pressure riveting machine | |
CN204727157U (en) | A kind of C-type steel overturn conveying apparatus | |
CN102101150A (en) | Knife-net riveting rotary mechanism | |
CN203649096U (en) | Hardware tool discharge device and feed equipment special for hardware tool discharge device | |
CN202450120U (en) | Integrated solution treatment device of flange six-ton die forging production line | |
CN203156057U (en) | Material loading, feeding and discharging device in turning of oil pipe and oil sucker rod | |
CN103723493A (en) | Reversing feeding device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
DD01 | Delivery of document by public notice |
Addressee: Qingdao Hana Heavy Industry Co.,Ltd. Document name: Notification to Pay the Fees |
|
DD01 | Delivery of document by public notice |
Addressee: Qingdao Hana Heavy Industry Co.,Ltd. Document name: Notification of Termination of Patent Right |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120926 Termination date: 20141231 |
|
EXPY | Termination of patent right or utility model |