Cast-steel harvester U-shaped universal joint provided with tie bar Download PDFInfo
- Publication number
- CN202427900U CN202427900U CN201220042137XU CN201220042137U CN202427900U CN 202427900 U CN202427900 U CN 202427900U CN 201220042137X U CN201220042137X U CN 201220042137XU CN 201220042137 U CN201220042137 U CN 201220042137U CN 202427900 U CN202427900 U CN 202427900U
- Authority
- CN
- China
- Prior art keywords
- harvester
- universal joint
- shaped
- cast steel
- lacing wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to a cast-steel harvester U-shaped universal joint provided with a tie bar, which uses cast-steel sodium silicate CO2 hardening sand to model. The tie bar is arranged on the U-shaped right side of the harvester universal joint and is connected with the upper part of the left side. The tie bar is condensed before the harvester U-shaped universal joint is condensed, so that the tie bar has a support force, cannot be broken by stress and plays a role for preventing a casting from deforming. The designed thickness of the tie bar is 50 percent of the thickness of the casting, i, e,. a/b=c/d=50 percent. The smelted ZG310-570 molten steel is crushed into a straight runner and enters into an inner runner and is then full in a cavity of the harvester universal joint provided with the tie bar. According to the cast-steel harvester U-shaped universal joint provided with the tie bar, the problem that the distance size between the U-shaped right side and the left side is unqualified due to casting deformation is solved, the production processes are reduced, and the production cost is reduced.
Description
Technical field
The utility model relates to the casting cast steel product, and especially cast steel is provided with the harvester U-shaped universal joint of lacing wire.
Background technology
At present casting cast steel harvester U-shaped universal joint is overproof because of the casting distortion apart from size between the U-shaped both sides, and it is qualified that the shaping through complicacy just can reach size, causes trouble and increase cost to production.
Summary of the invention
The harvester U-shaped universal joint that the utility model provides a kind of cast steel to be provided with lacing wire, lacing wire design for preventing to cast distortion, has overcome between universal joint U-shaped both sides apart from because of being out of shape overproof problem.
The utility model solves the technical scheme that its technical problem adopted: the harvester U-shaped universal joint, U-shaped right side, lacing wire, U-shaped left side, the last sand mold that are provided with lacing wire by drag box, cast steel type waterglass CO2 hardened sand, ingate, sprue, case outside fix, axis hole cast steel type waterglass CO2 hardened sand core, cast steel are formed.With the moulding of cast steel type waterglass CO2 hardened sand; Be provided with harvester U-shaped universal joint female die that cast steel is provided with lacing wire, ingate at following sand mold, axis hole cast steel type waterglass CO2 hardened sand core is positioned on the core print seat, lacing wire is located at U-shaped right side is connected with left upper portion; Be provided with harvester universal joint upper mold section, the sprue that cast steel is provided with lacing wire at last sand mold; Last sand mold and following sand mold are with case outside fix finger setting mould assembly; Melted ZG310-570 molten steel is full of the harvester U-shaped universal joint die cavity that is provided with lacing wire after pouring the sprue ingate.
Lacing wire thickness accounts for the α/b=c/d=10/20=20/40=50% of U-shaped left side and right upper portion thickness.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the utility model is further specified.
Accompanying drawing is the structure chart that cast steel is provided with the 4y B-2 type wheat harvester U-shaped universal joint of lacing wire.
Fig. 1 is the B-B profile of Fig. 2.
Fig. 2 is the A-A profile of Fig. 1.
Among the figure 1, sand mold down, 2, cast steel type waterglass CO2 hardened sand, 3, ingate; 4 sprues, 5, the case outside fix, 6, axis hole cast steel type waterglass CO2 hardened sand core; 7, cast steel is provided with the harvester U-shaped universal joint of lacing wire, and 8, the U-shaped right side, 9, lacing wire; 10, U-shaped left side, 11, go up sand mold.
The specific embodiment
In accompanying drawing 1,2; Cast steel type waterglass CO2 hardened sand 2 moulding with ZGS96-42Q-30 sand; Be provided with female die, the ingate 3 that cast steel is provided with the harvester U-shaped universal joint 7 of lacing wire 9 on the sand mold 1 down; The cast steel type waterglass CO2 hardened sand core 6 of axis hole ZG96-42Q-30 sand is positioned on the corresponding core print seat; The α of lacing wire 9=10 millimeter c=20 millimeter is located at the top b=20 millimeter d=40 millimeter that U-joint 7 connects left side 10 and right side 8, makes lacing wire 9 first condensation before cast steel is provided with harvester U-shaped universal joint 7 condensations of lacing wire have support force and is not broken the effect that prevents to cast distortion of playing by stress again; Be provided with harvester U-shaped universal joint 7 upper mold sections, the sprue 4 that cast steel is provided with lacing wire 9 at last sand mold 11; Last sand mold 11 is located mould assemblys with following sand mold 1 with case outside fix pin 5; Melted ZG310-570 molten steel pours and is full of harvester universal joint 7 die cavities that cast steel is provided with lacing wire after sprue 4 gets into ingate 3 again.In order to prevent distortion, after heat treatment, to remove lacing wire 9 just cast steel is provided with the harvester U-shaped universal joint 7 of lacing wire 9.
