CN202441402U - Telescopic constant force yield anchor bolt for dynamic pressure soft rock roadway - Google Patents

Telescopic constant force yield anchor bolt for dynamic pressure soft rock roadway Download PDF

Info

Publication number
CN202441402U
CN202441402U CN2012200713611U CN201220071361U CN202441402U CN 202441402 U CN202441402 U CN 202441402U CN 2012200713611 U CN2012200713611 U CN 2012200713611U CN 201220071361 U CN201220071361 U CN 201220071361U CN 202441402 U CN202441402 U CN 202441402U
Authority
CN
China
Prior art keywords
anchor
constant force
tray
dynamic pressure
yield
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN2012200713611U
Other languages
Chinese (zh)
Inventor
王成军
沈豫浙
何涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui University of Science and Technology
Original Assignee
Anhui University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui University of Science and Technology filed Critical Anhui University of Science and Technology
Priority to CN2012200713611U priority Critical patent/CN202441402U/en
Application granted granted Critical
Publication of CN202441402U publication Critical patent/CN202441402U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a telescopic constant force yield anchor bolt for a dynamic pressure soft rock roadway. The telescopic constant force yield anchor bolt is composed of an anchor rod body, a tray, a pull rod, a pre-tightening adjusting bolt, a main spring, a pin shaft, a cutter-shaped cam, an auxiliary spring, an anchoring head framework, an idler wheel, an idler wheel frame and a nut. The anchor rod body is connected with the pull rod through threads, the tray can move along the pull rod under the action of external force, combining pre-tightening force generated by the main spring and the auxiliary spring on the tray in a moving process basically remains unchanged, and namely constant force is kept. When surrounding rock of the dynamic pressure soft rock roadway deforms, the tray can release stress through on-load moving yield. When pressure of the surrounding rock is released, the tray can return to secondarily reinforce the surrounding rock. When the surrounding rock deforms repeatedly due to stress disturbance, the anchor rod can repeatedly and flexibly support the surrounding rock in 'yield-support-yield' mode, and the roadway is prevented from being damaged. The telescopic constant force yield anchor bolt is ingenious in design, compact in structure and large in moving stroke of the tray. All parts except the anchor rod body can be dismounted and used repeatedly, so that cost is saved.

