CN202423985U - Rapidly installed spacing bar transportation device - Google Patents

Rapidly installed spacing bar transportation device Download PDF

Info

Publication number
CN202423985U
CN202423985U CN 201120519060 CN201120519060U CN202423985U CN 202423985 U CN202423985 U CN 202423985U CN 201120519060 CN201120519060 CN 201120519060 CN 201120519060 U CN201120519060 U CN 201120519060U CN 202423985 U CN202423985 U CN 202423985U
Authority
CN
China
Prior art keywords
side plate
magnet
plate
transportation device
lower side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120519060
Other languages
Chinese (zh)
Inventor
张志强
苗艳玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jiaozuo Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
Jiaozuo Power Supply Co of Henan Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiaozuo Power Supply Co of Henan Electric Power Co filed Critical Jiaozuo Power Supply Co of Henan Electric Power Co
Priority to CN 201120519060 priority Critical patent/CN202423985U/en
Application granted granted Critical
Publication of CN202423985U publication Critical patent/CN202423985U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Forklifts And Lifting Vehicles (AREA)

Abstract

The utility model discloses a rapidly installed spacing bar transportation device which comprises a right side plate and a left side plate, wherein two pulleys are arranged between the left side plate and the right side plate; the left side plate comprises a left upper side plate and a left lower side plate which are respectively provided with a magnet; and a first magnet on the left upper side plate and a second magnet on the left lower side plate are connected. The rapidly installed spacing bar transportation device provided by the utility model can transport spacing plates on the ground to the corresponding position of an electricity transmission lead by virtue of the pulleys, thereby saving labor and lowering the dangerousness of high-altitude work for the working personnel.

Description

The conductor spacer Handling device of Fast Installation
Technical field
The utility model relates to a kind of aid of power industry, is specifically related to a kind of device of carrying conductor spacer.
Background technology
On transmission line, need the installation interval rod, the power transmission sequence bundle conductor is relative motion between the siding stopping lead and the geometry that under normal operation, keeps bundle conductor with the main application of conductor spacer.Existing conductor spacer installation process is following: the staff moves to conductor spacer on the iron tower earlier, relies on artificial with the unlucky relevant position to transmission pressure of conductor spacer afterwards.This process wastes time and energy on the one hand, the danger of staff's work high above the ground is bigger on the other hand.In addition, though the lifting device that can conductor spacer be transported to aerial condutor is arranged in the prior art, the installation and removal of this conductor spacer on aerial condutor are more bothersome.
The utility model content
The purpose of the utility model is the deficiency to above-mentioned prior art, and a kind of loading and unloading conductor spacer Handling device of Fast Installation eaily is provided.
The technical scheme of the utility model realizes in the following manner: a kind of conductor spacer Handling device of Fast Installation; Comprise right plate and left plate; Be provided with two pulleys between left plate and the right plate; Said left plate comprises upper left side plate and left lower side panel, and upper left side plate and left lower side panel respectively are provided with a magnet, first magnet of upper left side plate with link to each other with second magnet of left lower side panel.
Be provided with suspended axle between said upper left side plate and the right plate, be fixed with drag-line on the suspended axle.
The utility model can rely on pulley that ground space bar is transported to the position of corresponding transmission pressure, has not only saved the labour, has also reduced the danger of staff's work high above the ground.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Fig. 2 is the enlarged diagram of left plate and right plate connecting portion.
Embodiment
Shown in accompanying drawing; A kind of conductor spacer Handling device of Fast Installation; Comprise right plate 5 and left plate, be provided with two pulleys 2 between left plate and the right plate 5, said left plate comprises upper left side plate 1 and left lower side panel 3; Upper left side plate 1 respectively is provided with a magnet with left lower side panel 3, the first magnet 4-1 of upper left side plate 1 with link to each other with the second magnet 4-2 of left lower side panel 3.
Be provided with suspended axle 6 between said upper left side plate 1 and the right plate 5, be fixed with drag-line 7 on the suspended axle 6.
The utility model use is following: suspension slip rope on below the pulley 2 during use; Rotate left lower side panel, aerial condutor is placed between two pulleys; Utilize magnet that left lower side panel and upper left side plate are coupled together afterwards; Utilize drag-line to move whole device to relevant position again, conductor spacer is fixed on slip rope one end, spur the position that the slip rope other end can lift conductor spacer needs afterwards.
The first magnet 4-1 and the second magnet 4-2 not only attract each other, and the cross section of the first magnet 4-1 also presents down " L " type, and when following pulley was stressed, second magnet moved downward, and are stuck on the second magnet 4-2, make that the connection of left side plate is firm.

