CN202423967U - Adjusting auxiliary clamp of wire sag - Google Patents

Adjusting auxiliary clamp of wire sag Download PDF

Info

Publication number
CN202423967U
CN202423967U CN2011205035456U CN201120503545U CN202423967U CN 202423967 U CN202423967 U CN 202423967U CN 2011205035456 U CN2011205035456 U CN 2011205035456U CN 201120503545 U CN201120503545 U CN 201120503545U CN 202423967 U CN202423967 U CN 202423967U
Authority
CN
China
Prior art keywords
clamp
jig
bolt
tool
auxiliary clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011205035456U
Other languages
Chinese (zh)
Inventor
张广亚
高宇
刘庆涛
杨侃
菅志远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Henan Engineering Co Ltd
Original Assignee
Henan No2 Thermal Power Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan No2 Thermal Power Construction Co ltd filed Critical Henan No2 Thermal Power Construction Co ltd
Priority to CN2011205035456U priority Critical patent/CN202423967U/en
Application granted granted Critical
Publication of CN202423967U publication Critical patent/CN202423967U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a clamp, in particular to an adjusting auxiliary clamp of a wire sag used in 500-kilovolt lines, which comprises a clamp tool I and a clamp tool II matched with the clamp tool I. The clamp tool I and the clamp tool II are fastened through a bolt and a nut arranged at the upper end of the bolt, a screw hole is drilled at one end of the clamp tool I, and a U-shaped groove is arranged at the other end of the clamp tool I. A circular arc groove is arranged on the lower lateral face of the clamp tool I. Two ends of the clamp tool II are respectively provided with a U-shaped groove, a circular arc groove corresponding to the circular arc groove on the lower lateral face of the clamp I is arranged on the upper lateral face of the clamp II, and the lower end of the bolt is installed in the U-shaped groove of the clamp II through a pin. The clamp has two clamp tools, four circular arc grooves are arranged on the clamps to fix a wire, and the two clamp tools are fastened through the bolt and the nut. The clamp is simple in structure and convenient to operate, improves construction efficiency, and improves stringing pass percent.