Description

The dynamic pressure soft-rock tunnel is with scalable constant force pressure-relieving achor bar
Technical field:
The utility model relates to underground engineering support device field, relates in particular to a kind of dynamic pressure soft-rock tunnel with scalable constant force pressure-relieving achor bar.
Background technology:
Along with the increase of the coal mining degree of depth, the soft rock problem is more and more serious, and the supporting difficult problem of dynamic pressure soft-rock tunnel is more and more outstanding.The dynamic pressure soft-rock tunnel has three characteristics: the one, and the residing rock mass circumstance complication of country rock, rock mass is weak, broken, loose, receives disturbing influence frequent; The 2nd, the physics and the mechanical property of country rock are special, and rock strength is low, weathering is serious, and rheological characteristic is big; The 3rd, the tunnel is pressed and is manifested strong and unstable, and the country rock initial stage presses soon, and deflection is big, and stable back country rock still continues large deformation with certain speed for a long time, and the stability of country rock is difficult to control.Therefore, the dynamic pressure soft-rock tunnel is often damaged, and need carry out special supporting.Existing dynamic pressure soft rock supporting mode commonly used mainly is divided into two types: one type is to use the overlapping fastener that adds of U shaped steel, makes the frame of frictional force.This steel frame is installed on the good tunnel of developing in advance, presses or distortional stress when surpassing frame and bearing frictional resistance when the tunnel, and equitant U shaped steel holds up slip, tends to balance after the preliminary release of country rock, and roadway surrounding rock is kept perfectly and stability thereby reach.It is big that but this support pattern consumes steel material, and labour intensity is high, and investment is many.Another kind of mode is to be master's serial support technology with the anchor spray, comprises anchor spray, the spray of anchor net, anchor and spray net frame, anchor notes, prestress anchorage cable supporting etc.Wherein, relatively low with anchor spray series technique cost, be the main mode of dynamic pressure soft rock supporting.But anchor sprays serial support pattern must use anchor pole.Situation, supporting resistance that existing anchor pole is difficult to adapt to the TERM DEFORMATION of dynamic pressure soft-rock tunnel are not enough, and the roadway deformation amount is big.The nut of anchor pole, screw thread, pallet, the body of rod and anchoring agent since these members and technology do not wait by force; Influenced by dynamic pressure when in the dynamic pressure soft-rock tunnel, using and cause screw thread stripped thread, pallet fragmentation or anchoring agent powerful not enough; Cause wall rock loosening; Inbreak and being damaged is produced and safety thereby influence is normal, and has increased the cost of development.
External extending anchor pole has the crooked undaform of the body of rod of the Thyssen type and the former Soviet Union, and such anchor pole constant-resistance working stage is unstable, can not accomplish the steady carrying of anchor pole, and the influence of pressing bigger with being hit." H type " that domestic most typical extending anchor pole mainly contains China Mining University reaches the extending anchor pole of " modified " body of rod; The extending anchor pole of " H type " and " modified "; The anchor pole afterbody machining and heat treatment have been carried out, higher intensity and the elongation per unit length that can bring into play anchor pole of afterbody intensity.Application number is that the patent of 96115683.X has proposed expansive soft rock equi-strength prop pressure-relieving achor bar always, and through changing the yield tensile ratio of anchor bar body round steel, the method for adjustment material makes anchor pole possess the performance that certain on-load extends.Application number is that 86208821 patent has proposed a kind of telescopic anchor pole; This anchor pole is made up of the head that does not move and afterbody, pad, spacers ring that can be certain; The head of anchor pole and afterbody are formed through interference fit, and the head of anchor pole and afterbody can produce relative displacement when country rock deforms.Yet that studies the above-mentioned extending anchor pole of confirmation increases resistance speed no more than the prior resin anchor pole, ought reach simultaneously after the yield strength of anchor pole; The supporting resistance of anchor pole descends rapidly, can not reach constant working resistance state, and lever strength is little; Complex structure is subject to disturbing influence, all can not adapt to the distortion of dynamic pressure soft-rock tunnel; The deformation energy of country rock can't be absorbed, " letting-Zhi " circulation can not be accomplished.
In addition; The Duan Changchen of Anhui University of Science and Technology and Zhang Xiangyang etc. propose a kind of mentality of designing of hydraulic pressure coupling anchor pole; The anchor pole of design is at the afterbody of common metal anchor pole a kind of regulatable hydraulic means to be installed; Make it and can form the circulation coupling of " preliminary bracing, rationally let pressure, secondary reinforcement ", and supporting monitoring device can be monitored in real time to roadway surrounding rock is stressed with country rock.But this anchor rod system needs pressure sensor and monitoring system, makes the supporting increase too high.
Summary of the invention:
The utility model technical problem to be solved; It is the deficiency that overcomes above-mentioned prior art; Provide a kind of dynamic pressure soft-rock tunnel with scalable constant force pressure-relieving achor bar; Be installed in pallet on the anchor pole and can realize when country rock deforms that big displacement on-load moves and let pressure,, avoid the tunnel to be damaged with the protection suspension device.
For realizing above-mentioned purpose; The technical scheme that the utility model adopts is following: a kind of dynamic pressure soft-rock tunnel is regulated bolt, main spring, bearing pin, cuitellate cam, auxilliary spring, anchorage head framework, roller, turning rolls and nut by anchor bar body, pallet, pull bar, pretension and is formed with scalable constant force pressure-relieving achor bar.Wherein, the afterbody of described anchor bar body is provided with external screw thread, and the head of pull bar is provided with internal thread, and anchor bar body is connected through screw thread with pull bar; Tray sleeve and is regulated bolt and nut is connected with the anchorage head framework through pretension on pull bar; Turning rolls is fixed on the afterbody of pull bar, and main spring is enclosed within on the pull bar, and between turning rolls and pallet; The axis of two relative pull bars of cuitellate cam is symmetric arrangement, and an end of cuitellate cam is connected with the anchorage head framework through bearing pin, and can rotate around bearing pin, and the other end and the roller of cuitellate cam remain contact condition; One end of auxilliary spring is fixed on the anchorage head framework, and its other end is connected with cuitellate cam, and the axis of two relative pull bars of auxilliary spring is symmetric arrangement; Roller is installed on the turning rolls, and the axis of two relative pull bars of roller is symmetric arrangement.Pallet can move along pull bar under external force, and simultaneously roller rolls along the outline of cuitellate cam, and main spring and auxilliary spring remain unchanged to the synthetic pretightning force that pallet produces basically in the moving process of pallet, promptly keep constant force.