Lacing wire thickness is the α/b=c/d=10/20=20/40=50% that accounts for U-joint top thickness.
Claims (2)
1. a cast steel is provided with the harvester U-shaped universal joint of lacing wire; Harvester U-shaped universal joint, U-shaped right side, lacing wire, U-shaped left side, last sand mold by playing sand mold, cast steel type waterglass CO2 hardened sand, ingate, sprue, case outside fix, axis hole cast steel type waterglass CO2 hardened sand core, cast steel to be provided with lacing wire are formed, and it is characterized in that: with the moulding of cast steel type waterglass CO2 hardened sand; Being provided with harvester U-shaped universal joint female die, ingate, the axis hole that cast steel is provided with lacing wire at following sand mold is connected with left upper portion with the right side that cast steel type waterglass CO2 hardened sand core is positioned on the corresponding core print seat, lacing wire is located at U-shaped; Be provided with harvester U-shaped universal joint upper mold section, the sprue that cast steel is provided with lacing wire at last sand mold; Last sand mold and following sand mold are with case outside fix finger setting mould assembly; Melted ZG310-570 molten steel is full of the harvester U-shaped universal joint die cavity that cast steel is provided with lacing wire after pouring the sprue ingate.
2. cast steel according to claim 1 is provided with the harvester U-shaped universal joint of lacing wire, it is characterized in that: lacing wire thickness accounts for the α/b=c/d=10/20=20/40=50% of U-shaped left side and right upper portion thickness.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201220042137XU CN202427900U (en) | 2012-01-21 | 2012-01-21 | Cast-steel harvester U-shaped universal joint provided with tie bar |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201220042137XU CN202427900U (en) | 2012-01-21 | 2012-01-21 | Cast-steel harvester U-shaped universal joint provided with tie bar |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202427900U true CN202427900U (en) | 2012-09-12 |
Family
ID=46777375
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201220042137XU Expired - Fee Related CN202427900U (en) | 2012-01-21 | 2012-01-21 | Cast-steel harvester U-shaped universal joint provided with tie bar |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202427900U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103632836A (en) * | 2013-12-04 | 2014-03-12 | 中国矿业大学 | Preparation method for metallic glass magnetic core |
WO2017088332A1 (en) * | 2015-11-26 | 2017-06-01 | 江苏科技大学 | Casting apparatus and casting method for anchor fluke |
CN110064731A (en) * | 2019-04-25 | 2019-07-30 | 河南广瑞汽车部件股份有限公司 | The vertical line casting device and casting technique of spring block after a kind of heavy truck |
-
2012
- 2012-01-21 CN CN201220042137XU patent/CN202427900U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103632836A (en) * | 2013-12-04 | 2014-03-12 | 中国矿业大学 | Preparation method for metallic glass magnetic core |
CN103632836B (en) * | 2013-12-04 | 2015-11-04 | 中国矿业大学 | The preparation method of Metglas core |
WO2017088332A1 (en) * | 2015-11-26 | 2017-06-01 | 江苏科技大学 | Casting apparatus and casting method for anchor fluke |
CN110064731A (en) * | 2019-04-25 | 2019-07-30 | 河南广瑞汽车部件股份有限公司 | The vertical line casting device and casting technique of spring block after a kind of heavy truck |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202427900U (en) | Cast-steel harvester U-shaped universal joint provided with tie bar | |
CN204018648U (en) | A kind of cast structure being improved riser feeding distance by core heating | |
CN202877483U (en) | Medium-small type and large-batch steel casting production and casting mould | |
CN201231300Y (en) | Brake-arm forging die | |
CN204886505U (en) | Low pressure casting motor casing with spiral water channel structure | |
CN201979039U (en) | Double-metal-liquid sand mold capable of casting a plurality of composite hammers in one step | |
CN104368760B (en) | A kind of casting method of step aluminium alloy oil sump and special casting mould thereof | |
CN202639220U (en) | Investment casting gating system | |
CN202199726U (en) | Sand mould for brake hub | |
CN206425486U (en) | A kind of vertical line casts air conditioning for automobiles swash plate core mold | |
CN103464692B (en) | A kind of casting method of tubular cast | |
CN209849857U (en) | Die-casting mold core structure for molding cylinder body | |
CN202517002U (en) | Sand mold with multifunctional open riser on steel wire rope winding roller | |
CN102211146B (en) | Combined mold for extra-large casting and forging | |
CN203109175U (en) | Improved forming casting die for elevator groove wheel casting | |
CN201783621U (en) | Iron casting pouring device | |
CN201776396U (en) | Camshaft casting die in vertical parting production line | |
CN206811087U (en) | A kind of crossbeam running gate system | |
CN202180192U (en) | Vehicle lock core die | |
CN101947626A (en) | Forging mold for cantilever type hardware fitting base of electrified railway contact network parts | |
CN104338903B (en) | A kind of running gate system of wheel hub | |
CN203470832U (en) | Pouring gate structure of molding wheel dies | |
CN105127400B (en) | A kind of driving device for locomotives gear-box mould | |
CN211248235U (en) | Casting template of vortex casting unit with heat preservation structure | |
CN208976756U (en) | Casting mould with venthole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120912 Termination date: 20130121 |
|