Claims (2)

1. the conductor spacer Handling device of a Fast Installation; Comprise right plate (5) and left plate; Be provided with two pulleys (2) between left plate and the right plate (5); It is characterized in that: said left plate comprises upper left side plate (1) and left lower side panel (3), and upper left side plate (1) and left lower side panel (3) respectively are provided with a magnet, first magnet (4-1) of upper left side plate (1) with link to each other with second magnet (4-2) of left lower side panel (3).
2. the conductor spacer Handling device of Fast Installation according to claim 1 is characterized in that: be provided with suspended axle (6) between said upper left side plate (1) and the right plate (5), be fixed with drag-line (7) on the suspended axle (6).
CN 201120519060 2011-12-13 2011-12-13 Rapidly installed spacing bar transportation device Expired - Fee Related CN202423985U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120519060 CN202423985U (en) 2011-12-13 2011-12-13 Rapidly installed spacing bar transportation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120519060 CN202423985U (en) 2011-12-13 2011-12-13 Rapidly installed spacing bar transportation device

Publications (1)

Publication Number Publication Date
CN202423985U true CN202423985U (en) 2012-09-05

Family

ID=46748711

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120519060 Expired - Fee Related CN202423985U (en) 2011-12-13 2011-12-13 Rapidly installed spacing bar transportation device

Country Status (1)

Country Link
CN (1) CN202423985U (en)

Similar Documents

Publication Publication Date Title
CN203596541U (en) Cable duct cover plate hoisting device
CN203373022U (en) Self-lifting type cableway transportation device
CN102237654B (en) Method for replacing jumper string using tool at double angle hanging point
CN103274310A (en) Self-lifting type cableway transporting device
CN201587828U (en) Gantry crane
CN202423985U (en) Rapidly installed spacing bar transportation device
CN103470057B (en) A kind of high-altitude component hoisting construction method
CN203318561U (en) Disc type transportation line of scraped car disassembly line
CN205183582U (en) Plate shearing machine is with transition receiving device
CN202226623U (en) Automatic lifting and dumping device
CN203345964U (en) Gantry crane vehicle adopting air cushion carrying
CN202423986U (en) Spacer installation device
CN202508813U (en) Detachable field distribution transformer transporting vehicle
CN203781713U (en) High slope support material transport device
CN203626267U (en) Building roof lifting device
CN203095395U (en) Steel plate lifting rigging
CN202424002U (en) Spacer rod hoisting tool used safely
CN202718073U (en) Mobile draw bar locking device
CN201882809U (en) Door type cantilever steel frame hoisting equipment used for high hoisting
CN202564892U (en) High voltage line insulator chain horizontal hoisting stretcher
CN202924676U (en) Rapid lifting device
CN202864670U (en) Fretsaw wire turn transportation lifting appliance
CN205314112U (en) Be used for automatic tensioning equipment of long anchor rope
CN203306988U (en) High-place operation auxiliary transfer car
CN202880727U (en) Lifting device for large lifting platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: JIAOZUO POWER SUPPLY COMPANY, STATE GRID HUNAN ELECTRIC POWER COMPANY

Effective date: 20140130

Owner name: JIAOZUO POWER SUPPLY COMPANY, STATE GRID HUNAN ELE

Effective date: 20140130

C56 Change in the name or address of the patentee

Owner name: JIAOZUO POWER SUPPLY COMPANY, STATE GRID HUNAN ELE

Free format text: FORMER NAME: HENAN ELECTRIC POWER COMPANY, JIAOZUO POWER SUPPLY COMPANY

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 454150 JIAOZUO, HENAN PROVINCE TO: 100031 XICHENG, BEIJING

CP01 Change in the name or title of a patent holder

Address after: 454150 No. 299 South Tower Road, Henan, Jiaozuo

Patentee after: JIAOZUO POWER SUPPLY COMPANY OF STATE GRID HENAN ELECTRIC POWER Co.

Address before: 454150 No. 299 South Tower Road, Henan, Jiaozuo

Patentee before: Jiaozuo Power Supply Company, Henan Electric Power Corp.

CP03 Change of name, title or address
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20140130

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: JIAOZUO POWER SUPPLY COMPANY OF STATE GRID HENAN ELECTRIC POWER Co.

Address before: 454150 No. 299 South Tower Road, Henan, Jiaozuo

Patentee before: JIAOZUO POWER SUPPLY COMPANY OF STATE GRID HENAN ELECTRIC POWER Co.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120905

Termination date: 20181213