Description

Lead sag adjustment auxiliary clamp
Technical field
The utility model relates to a kind of anchor clamps, is specifically related to a kind of 500 KV lead sags adjustment auxiliary clamp.
Background technology
After voltage reached 500 kilovolts, lead was very serious to the corona phenomenon of air, especially big greasy weather, violent corona even can cause discharge accident.In order to reduce corona, must strengthen the conductor equivalent diameter, the Electric Field Distribution around the homogeneous conductor.But if with very large diameter solid conductor, not only weight is big, and because skin effect, lead is middle can not to be effectively utilized.Thereby produced and split into many way to a lead; The diameter of wire that so just has been equivalent to overstriking; Compare with solid conductor, bundle conductor can make that the inductance of power transmission line reduces, electric capacity increases, and its wave impedance to alternating current is reduced; Can contain the generation of corona well, improve the ability to transmit electricity of circuit.500 kilovolts of bundle conductors generally are that every phase conductor is formed with 4 less leads in cross section; At a distance of 0.5 meter, during Construction of Tension Stringing, must adjust to 4 root lead sags the same between intraphase conductor; Remain on the par line, could guarantee the mounting process and the security of operation of follow-up conductor spacer.Now in 500 KV inlet wires constructions, especially on the hills, the mountain area, when Construction of Tension Stringing is carried out in the area, high mountain, the sub-bank of the ubiquity bundle conductor adjustment situation of difficult of hanging down.End lead during Construction of Tension Stringing hangs up properly, and carries out the degree of tightness adjustment at the other end with strand mill or Lever Blocks, begins from distal-most end, and one grade of one grade of ground is to the leveling of stringing end.But; Owing to receive the frictional force of strain section length, landform, the iron tower discrepancy in elevation, releasing pulley, the influence of wire density, this several kinds of phenomenons often appear in sub-conductor: (1) this empty low and next outage, and (2) stringing end sag high (low) goes out a lot; Far-end sag still low (height); (3) the unexpected play of sub-conductor, the good sub-bank that causes adjusted the changing of haveing hair hang down have to be readjusted.Above-mentioned phenomenon causes the sag observed efficiency in the middle of the stringing low, and line transfer is slow, and construction is wasted time and energy.
Summary of the invention
The utility model is big, the problem that wastes time and energy of lead sag adjustment difficulty during to above-mentioned stringing, and a kind of lead sag adjustment auxiliary clamp is provided, and makes that the adjustment of lead sag is simple, has improved efficiency of construction greatly.
For realizing above-mentioned purpose, the technical scheme that the utility model is taked is:
A kind of lead sag adjustment auxiliary clamp; Comprise the jig I and with the supporting jig II of jig I, said jig I and jig II are fastening with the nut that is arranged on bolt upper end through bolt, jig I one end is drilled with screwed hole; The other end has U-lag, and jig I downside is provided with arc groove; Said jig II two ends all have U-lag, and jig II upper side is provided with and the corresponding arc groove of jig I downside arc groove, and said bolt lower end is installed in the U-lag of jig II through pin.
Be provided with four arc grooves on said jig I and the jig II.
Said nut is a wing nut.
The utility model has two jigs, and jig is provided with four arc grooves, is used for fixing lead, and two jigs are fastening through bolt, nut, and the utility model is simple in structure, and is easy to operate, improved efficiency of construction, improved the stringing qualification rate.
Description of drawings
Fig. 1 the utility model structural representation.
Fig. 2 the utility model structure jig I structural representation.
Fig. 3 the utility model structure jig II structural representation.
Embodiment
Like Fig. 1, the utility model structural representation, a kind of lead sag adjustment auxiliary clamp; Comprise jig I 2 and with the supporting jig II 3 of jig I 2, jig I 2 is fastening, as shown in Figure 2 with the wing nut 4 that is arranged on bolt 1 upper end through bolt 1 with jig II 3; The utility model jig I structural representation, jig I 2 one ends are drilled with screwed hole 8, and the other end has U-lag 9; Jig I 2 downsides are provided with arc groove 6, and are as shown in Figure 3, the utility model jig II structural representation; Jig II 3 two ends all have U-lag 10; Jig II 3 upper sides are provided with and jig I 2 downside arc grooves 6 corresponding arc grooves 7, and bolt 1 lower end 5 is installed in the U-lag 10 of jig II 3 through pinning, and are provided with four arc grooves on jig I 2 and the jig II 3.
When Construction of Tension Stringing, arrange to install the auxiliary clamp personnel of ascending a height in advance along the line according to the landform field condition and put in place, the high-altitude personnel ascended a height before stringing begins and carry out the preparation that auxiliary clamp is installed, and waiting rolls off the production line installs notice.When the sag of one grade of tension stringing section far-end or several grades of leads was tightened to the standard sag, the commanding promptly notified this location personnel to roll off the production line to begin to install auxiliary clamp.An end of jig I 2 links together with an end of jig II 3 through round bolt hole 8 and bolt 1, wing nut 4 before installing; The other end all is up and down a U type groove 6; Rotating bolt 1 is opened auxiliary clamp; The end that to open again after snapping on the lead rotates fastening bolt 1 altogether, tightens with wing nut 4.A bolt only need be installed in the high-altitude, fastening two wing nuts 4.Because what adopt is wing nut, so only with hand is fastening get final product, need not other specific purpose tools, after the dress auxiliary clamp tightens, the sub-bank of the lead of back is vertical just be fixed constant.Progressively be installed to one grade of the near-end of tension stringing section by that analogy, the work of this section stringing is promptly accomplished.