Described pallet is provided with a centre bore and two bolts hole, and the axis of two relative centre bores of bolt hole is symmetric arrangement.
When country rock deformed, pallet can outwards move along the pull bar on-load and let pressures, and discharging stress, and pallet moves at on-load and can keep constant force when letting pressure.After the country rock release was accomplished, pallet is the travelling backwards reinforcement under the effect of main spring and auxilliary spring, realized the second consolidation to country rock.Because stress disturbance when deforming repeatedly, pallet on-load once more moves outward to let and presses and travelling backwards, forms " letting-Zhi-let " circulation supporting and the flexible support to country rock at country rock.The utility model design is ingenious, compact conformation, and the pallet shift motion is big, has not only solved the problem that existing anchor pole can not adapt to dynamic pressure soft-rock tunnel aximal deformation value, and except that anchor bar body, recycles after all detachable, practices thrift cost.
Description of drawings:
Fig. 1 is the structural representation of the utility model;
Fig. 2 is the structural representation of pallet.
Among Fig. 1: 1 anchor bar body; 2 pallets; 3 pull bars; 4 pretensions are regulated bolt; 5 main springs; 6 bearing pins; 7 cuitellate cams; 8 auxilliary springs; 9 anchorage head frameworks; 10 rollers; 11 turning rollss; 12 nuts; 13 anchoring agent.
Among Fig. 2: 2 pallets; 21 centre bores; 22 bolts hole.
The specific embodiment:
For technological means, creation characteristic that the utility model is realized, reach purpose and be easy to understand understanding with effect, below in conjunction with specific embodiment and diagram, further set forth the utility model.
As shown in Figure 1; A kind of dynamic pressure soft-rock tunnel is regulated bolt 4, main spring 5, bearing pin 6, cuitellate cam 7, auxilliary spring 8, anchorage head framework 9, roller 10, turning rolls 11 and nut 12 by anchor bar body 1, pallet 2, pull bar 3, pretension and is formed with scalable constant force pressure-relieving achor bar.Wherein, the afterbody of described anchor bar body 1 is provided with external screw thread, and the head of pull bar 3 is provided with internal thread, and anchor bar body 1 and pull bar 3 are connected through screw thread; Pallet 2 is enclosed within on the pull bar 3, and is connected with anchorage head framework 9 through pretension adjusting bolt 4 and nut 12; Turning rolls 11 is fixed on the afterbody of pull bar 3, and main spring 5 is enclosed within on the pull bar 3, and between turning rolls 11 and pallet 2; The axis of two cuitellate cam 7 relative pull bars 3 is symmetric arrangement, and an end of cuitellate cam 7 is connected with anchorage head framework 9 through bearing pin 6, and can rotate around bearing pin 6, and the other end of cuitellate cam 7 and roller 10 remain contact condition; One end of auxilliary spring 8 is fixed on the anchorage head framework 9, and its other end is connected with cuitellate cam 7, and the axis of two auxilliary spring 8 relative pull bars 3 is symmetric arrangement; Roller 10 is installed on the turning rolls 11, and the axis of two roller 10 relative pull bars 3 is symmetric arrangement.Pallet 2 can move along pull bar 3 under external force, and roller 10 rolls along the outline of cuitellate cam 7 simultaneously, and main spring 5 remains unchanged with the synthetic pretightning force that 8 pairs of pallets of auxilliary spring 2 produce basically in the moving process of pallet 2, promptly keeps constant force.
As shown in Figure 2, described pallet 2 is provided with a centre bore 21 and two bolts hole 22, and the axis of two bolt hole 22 relative centre bores 21 is symmetric arrangement.
During use; In boring good anchor hole, inject anchoring agent 13 earlier; Insert anchor bar body 1 then rapidly; On near the country rock the afterbody of anchor bar body 1, hang up anchor net (or anchor cable), the pallet 2 that will install pretension adjusting bolt 4 again is enclosed within on the pull bar 3, and then the head with pull bar 3 is connected through screw thread with the afterbody of anchor bar body 1.After anchoring agent 13 solidifies, require adjusting nut 12 and then the pretightning force of regulating anchor pole according to actual condition.
When the country rock of dynamic pressure soft-rock tunnel deformed, anchor bar body 1 was drawn with pallet 2.Form an integral body owing to the effect of the anchored force between anchor bar body 1 and the rock mass with rock mass; Pallet 2 is just letting pressure along with outwards moving along pull bar 3 on-loads under surrouding rock deformation and its action of pulling stress that is produced; Discharging stress, and pallet 2 moves to let at on-load and can keep constant force when pressing.After the country rock release was accomplished, pallet 2 travelling backwards reinforcement under the effect of main spring 5 and auxilliary spring 8 realized the second consolidation to country rock.Because stress disturbance when deforming repeatedly, pallet on-load once more moves outward to let and presses and travelling backwards, forms " letting-Zhi-let " circulation supporting and the flexible support to country rock at country rock.The utility model design is ingenious, compact conformation, and the pallet shift motion is big, except that anchor bar body, recycles after all detachable, practices thrift cost.
More than show and described basic principle, principal character and the advantage of the utility model.The technician of the industry should understand; The utility model is not restricted to the described embodiments; The principle of describing in the foregoing description and the manual that the utility model just is described; Under the prerequisite that does not break away from the utility model spirit and scope, the utility model also has various changes and modifications, and these variations and improvement all fall in the utility model scope that requires protection.The utility model requires protection domain to be defined by appending claims and equivalent thereof.