Claims (3)

1. a lead sag is adjusted auxiliary clamp; It is characterized in that: comprise the jig I and with the supporting jig II of jig I; Said jig I and jig II are fastening with the nut that is arranged on the bolt upper end through bolt; Jig I one end is drilled with screwed hole, and the other end has U-lag, and jig I downside is provided with arc groove; Said jig II two ends all have U-lag, and jig II upper side is provided with and the corresponding arc groove of jig I downside arc groove, and said bolt lower end is installed in the U-lag of jig II through pin.
2. according to the said lead sag adjustment of claim 1 auxiliary clamp, it is characterized in that: be provided with four arc grooves on said jig I and the jig II.
3. according to the said lead sag adjustment of claim 1 auxiliary clamp, it is characterized in that: said nut is a wing nut.
CN2011205035456U 2011-12-07 2011-12-07 Adjusting auxiliary clamp of wire sag Expired - Fee Related CN202423967U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205035456U CN202423967U (en) 2011-12-07 2011-12-07 Adjusting auxiliary clamp of wire sag

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205035456U CN202423967U (en) 2011-12-07 2011-12-07 Adjusting auxiliary clamp of wire sag

Publications (1)

Publication Number Publication Date
CN202423967U true CN202423967U (en) 2012-09-05

Family

ID=46748693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205035456U Expired - Fee Related CN202423967U (en) 2011-12-07 2011-12-07 Adjusting auxiliary clamp of wire sag

Country Status (1)

Country Link
CN (1) CN202423967U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103837712A (en) * 2012-11-23 2014-06-04 海洋王(东莞)照明科技有限公司 Battery fixation structure, battery pin-prick test device and battery pin-prick test method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103837712A (en) * 2012-11-23 2014-06-04 海洋王(东莞)照明科技有限公司 Battery fixation structure, battery pin-prick test device and battery pin-prick test method

Similar Documents

Publication Publication Date Title
WO2012088987A1 (en) Maintenance tool for insulator of direct current transmission line
CN203352100U (en) Windproof stay wire cross-arm device for power transmission line
CN205123185U (en) Non -maintaining insulator wire fixation clamp
CN101546894A (en) Method for replacing 220KV steel pipe tower composite insulator electrifiedly
CN206546747U (en) A kind of wind-deviation insulator chain
CN202423967U (en) Adjusting auxiliary clamp of wire sag
CN203942204U (en) The live line working of a kind of 35kV supply line is carried line apparatus with insulation
CN201498949U (en) Adjustable connecting hardware fitting for phase spacer
CN103779809B (en) The two oidiospore wire pitch operational method of charged adjustment
CN211089065U (en) High-voltage cross arm
CN102856839A (en) Wire lifting machine for wiring construction
CN102751687B (en) Drainage armour clamp of high voltage alternative current circuit tension resisting tower
CN202090629U (en) "Inverted-U-shaped" truss structure of main variable ingoing line used for 750 kV transformer station in Riyue Mountain
CN201438617U (en) Electric lifting tool for linear insulator string on ZM tower
CN209277668U (en) A kind of reinforced electric wire cross-arm
CN103795003B (en) Line apparatus is carried in the insulation of 35kV supply line live line working
CN203039311U (en) Shock-resistant bus duct system used for wind power generation
CN202749781U (en) Three-wire respective puling type wind deflection prevention structure of power transmission line
CN201008028Y (en) Mouse cage type rigid bridle wire device
CN210111556U (en) High-stability protection hardware fitting for high-voltage power transmission equipment
CN107237535A (en) A kind of unilateral cross-arm anchor support used for transmission line
CN202856239U (en) Wire lifting device for wire laying construction
CN108462099B (en) Method for replacing double-connection double-hanging-point suspension string insulator of +/-800 kV extra-high voltage line
CN206293856U (en) A kind of copper-alloy stranded conductor bracing cable is pressed from both sides
CN213584923U (en) Auxiliary tool for replacing tension-resistant double-string insulator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 450051 Zhengzhou, China Central Plains District, North Street, No. 2 West Station

Patentee after: China Electric Power Construction Group Henan engineering company

Address before: 450051 Zhengzhou, China Central Plains District, North Street, No. 2 West Station

Patentee before: Henan No.2 Thermal Power Construction Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120905

Termination date: 20171207

CF01 Termination of patent right due to non-payment of annual fee