Claims (2)

1. a dynamic pressure soft-rock tunnel is with scalable constant force pressure-relieving achor bar; Regulating bolt, main spring, bearing pin, cuitellate cam, auxilliary spring, anchorage head framework, roller, turning rolls and nut by anchor bar body, pallet, pull bar, pretension forms; It is characterized in that: the afterbody of described anchor bar body is provided with external screw thread; The head of pull bar is provided with internal thread, and anchor bar body is connected through screw thread with pull bar; Tray sleeve and is regulated bolt and nut is connected with the anchorage head framework through pretension on pull bar; Turning rolls is fixed on the afterbody of pull bar, and main spring is enclosed within on the pull bar, and between turning rolls and pallet; The axis of two relative pull bars of cuitellate cam is symmetric arrangement, and an end of cuitellate cam is connected with the anchorage head framework through bearing pin, and can rotate around bearing pin, and the other end and the roller of cuitellate cam remain contact condition; One end of auxilliary spring is fixed on the anchorage head framework, and its other end is connected with cuitellate cam, and the axis of two relative pull bars of auxilliary spring is symmetric arrangement; Roller is installed on the turning rolls, and the axis of two relative pull bars of roller is symmetric arrangement.
2. a kind of dynamic pressure soft-rock tunnel according to claim 1 is characterized in that with scalable constant force pressure-relieving achor bar: described pallet is provided with a centre bore and two bolts hole, and the axis of two relative centre bores of bolt hole is symmetric arrangement.
CN2012200713611U 2012-02-24 2012-02-24 Telescopic constant force yield anchor bolt for dynamic pressure soft rock roadway Withdrawn - After Issue CN202441402U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200713611U CN202441402U (en) 2012-02-24 2012-02-24 Telescopic constant force yield anchor bolt for dynamic pressure soft rock roadway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200713611U CN202441402U (en) 2012-02-24 2012-02-24 Telescopic constant force yield anchor bolt for dynamic pressure soft rock roadway

Publications (1)

Publication Number Publication Date
CN202441402U true CN202441402U (en) 2012-09-19

Family

ID=46822855

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200713611U Withdrawn - After Issue CN202441402U (en) 2012-02-24 2012-02-24 Telescopic constant force yield anchor bolt for dynamic pressure soft rock roadway

Country Status (1)

Country Link
CN (1) CN202441402U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102536283A (en) * 2012-02-24 2012-07-04 安徽理工大学 Retractable constant force yielding anchor bolt for dynamical pressure soft rock lane
CN105422130A (en) * 2014-06-08 2016-03-23 衢州市优德工业设计有限公司 Method for regulating supporting pressure to carry out roadway surrounding rock supporting

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102536283A (en) * 2012-02-24 2012-07-04 安徽理工大学 Retractable constant force yielding anchor bolt for dynamical pressure soft rock lane
CN102536283B (en) * 2012-02-24 2014-03-05 安徽理工大学 Retractable constant force yielding anchor bolt for dynamical pressure soft rock lane
CN105422130A (en) * 2014-06-08 2016-03-23 衢州市优德工业设计有限公司 Method for regulating supporting pressure to carry out roadway surrounding rock supporting
CN105422130B (en) * 2014-06-08 2017-06-13 衢州市优德工业设计有限公司 It is a kind of to adjust the method that supporting pressure carries out supporting roadway surrounding rock

Similar Documents

Publication Publication Date Title
CN102536283A (en) Retractable constant force yielding anchor bolt for dynamical pressure soft rock lane
CN206397530U (en) A kind of self extending large deformation anchor rod
CN102400500B (en) Buckling restrained brace with tension interval protection member
CN201857612U (en) Extending-elastic rock-burst-resistant anchor rod
CN105626112A (en) Support device based on built-in type constant-resistance device and use method thereof
CN101929347A (en) Coordinated-deformation energy-absorption anchor rod suitable for mining high-stress large-deformation rock mass
CN205225302U (en) It hinders stock to let press to increase
CN104818723A (en) Anti-sliding pile for slope support
CN103541750A (en) Alternately-distributed energy-absorbing overlength combined anchor rod for mining and application method
CN202441402U (en) Telescopic constant force yield anchor bolt for dynamic pressure soft rock roadway
CN110925001B (en) Buffer protection device for preventing anchor cable from being ejected due to failure
CN102678147B (en) High-strength, constant-resistance extender for anchorage cables and usage thereof
CN102536280B (en) Resistance-increasing yielding anchor rod
CN202194135U (en) Anchor cable prestress load-compensating or unloading device
CN104481565A (en) Pressure-dispersive large-deformation self-adaptive anchor bolt
CN203347813U (en) Expansion shell type constant-resistance pre-stressed bolt
CN107244449A (en) A kind of flush retaining device
CN202325581U (en) Prestress anchor bolt support system suitable for dynamic loads
CN208380611U (en) A kind of anchor pole being suitable for different surrounding rock condition
CN204082188U (en) A kind of extruding, friction-type energy-absorption anchor rod
CN204113316U (en) A kind of interval screw rod body formula large deformation anchor rod
CN206841814U (en) A kind of flush retaining device
CN104818725B (en) Slope and land slide body locking and fastening system
CN109339840B (en) Anti-torsion large-deformation anchor rod
CN201823567U (en) Pull rod device of hydraulic cylinder of vertical roller mill

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Huainan Yuntian Electric Appliance Co. Ltd

Assignor: Anhui University Of Science And Technology

Contract record no.: 2013340000002

Denomination of utility model: Retractable constant force yielding anchor bolt for dynamical pressure soft rock lane

Granted publication date: 20120919

License type: Exclusive License

Record date: 20130121

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20120919

Effective date of abandoning: 20140305

AV01 Patent right actively abandoned

Granted publication date: 20120919

Effective date of abandoning: 20140305